Steering gear box overhauling kit,Front axel major repair lit bearing Oil seal Gasket kit lock wash
Indian Army
BANGALORE, KARNATAKA
Progress
RAQuantity
72
Category
Clutch assy
Bid Type
Two Packet Bid
Indian Army invites bids for the procurement of clutch and gearbox spare parts and related assemblies for extensive vehicular maintenance. The scope covers 63 items across clutch assemblies, gear box components, ignition and electrical parts, door lock sets, windscreen components, and hydraulic repair kits, with testing and commissioning included. The location is BANGALORE, KARNATAKA, and bidders should align with a local registered address within 50 KM of ASC Centre (North) for service efficacy. The bid emphasizes end-to-end refurbishment: removal, rectification, replacement of damaged parts, road-test after reassembly, and a comprehensive fitment check. A key differentiator is the breadth of items and on-site trial requirements, demanding strong inventory and workshop capabilities. Unique clauses include an option to adjust quantity up to 25% and extended delivery time calculations; suppliers must comply with these terms.
Option Clause: quantity variation up to 25% at contracted rates
Scope: Supply, Installation, Testing and Commissioning of all listed items
Locality: bidder must have a local address within 50 KM of ASC Centre (North) for timely supply
Not detailed in data; typical government SITC may require milestone payments post inspection and commissioning or as per contract.
Delivery period linked to last date of original delivery order; extended time computed by (increased quantity / original quantity) × original delivery period, minimum 30 days.
Not specified in data; ATC may outline penalties for late delivery and performance shortfalls.
Local address within 50 KM of ASC Centre (North) for service delivery
Proven experience in SITC of automotive clutch and gearbox components
Compliance with all uploaded certificates/documents as required by bid and ATC
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Clutch assy , Pressure Plate Set , Pressure release bearing set , Clutch master cylinder assy , Clutch repair master kit , Vaccum Cylinder hose head assy , Clutch pedal bearing set , Clutch top rod assy , Synchronizer cone , Sychronizer ring , Shift Slivering , Shifter assy , Reverse gear bearing , Extra gear bearing , Connection Shifter Rail , Main Shaft oil seal , Gear Box packing kit , Gear Box fit assy , Gear sleeves assy , The above mentioned gear box remove the gear box assy send to the lathwork rectify the fault replaced the all damaged parts and re-assembled the gear box. , The above mentioned clutch and gear box check to re-fit the veh Test the veh on rd trail run test done , Ignition Switch , Starting coil relay with base assy , Fuel solenoid switch , 30A fuse base assy set , 5mm Wire , Main Realy , Holding Realy , Fly Wheel Sensor , The above Break down veh mentioned unserviceable part remove and replace with new parts rectified the fault check and trail run on rd test done , Break master cylinder repair wk , Lock washer set , Vaccum Cylinder hose pipe head assy , Door Lock Set , Door Inches Set , LH Door Glass assy , Door Mechanism Set , Km Cable Assy , ACC Cable Assy , Steering Gear Box overhauling kit , Above mentioned damaged door lock mech and cable remove and replace break cylinder assy remove clean all parts to check the faulot , Wind Screen , The above mention unsv parts removed and replace with new spare parts and check to rectified the fault job , Brake Master Cylinder Assy Kit , Door lock sets , The above mention break cylinder assy remove to clean all parts to check the fault and replace the damage parts , Break Master Cylinder assy , Door Lock Sets , Cabin suspenders bush sets , The above mention break cylinder assy remove to clean all parts to check the fault and replace the damage parts rectifying the fault , The above mention unsv parts removed and replace with new spare parts and check to rectified the fault , Clutch top master cylinder assy , Pressure plate , Pressure release bearing , Clutch repair major kit , Cabin lifting hydraulich pump repair kit , The above mention unsv parts removed and replace with new parts and check to rectified the fault
Trusted by 5,000+ companies to find, track, and win government tenders.
Our team will walk you through the platform and help set up your profile — free, no commitment.
Our team will reach out to schedule your free session.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
BANGALORE, KARNATAKA
Indian Army
BANGALORE, KARNATAKA
Indian Army
BANGALORE, KARNATAKA
Indian Army
BANGALORE, KARNATAKA
Indian Army
BANGALORE, KARNATAKA
Tender Results
Loading results...
Clutch assy
AS PER RFP
Pressure Plate Set
AS PER RFP
Pressure release bearing set
AS PER RFP
Clutch master cylinder assy
AS PER RFP
Clutch repair master kit
AS PER RFP
Vaccum Cylinder hose head assy
AS PER RFP
Clutch pedal bearing set
AS PER RFP
Clutch top rod assy
AS PER RFP
Synchronizer cone
AS PER RFP
Sychronizer ring
AS PER RFP
Shift Slivering
AS PER RFP
Shifter assy
AS PER RFP
Reverse gear bearing
AS PER RFP
Extra gear bearing
AS PER RFP
Connection Shifter Rail
AS PER RFP
Main Shaft oil seal
AS PER RFP
Gear Box packing kit
AS PER RFP
Gear Box fit assy
AS PER RFP
Gear sleeves assy
AS PER RFP
The above mentioned gear box remove the gear box assy send to the lathwork rectify the fault replaced the all damaged parts and re-assembled the gear box.
