TenderDekho Logo
Active GEM

Indian Army Heavy Duty Kitchen Cooler Components Tender Bikaner Rajasthan 2026 – 25% Quantity Flex, ATC, Local Service

Bid Publish Date

10-Oct-2026, 2:35 pm

Bid End Date

20-Oct-2026, 3:00 pm

Progress

Issue10-Oct-2026, 2:35 pm
AwardPending

Tender Overview

The Indian Army (Department Of Military Affairs) seeks delivery of heavy duty kitchen cooling components in BIKANER, RAJASTHAN with 334001 PIN. Scope includes 4-grill heavy duty coolers, Tin Shed Iron structures with square pipes, Iron Jali for gas bank, Iron Ducting for cooler, chimney and clamps. As per GeM terms, bidder must allow up to 25% quantity variance during contract execution. Local service support at the station is required, and bidders must provide item samples before TEC opening. The opportunity targets suppliers capable of delivering rugged, army-grade metal fabrication for field kitchens in a constrained procurement context.

Technical Specifications & Requirements

  • No explicit technical specs in the tender data; BOQ lists 5 items with N/A quantities. Expect steel framing, grills, and ducting components suitable for heavy-duty kitchen cooling systems.
  • Mandatory bidder actions include sample submission prior to TEC, removal of blacklisting risk, and establishment of a local service centre at the station.
  • Buyer terms authorize a 25% quantity increase/decrease and specify delivery timing anchored to original/delivered orders, with a minimum extension rule of 30 days.
  • Documentation for vendor code creation requires PAN, GSTIN, cancelled cheque, and EFT mandate notarized by bank.
  • Emphasis on compliance with government procurement norms and GeM eligibility for defense sector supply chains.

Terms, Conditions & Eligibility

  • EMD and estimated values are not disclosed; bidders must prepare for quantity flexibility up to 25%.
  • Submit: PAN card, GSTIN, cancelled cheque, and EFT mandate certified by bank.
  • Ensure not blacklisted by any government department on GeM and maintain a local service centre at the station.
  • Sample submission prior to TEC opening is mandatory; delivery timeline ties to original delivery order with option extension rules.

Key Specifications

  • N/A specifications provided; anticipate 4-grill heavy duty kitchen cooler components and associated metal framing

  • Tin shed iron structures with square pipes, iron Jali for gas bank, iron ducting for cooler, chimney, clamps

  • Local service centre requirement at Bikaner station for after-sales support

  • Sample submission prior to TEC opening; no blacklisting with government departments

Terms & Conditions

  • 25% quantity variation allowed at contract placement and during currency

  • Delivery period linked to original delivery order with minimum 30 days extension

  • Sample submission required before TEC; local service centre mandatory

Important Clauses

Payment Terms

Payment terms are not specified; bidders should expect standard GeM terms and defense procurement norms

Delivery Schedule

Delivery period starts from last date of original delivery order; extended time calculated as (increase in quantity/original quantity) × original period, minimum 30 days

Penalties/Liquidated Damages

LD terms not specified; expect standard defense procurement penalties if delivery/performance failures occur

Bidder Eligibility

  • Not blacklisted by any government department on GeM

  • Local service centre available at Bikaner station

  • Ability to provide item samples prior to TEC and comply with defense procurement norms

Advertisement

Tender Data

Bid Details

Quantity

103

Category

Heavy Duty Cooler for Kitchen with 04 Grills

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

1

Past Performance

20 %

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Heavy Duty Cooler for Kitchen with 04 Grills , Tin Shed Iron with Square Pipes , Iron Jali for Gas Bank , Iron Ducting for cooler and Chimney , Clamps

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

BIKANER

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-BIKANERBIKANER--115-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-10016028.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

Heavy Duty Cooler for Kitchen with 04 Grills

Heavy Duty Cooler for Kitchen with 04 Grills

1 nos Delivery: 15 days
#2

Tin Shed Iron with Square Pipes

Tin Shed Iron with Square Pipes

1 nos Delivery: 15 days
#3

Iron Jali for Gas Bank

Iron Jali for Gas Bank

1 nos Delivery: 15 days
#4

Iron Ducting for cooler and Chimney

Iron Ducting for cooler and Chimney

60 sqrft Delivery: 15 days
#5

Clamps

Clamps

40 nos Delivery: 15 days
Advertisement

Categories 9

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST certificate

2

PAN card

3

Experience certificates (defense/industrial metal fabrication preferred)

4

Financial statements (latest audited or TDS-based)

5

EMD documents (as applicable under GeM for defense items)

6

Technical bid documents (sample data, material specs if provided)

7

OEM authorizations (if applicable)

8

Bank EFT mandate (certified)

9

Cancelled cheque copy

Frequently Asked Questions

Key insights about RAJASTHAN tender market

How to bid for the Indian Army kitchen cooler components tender in Bikaner

Bidders must register on GeM, verify non-blacklist status, and submit samples before TEC. Provide PAN, GSTIN, cancelled cheque, and EFT mandate. Ensure local service centre at Bikaner, and comply with 25% quantity variation. Include all required documents with the bid.

What documents are required for defense metal fabrication bids in Rajasthan

Submit GST certificate, PAN card, financial statements, experience certificates, EMD documents, technical bid with samples, OEM authorizations if applicable, and bank-certified EFT mandate. Ensure GeM vendor code creation documentation is complete.

What are the delivery terms for the Indian Army procurement in Bikaner

Delivery begins from the last date of the original delivery order. If quantity increases, the additional time = (increased quantity/original quantity) × original delivery period, with a minimum of 30 days. Extended time may apply under option clause.

What standards or certifications are required for these kitchen components

The tender data does not specify exact standards; bidders should ensure conformity with general defense fabrication norms, and provide samples for TEC. Local service capability and reliable post-sale support are essential for acceptance.

How does the quantity option clause affect pricing and delivery

The purchaser may increase/decrease quantity by up to 25% at contract, with rates fixed. Delivery extensions follow the calculated formula, ensuring continued adherence to contracted rates while adjusting for changed volumes.

What is the process to submit samples before TEC opening

Bidders must present item samples for each line prior to TEC opening. Samples are evaluated against functional fit and material compatibility with kitchen cooling requirements. Ensure samples are representative of final production units.

Advertisement