AS PER RFP
The above mentioned clutch and gear box check to re-fit the veh Test the veh on rd trail run test done
AS PER RFP
Ignition Switch
AS PER RFP
Starting coil relay with base assy
AS PER RFP
Fuel solenoid switch
AS PER RFP
30A fuse base assy set
AS PER RFP
5mm Wire
AS PER RFP
Main Realy
AS PER RFP
Holding Realy
AS PER RFP
Fly Wheel Sensor
AS PER RFP
The above Break down veh mentioned unserviceable part remove and replace with new parts rectified the fault check and trail run on rd test done
AS PER RFP
Break master cylinder repair wk
AS PER RFP
Lock washer set
AS PER RFP
Vaccum Cylinder hose pipe head assy
AS PER RFP
Door Lock Set
AS PER RFP
Door Inches Set
AS PER RFP
LH Door Glass assy
AS PER RFP
Door Mechanism Set
AS PER RFP
Km Cable Assy
AS PER RFP
ACC Cable Assy
AS PER RFP
Steering Gear Box overhauling kit
AS PER RFP
Above mentioned damaged door lock mech and cable remove and replace break cylinder assy remove clean all parts to check the faulot
AS PER RFP
Wind Screen
AS PER RFP
Door Lock Set
AS PER RFP
The above mention unsv parts removed and replace with new spare parts and check to rectified the fault job
AS PER RFP
Brake Master Cylinder Assy Kit
AS PER RFP
Door lock sets
AS PER RFP
Door Inches Set
AS PER RFP
Km Cable Assy
AS PER RFP
The above mention break cylinder assy remove to clean all parts to check the fault and replace the damage parts
AS PER RFP
Break Master Cylinder assy
AS PER RFP
Door Lock Sets
AS PER RFP
Km Cable Assy
AS PER RFP
Cabin suspenders bush sets
AS PER RFP
The above mention break cylinder assy remove to clean all parts to check the fault and replace the damage parts rectifying the fault
AS PER RFP
Fly Wheel Sensor
AS PER RFP
The above mention unsv parts removed and replace with new spare parts and check to rectified the fault
AS PER RFP
Clutch top master cylinder assy
AS PER RFP
Clutch assy
AS PER RFP
Pressure plate
AS PER RFP
Pressure release bearing
AS PER RFP
Clutch repair major kit
AS PER RFP
Cabin lifting hydraulich pump repair kit
AS PER RFP
The above mention unsv parts removed and replace with new parts and check to rectified the fault
AS PER RFP
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Clutch assy | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 2 | Pressure Plate Set | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 3 | Pressure release bearing set | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 4 | Clutch master cylinder assy | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 5 | Clutch repair master kit | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 6 | Vaccum Cylinder hose head assy | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 7 | Clutch pedal bearing set | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 8 | Clutch top rod assy | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 9 | Synchronizer cone | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 10 | Sychronizer ring | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 11 | Shift Slivering | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 12 | Shifter assy | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 13 | Reverse gear bearing | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 14 | Extra gear bearing | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 15 | Connection Shifter Rail | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 16 | Main Shaft oil seal | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 17 | Gear Box packing kit | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 18 | Gear Box fit assy | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 19 | Gear sleeves assy | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 20 | The above mentioned gear box remove the gear box assy send to the lathwork rectify the fault replaced the all damaged parts and re-assembled the gear box. | AS PER RFP | 1 | job | oicrepair | 45 | |
| 21 | The above mentioned clutch and gear box check to re-fit the veh Test the veh on rd trail run test done | AS PER RFP | 1 | jon | oicrepair | 45 | |
| 22 | Ignition Switch | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 23 | Starting coil relay with base assy | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 24 | Fuel solenoid switch | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 25 | 30A fuse base assy set | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 26 | 5mm Wire | AS PER RFP | 10 | mtr | oicrepair | 45 | |
| 27 | Main Realy | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 28 | Holding Realy | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 29 | Fly Wheel Sensor | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 30 | The above Break down veh mentioned unserviceable part remove and replace with new parts rectified the fault check and trail run on rd test done | AS PER RFP | 1 | job | oicrepair | 45 | |
| 31 | Break master cylinder repair wk | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 32 | Lock washer set | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 33 | Vaccum Cylinder hose pipe head assy | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 34 | Door Lock Set | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 35 | Door Inches Set | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 36 | LH Door Glass assy | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 37 | Door Mechanism Set | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 38 | Km Cable Assy | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 39 | ACC Cable Assy | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 40 | Steering Gear Box overhauling kit | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 41 | Above mentioned damaged door lock mech and cable remove and replace break cylinder assy remove clean all parts to check the faulot | AS PER RFP | 1 | job | oicrepair | 45 | |
| 42 | Wind Screen | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 43 | Door Lock Set | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 44 | The above mention unsv parts removed and replace with new spare parts and check to rectified the fault job | AS PER RFP | 1 | job | oicrepair | 45 | |
| 45 | Brake Master Cylinder Assy Kit | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 46 | Door lock sets | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 47 | Door Inches Set | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 48 | Km Cable Assy | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 49 | The above mention break cylinder assy remove to clean all parts to check the fault and replace the damage parts | AS PER RFP | 1 | job | oicrepair | 45 | |
| 50 | Break Master Cylinder assy | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 51 | Door Lock Sets | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 52 | Km Cable Assy | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 53 | Cabin suspenders bush sets | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 54 | The above mention break cylinder assy remove to clean all parts to check the fault and replace the damage parts rectifying the fault | AS PER RFP | 1 | job | oicrepair | 45 | |
| 55 | Fly Wheel Sensor | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 56 | The above mention unsv parts removed and replace with new spare parts and check to rectified the fault | AS PER RFP | 1 | job | oicrepair | 45 | |
| 57 | Clutch top master cylinder assy | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 58 | Clutch assy | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 59 | Pressure plate | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 60 | Pressure release bearing | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 61 | Clutch repair major kit | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 62 | Cabin lifting hydraulich pump repair kit | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 63 | The above mention unsv parts removed and replace with new parts and check to rectified the fault | AS PER RFP | 1 | job | oicrepair | 45 |
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar SITC of automotive/clutch/gearbox parts
Financial statements (as required by bid document)
EMD submission proof (if specified in full tender docs)
Technical bid documents and compliance certificates
OEM authorizations (if OEM parts are required)
Any certificates uploaded to meet ATC/Corrigendum requirements
Start
13-Nov-2025, 8:00 pm
End
14-Nov-2025, 8:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | LIFE ENGINEERING CONSORTIUM Under PMA | - | 30-10-2025 19:39:01 | |
| 2 | LIFEWAY ENGINEERING CORP PRIVATE LIMITED Under PMA | - | 31-10-2025 08:09:50 | |
| 3 | MANAS INFRA PROJECTS Under PMA | - | 29-10-2025 17:01:24 |
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | MANAS INFRA PROJECTS(MSE) Under PMA Winner | ₹2,90,561 | Item Categories : Clutch assy,Pressure Plate Set,Pressure release bearing set,Clutch master cylinder assy,Clutch repa |
| L2 | LIFE ENGINEERING CONSORTIUM (MSE) Under PMA | ₹3,10,863 | Item Categories : Clutch assy,Pressure Plate Set,Pressure release bearing set,Clutch master cylinder assy,Clutch repa |
| L3 | LIFEWAY ENGINEERING CORP PRIVATE LIMITED (MSE) Under PMA | ₹3,19,863 | Item Categories : Clutch assy,Pressure Plate Set,Pressure release bearing set,Clutch master cylinder assy,Clutch repa |
🎉 L1 Winner
MANAS INFRA PROJECTS(MSE) Under PMA
Final Price: ₹2,90,561
Key insights about KARNATAKA tender market
Bidders should first satisfy the local address requirement within 50 KM of ASC Centre (North), then prepare SITC offerings for 63 items, including clutch and gear box components, with testing and commissioning. Ensure upload of all mandatory certificates, OEM authorizations, and financials as per ATC; follow the option clause for quantity variations up to 25%.
Submit GST certificate, PAN, experience certificates for similar SITC projects, financial statements, technical bid documents, OEM authorizations if applicable, and EMD proof (if specified in full tender). All certificates must align with bid document and ATC requirements to avoid rejection.
Delivery is linked to the original delivery date with an option to extend for increased quantities. The extended time uses a formula: (Increased quantity / Original quantity) × Original delivery period, minimum 30 days. Local supplier proximity is preferred to ensure timely supply.
Scope includes Supply, Installation, Testing and Commissioning of 63 items, followed by on-road trial, fault rectification, reassembly and final verification. The vendor must provide complete SITC services within the contractual delivery framework.
Upload all certificates sought in the Bid Document and ATC; while explicit standards are not listed, compliance with standard procurement documentation and OEM authorizations is essential. Ensure ISI/ISO or equivalent certifications if specified in the full tender package.
The data does not specify exact payment terms; bidders should expect milestones tied to inspection, acceptance after SITC, and commissioning, with potential intermediate payments per contract. Prepare cashflow estimates accordingly and confirm terms in the final agreement.
Eligibility requires a local registered address within 50 KM radius of ASC Centre (North) to facilitate timely supply and service support. This ensures faster part delivery and on-site support during and after SITC.
The purchaser reserves the right to increase or decrease quantity up to 25% of the bid quantity at the time of contract placement and during the currency of the contract, with delivery extensions calculated per the stated formula and a minimum 30-day period.
Indian Army
📍 BANGALORE, KARNATAKA
Indian Army
📍 SAGAR, MADHYA PRADESH
Indian Army
Indian Army
📍 BANGALORE, KARNATAKA
Indian Army
📍 BHOPAL, MADHYA PRADESH
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS