TenderDekho Logo
Closed GEM

Tender Notice for BB 134 BRACES SWAY EWBB Drawing No MEXE 7354 3 B Specification No RE PROV 4725 a,BB 28 POST FOOTWAL in WEST DELHI, DELHI

Bid Publish Date

07-May-2025, 1:54 pm

Bid End Date

28-May-2025, 2:00 pm

Progress

RA
Issue07-May-2025, 1:54 pm
Reverse Auction04-Jul-2025, 3:00 pm
AwardPending
Explore all 5 tabs to view complete tender details

Quantity

7640

Category

BB 134 BRACES SWAY EWBB Drawing No MEXE 7354 3 B Specification No RE PROV 4725 a

Bid Type

Two Packet Bid

Categories 45

A tender has been published for Indian Army BB 134 BRACES SWAY EWBB Drawing No MEXE 7354 3 B Specification No RE PROV 4725 a, BB 28 POST FOOTWAL in WEST DELHI, DELHI. Quantity: 7640 by. Submission Deadline: 28-05-2025 14: 00: 00. Check eligibility and apply.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-7719673.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 81 Items Sign in for GEM prices

#1

BB 134 BRACES SWAY EWBB Drawing No MEXE 7354 3 B Specification No RE PROV 4725 a

BB 134 BRACES SWAY EWBB Drawing No MEXE 7354 3 B Specification No RE PROV 4725 a

265 nos Delivery: 210 days
#2

BB 28 POST FOOTWALKS Drawing No EBE 5104 5 D Specification No IND ENG PROV 0632 a

BB 28 POST FOOTWALKS Drawing No EBE 5104 5 D Specification No IND ENG PROV 0632 a

73 nos Delivery: 210 days
#3

BB 34 SPANNER CRANKED 3 4 Inch BSW Drawing No EBE 5110 5 D Specification No RE PROV 4041 C

BB 34 SPANNER CRANKED 3 4 Inch BSW Drawing No EBE 5110 5 D Specification No RE PROV 4041 C

59 nos Delivery: 210 days
#4

BB 33 SPANNERS PODGERS Ended 3 by 4 Inch BSW Drawing No EBE 5110 5 D Specification No RE PROV 4041 C

BB 33 SPANNERS PODGERS Ended 3 by 4 Inch BSW Drawing No EBE 5110 5 D Specification No RE PROV 4041 C

57 nos Delivery: 210 days
#5

BB 82 JACKS 15 TON FABRICATED Drawing No IMGA 0057 B and connected drawings Specification No IND ENG PROV 0627 d

BB 82 JACKS 15 TON FABRICATED Drawing No IMGA 0057 B and connected drawings Specification No IND ENG PROV 0627 d

34 nos Delivery: 210 days
#6

BB 150 CHORD REINFORCEMENT EWBB Drawing No ESK 2236 F Specification No IND ENG PROV 0693 d

BB 150 CHORD REINFORCEMENT EWBB Drawing No ESK 2236 F Specification No IND ENG PROV 0693 d

29 nos Delivery: 210 days
#7

LV6 MT 1 30166 ANCHOR EARTH HOLD FAST NO 1 MK II Drawing No LV6 MT 1 4030 000001

LV6 MT 1 30166 ANCHOR EARTH HOLD FAST NO 1 MK II Drawing No LV6 MT 1 4030 000001

28 nos Delivery: 210 days
#8

BB 63 POSTS END MALE MK 2 Drawing No EBE 5362 1 D and EBE 5363 3 E Specification No IND ENG PROV 1250 b

BB 63 POSTS END MALE MK 2 Drawing No EBE 5362 1 D and EBE 5363 3 E Specification No IND ENG PROV 1250 b

27 nos Delivery: 210 days
#9

BB 3 RACKERS Drawing No EBE 5022 E EPD 3920 J Specification No IND ENG PROV 0623 a

BB 3 RACKERS Drawing No EBE 5022 E EPD 3920 J Specification No IND ENG PROV 0623 a

23 nos Delivery: 210 days
#10

BB 19 BEARINGS Drawing No EBE 5029 3 B Specification No RE PROV 4044 b

BB 19 BEARINGS Drawing No EBE 5029 3 B Specification No RE PROV 4044 b

14 nos Delivery: 210 days
#11

BB 22 ROLLERS LAUNCHING PLAIN Drawing No EBE 5098 A

BB 22 ROLLERS LAUNCHING PLAIN Drawing No EBE 5098 A

14 nos Delivery: 210 days
#12

BB 18 SHOES JACK Drawing No EBE 5030 5 D Specification No RE PROV 4044 b

BB 18 SHOES JACK Drawing No EBE 5030 5 D Specification No RE PROV 4044 b

13 nos Delivery: 210 days
#13

BB 65 LINKS LAUNCHING MK 2 Drawing No EBE 5459 2 D Specification No IND ENG PROV 0623 a

BB 65 LINKS LAUNCHING MK 2 Drawing No EBE 5459 2 D Specification No IND ENG PROV 0623 a

10 nos Delivery: 210 days
#14

BB 23 PEDESTAL RAMP NO 1 Drawing No EBE 5020 5 D and EBE 5021 4 D Specification No RE PROV 4044 b

BB 23 PEDESTAL RAMP NO 1 Drawing No EBE 5020 5 D and EBE 5021 4 D Specification No RE PROV 4044 b

5 nos Delivery: 210 days
#15

BB 61 BB WEDGES Drawing No IM 0018 D Specification No IND ENG PROV 0081 j

BB 61 BB WEDGES Drawing No IM 0018 D Specification No IND ENG PROV 0081 j

2 nos Delivery: 210 days
#16

BB 144 CHESSES WOODEN EWBB Drawing No IM 0607 Specification No IND ENG PROV 1191

BB 144 CHESSES WOODEN EWBB Drawing No IM 0607 Specification No IND ENG PROV 1191

470 nos Delivery: 210 days
#17

BB 95 TIMBER GRILLAGE 9 Inch X 3 Inch X 8 feet point 6 Inch 2568X228 point 5X76 Drawing No CIEME M 6127 E Specification No IND ENG PROV 0102 e

BB 95 TIMBER GRILLAGE 9 Inch X 3 Inch X 8 feet point 6 Inch 2568X228 point 5X76 Drawing No CIEME M 6127 E Specification No IND ENG PROV 0102 e

150 nos Delivery: 210 days
#18

BB 10 BOLTS RIBAND Drawing No EBE 5106 12 L Specification No IND CQAE PROV 1314

BB 10 BOLTS RIBAND Drawing No EBE 5106 12 L Specification No IND CQAE PROV 1314

780 nos Delivery: 210 days
#19

BB 48 TIMBER PACKING 9 Inch X 3 Inch X 6 feet Specification No IND ENG PROV 0102 e

BB 48 TIMBER PACKING 9 Inch X 3 Inch X 6 feet Specification No IND ENG PROV 0102 e

411 nos Delivery: 210 days
#20

BB 143 CLAMP TRANSOM EWBB Drawing No IM 0379 A Specification No IND ENG PROV 0623 a

BB 143 CLAMP TRANSOM EWBB Drawing No IM 0379 A Specification No IND ENG PROV 0623 a

90 nos Delivery: 210 days
#21

BB 151 CHORD BOLT COLLAR Drawing No ESK 2236 F Specification No RE PROV 4782

BB 151 CHORD BOLT COLLAR Drawing No ESK 2236 F Specification No RE PROV 4782

166 nos Delivery: 210 days
#22

BB 35 BARS CARRYING Drawing No EBE 5115 2 C Specification No IND ENG PROV 0268 d

BB 35 BARS CARRYING Drawing No EBE 5115 2 C Specification No IND ENG PROV 0268 d

139 nos Delivery: 210 days
#23

BB 14 A DETAILS OF STEEL CHESSES STANDARD DOUBLE Drawing No ISK 0999 D Specification No CQAE 5420 1526 e

BB 14 A DETAILS OF STEEL CHESSES STANDARD DOUBLE Drawing No ISK 0999 D Specification No CQAE 5420 1526 e

105 nos Delivery: 210 days
#24

NK14 7004 CLIPS HINGED Drawing No IM 0041 E Specification No CQAE 5420 1405 d

NK14 7004 CLIPS HINGED Drawing No IM 0041 E Specification No CQAE 5420 1405 d

96 nos Delivery: 210 days
#25

BB 03 RAKERS Drawing No EBE 5022 E or EPD 3920 J Specification No IND ENG PROV 0623 a

BB 03 RAKERS Drawing No EBE 5022 E or EPD 3920 J Specification No IND ENG PROV 0623 a

69 nos Delivery: 210 days
#26

BB 49 TIMBER PACKING 9 Inch X 1 Inch X 6 feet Specification No IND ENG PROV 0102 e

BB 49 TIMBER PACKING 9 Inch X 1 Inch X 6 feet Specification No IND ENG PROV 0102 e

20 nos Delivery: 210 days
#27

BB 29 TIE PLATES Drawing No EBE 5022 E Specification No IND ENG PROV 0623 a

BB 29 TIE PLATES Drawing No EBE 5022 E Specification No IND ENG PROV 0623 a

67 nos Delivery: 210 days
#28

BB 31 BASE PLATES Drawing No EBE 5028 D Specification No RE PROV 4044 b

BB 31 BASE PLATES Drawing No EBE 5028 D Specification No RE PROV 4044 b

50 nos Delivery: 210 days
#29

BB 97 TIMBER GRILLAGE 9 Inch X 3 Inch X 3 feet 6 Inch Drawing No CIEME M 6127 E Specification No IND ENG PROV 0102 e

BB 97 TIMBER GRILLAGE 9 Inch X 3 Inch X 3 feet 6 Inch Drawing No CIEME M 6127 E Specification No IND ENG PROV 0102 e

65 nos Delivery: 210 days
#30

BB 98 TIMBER GRILLAGE 9 Inch X 4 Inch 7 FT TO 15 FT Drawing No CIEME M 6127 E Specification No IND ENG PROV 0102 e

BB 98 TIMBER GRILLAGE 9 Inch X 4 Inch 7 FT TO 15 FT Drawing No CIEME M 6127 E Specification No IND ENG PROV 0102 e

53 nos Delivery: 210 days
#31

BB 127 BLOCK TIMBER DISTANCE GRILLAGE Drawing No MEXE 7062 E Specification No IND ENG PROV 0102 e

BB 127 BLOCK TIMBER DISTANCE GRILLAGE Drawing No MEXE 7062 E Specification No IND ENG PROV 0102 e

41 nos Delivery: 210 days
#32

BB 58 22 ROLLERS PLAIN MK 2 Drawing No EBE 5318 F Specification No RE PROV 4041 c

BB 58 22 ROLLERS PLAIN MK 2 Drawing No EBE 5318 F Specification No RE PROV 4041 c

34 nos Delivery: 210 days
#33

BB 133 TRANSOM EWBB Drawing No MEXE 7352 1 F MEXE 7353 B or IM 0312 B Specification No IND ENG 0082

BB 133 TRANSOM EWBB Drawing No MEXE 7352 1 F MEXE 7353 B or IM 0312 B Specification No IND ENG 0082

35 nos Delivery: 210 days
#34

BB 15 Oblique 6 PIN SWAY BRACES Drawing No EBE 5099 12 Specification No RE PROV 4041 C

BB 15 Oblique 6 PIN SWAY BRACES Drawing No EBE 5099 12 Specification No RE PROV 4041 C

28 nos Delivery: 210 days
#35

BB 60 TEMPLATES ROLLER ROCKING Drawing No EBE 5323 6 Specification No IND ENG PROV 0268 d

BB 60 TEMPLATES ROLLER ROCKING Drawing No EBE 5323 6 Specification No IND ENG PROV 0268 d

21 nos Delivery: 210 days
#36

BB 123 BOLTS DISTANCE GRILLAGE 2 feet 1 Inch 3 by 4 Inch DIA X 2 feet 1 Inch Drawing No MEXE 7062 E Specification No IND CQAE PROV 1314

BB 123 BOLTS DISTANCE GRILLAGE 2 feet 1 Inch 3 by 4 Inch DIA X 2 feet 1 Inch Drawing No MEXE 7062 E Specification No IND CQAE PROV 1314

7 nos Delivery: 210 days
#37

BB 121 BEAM GRILLAGE STEEL 10 Inch X 41 by 2 Inch X 12 Inch Drawing No IM 0004 E Specification No RE 4584 C

BB 121 BEAM GRILLAGE STEEL 10 Inch X 41 by 2 Inch X 12 Inch Drawing No IM 0004 E Specification No RE 4584 C

14 nos Delivery: 210 days
#38

BB 99 TIMBER GRILLAGE 9 Inch X 3 Inch X 2 feet 3 Inch Specification No IND ENG PROV 0102 e

BB 99 TIMBER GRILLAGE 9 Inch X 3 Inch X 2 feet 3 Inch Specification No IND ENG PROV 0102 e

9 nos Delivery: 210 days
#39

BB 62 POSTS END FEMALE MK 2 Drawing No EBE 5364 3 D EBE 5365 D Specification No IND ENG PROV 1250 b

BB 62 POSTS END FEMALE MK 2 Drawing No EBE 5364 3 D EBE 5365 D Specification No IND ENG PROV 1250 b

9 nos Delivery: 210 days
#40

BB 154 BEAMS DISTRIBUTING EWBB Drawing No ESK 2230 A Specification No RE PROV 4782

BB 154 BEAMS DISTRIBUTING EWBB Drawing No ESK 2230 A Specification No RE PROV 4782

7 nos Delivery: 210 days
#41

NIV SHACKLE LARGE D SWL 1 point 5 TON

NIV SHACKLE LARGE D SWL 1 point 5 TON

2 nos Delivery: 210 days
#42

BB 24 RAMPS PLAIN Drawing No EBE 5111 10 C or EPD 3921 G Specification No IND ENG PROV 0662 d

BB 24 RAMPS PLAIN Drawing No EBE 5111 10 C or EPD 3921 G Specification No IND ENG PROV 0662 d

1 nos Delivery: 210 days
#43

BB 1248 CLIP SCREWED Drawing No IM 0043 D Specification No CQAE 5420 1405 d

BB 1248 CLIP SCREWED Drawing No IM 0043 D Specification No CQAE 5420 1405 d

170 nos Delivery: 210 days
#44

AA 303 CLIPS GROUND SILL Drawing No IM 0044 G Specification No CQAE 5420 1405 d

AA 303 CLIPS GROUND SILL Drawing No IM 0044 G Specification No CQAE 5420 1405 d

148 nos Delivery: 210 days
#45

EWBB 144B STEEL CHESSES DOUBLE EWBB Drawing No ISK 0998 F Specification No CQAE 5420 1526 d 2001

EWBB 144B STEEL CHESSES DOUBLE EWBB Drawing No ISK 0998 F Specification No CQAE 5420 1526 d 2001

1,154 nos Delivery: 210 days
#46

E3 IEC 5212 CLAMPS DOUBLE THROAT 38 point 1mm Drawing No CIE 478 G

E3 IEC 5212 CLAMPS DOUBLE THROAT 38 point 1mm Drawing No CIE 478 G

80 nos Delivery: 210 days
#47

BB 170 CHAINS LASHING 10 FEET Drawing No MEXE 8130 B

BB 170 CHAINS LASHING 10 FEET Drawing No MEXE 8130 B

50 nos Delivery: 210 days
#48

15 9540 000091 ALUMINIUM ALLOY SPECIAL SHAPED SEC 200X 330MM CONNECTORS Drawing No IMPD 1923 A Specification No IND ENG PROV 1231 e

15 9540 000091 ALUMINIUM ALLOY SPECIAL SHAPED SEC 200X 330MM CONNECTORS Drawing No IMPD 1923 A Specification No IND ENG PROV 1231 e

37 nos Delivery: 210 days
#49

E3 3940 000141 BLOCK TACKLE GS CORDAGE 3 Inch MK II TRF Drawing No IMGA 0081 A

E3 3940 000141 BLOCK TACKLE GS CORDAGE 3 Inch MK II TRF Drawing No IMGA 0081 A

13 nos Delivery: 210 days
#50

BB 9120 CRIP BRIDGING 20 point 32 Ton Drawing No IM 0042 F Specification No CQAE 5420 1405 d

BB 9120 CRIP BRIDGING 20 point 32 Ton Drawing No IM 0042 F Specification No CQAE 5420 1405 d

4 nos Delivery: 210 days
#51

E3 EC 000174 BLOCK TACKLE GS CORDAGE 2 Inch TRIPLE Drawing No CIE SK 134 1

E3 EC 000174 BLOCK TACKLE GS CORDAGE 2 Inch TRIPLE Drawing No CIE SK 134 1

3 nos Delivery: 210 days
#52

E3 EC 5062 BLOCK Tackle GS Wire Rope Drawing No CIE SK 272 B

E3 EC 5062 BLOCK Tackle GS Wire Rope Drawing No CIE SK 272 B

3 nos Delivery: 210 days
#53

BB 4A PIN SAFETY Drawing No EBE 5106 12 L Specification No IND ENG PROV 0573

BB 4A PIN SAFETY Drawing No EBE 5106 12 L Specification No IND ENG PROV 0573

850 nos Delivery: 210 days
#54

BB 8 STRINGER BUTTON Drawing No EBE 5025 13 E or IM 0392 Specification No IND ENG PROV 0662 d

BB 8 STRINGER BUTTON Drawing No EBE 5025 13 E or IM 0392 Specification No IND ENG PROV 0662 d

100 nos Delivery: 210 days
#55

BB 7 STRINGERS PLAIN Drawing No EBE 5025 13 E or IM 0391 A Specification No IND ENG PROV 0662 d

BB 7 STRINGERS PLAIN Drawing No EBE 5025 13 E or IM 0391 A Specification No IND ENG PROV 0662 d

60 nos Delivery: 210 days
#56

BB 14 CHESSES Drawing No IM 0605 A Specification No IND ENG PROV 1183 a

BB 14 CHESSES Drawing No IM 0605 A Specification No IND ENG PROV 1183 a

86 nos Delivery: 210 days
#57

BB 32 SPANNERS PODEGRS 1 1 by 4 Inch Drawing No EBE 5110 5 D Specification No RE PROV 4041 C

BB 32 SPANNERS PODEGRS 1 1 by 4 Inch Drawing No EBE 5110 5 D Specification No RE PROV 4041 C

50 nos Delivery: 210 days
#58

D 7002 CLIPS HINGED Drawing No IM 0041 E Specification No CQAE 5420 1405 d

D 7002 CLIPS HINGED Drawing No IM 0041 E Specification No CQAE 5420 1405 d

29 nos Delivery: 210 days
#59

BSB 41 REEL CABLE Drawing No EBE 5809 1 D Specification No IND ENG PROV 0537 a

BSB 41 REEL CABLE Drawing No EBE 5809 1 D Specification No IND ENG PROV 0537 a

2 nos Delivery: 210 days
#60

BSB 14 BOLTS SPACER CHORD Drawing No EBE 5787 4 C Specification No RE PROV 4304 b

BSB 14 BOLTS SPACER CHORD Drawing No EBE 5787 4 C Specification No RE PROV 4304 b

2 nos Delivery: 210 days
#61

BSB 2 BEARERS SADDLE Drawing No EBE 5783 2 B Specification No RE PROV 4304 b

BSB 2 BEARERS SADDLE Drawing No EBE 5783 2 B Specification No RE PROV 4304 b

1 nos Delivery: 210 days
#62

BSB 45 TREWHELLA GRAB Drawing No IMGA 0069 and connected drawings Specification No IND ENG PROV 1025 a

BSB 45 TREWHELLA GRAB Drawing No IMGA 0069 and connected drawings Specification No IND ENG PROV 1025 a

2 nos Delivery: 210 days
#63

NKK LIFTING HOOK Drawing No ISK 0992 A Specification No CQAE 5420 1526 e 2001

NKK LIFTING HOOK Drawing No ISK 0992 A Specification No CQAE 5420 1526 e 2001

103 nos Delivery: 210 days
#64

BSB 27 CONNECTOR LINK FEMALE Drawing No EBE 5920 C Specification No RE PROV 4305

BSB 27 CONNECTOR LINK FEMALE Drawing No EBE 5920 C Specification No RE PROV 4305

1 nos Delivery: 210 days
#65

14 5420 000262 FRAME BRACING PANEL BR NOSE Drawing No IMSA 0760 and connected drawing Specification No CQAE 5420 1645

14 5420 000262 FRAME BRACING PANEL BR NOSE Drawing No IMSA 0760 and connected drawing Specification No CQAE 5420 1645

4 nos Delivery: 210 days
#66

14 5420 000269 BEARING BRIDGE PIN PLATE Drawing No IMPD 4170 Specification No CQAE 5420 1645

14 5420 000269 BEARING BRIDGE PIN PLATE Drawing No IMPD 4170 Specification No CQAE 5420 1645

2 nos Delivery: 210 days
#67

BB 14A DETAILS OF STEEL CHESSES STANDARD WITH LIFTING HOOK SINGLE Drawing No ISK 0999 D Steel Chesses Standard ISK 0992 A Lifting Hook Specification No CQAE 5420 1526 d 2001

BB 14A DETAILS OF STEEL CHESSES STANDARD WITH LIFTING HOOK SINGLE Drawing No ISK 0999 D Steel Chesses Standard ISK 0992 A Lifting Hook Specification No CQAE 5420 1526 d 2001

432 nos Delivery: 210 days
#68

BSB 77 STRINGER CLAMP Drawing No EBE 5605 4 C Specification No RE PROV 4306

BSB 77 STRINGER CLAMP Drawing No EBE 5605 4 C Specification No RE PROV 4306

51 nos Delivery: 210 days
#69

BB 2 FRAMES BRACING Drawing No EBE 5022 E or EPD 3920 J Specification No IND ENG PROV 1260

BB 2 FRAMES BRACING Drawing No EBE 5022 E or EPD 3920 J Specification No IND ENG PROV 1260

14 nos Delivery: 210 days
#70

BB 15 BRACES SWAY Drawing No EBE 5099 12 Specification No RE PROV 4041 C

BB 15 BRACES SWAY Drawing No EBE 5099 12 Specification No RE PROV 4041 C

24 nos Delivery: 210 days
#71

BSB 50 DRIFT PIN Drawing No EBE 6214 C Specification No RE PROV 4305

BSB 50 DRIFT PIN Drawing No EBE 6214 C Specification No RE PROV 4305

13 nos Delivery: 210 days
#72

BB 78 CRIB BEARING Drawing No EBE 5606 2 A Specification No RE PROV 4738

BB 78 CRIB BEARING Drawing No EBE 5606 2 A Specification No RE PROV 4738

5 nos Delivery: 210 days
#73

BB 5 OR BB 5A TRANSOMS Drawing No EBE 5022 E or EPD 3920 J Specification No IND ENG 0082

BB 5 OR BB 5A TRANSOMS Drawing No EBE 5022 E or EPD 3920 J Specification No IND ENG 0082

92 nos Delivery: 210 days
#74

BB 06 CLAMPS TRANSOMS Drawing No EBE 5024 D Specification No IND ENG PROV 0623 a

BB 06 CLAMPS TRANSOMS Drawing No EBE 5024 D Specification No IND ENG PROV 0623 a

346 nos Delivery: 210 days
#75

BSB 21 TROLLEY ERECTION ASSY and DETAILS Drawing No EBE 5923 3 B EBE 5924 C Specification No RE PROV 4306

BSB 21 TROLLEY ERECTION ASSY and DETAILS Drawing No EBE 5923 3 B EBE 5924 C Specification No RE PROV 4306

17 nos Delivery: 210 days
#76

BB 63 10 PIN Drawing No EBE 5363 3 E EBE 5362 1 D Specification No IND ENG PROV 1250 b

BB 63 10 PIN Drawing No EBE 5363 3 E EBE 5362 1 D Specification No IND ENG PROV 1250 b

10 nos Delivery: 210 days
#77

BB 30 EXTRACTOR, PANEL PIN Drawing No EBE 5027 D Specification No RE PROV 4041 c

BB 30 EXTRACTOR, PANEL PIN Drawing No EBE 5027 D Specification No RE PROV 4041 c

1 nos Delivery: 210 days
#78

BB 75 CLAMPS CHORD Drawing No IM 0412 Specification No RE PROV 4738

BB 75 CLAMPS CHORD Drawing No IM 0412 Specification No RE PROV 4738

1 nos Delivery: 210 days
#79

14 5305 009853 CLAMP SCREW Drawing No IMPD 0550 Specification No CQAE 1940 1575 a

14 5305 009853 CLAMP SCREW Drawing No IMPD 0550 Specification No CQAE 1940 1575 a

56 nos Delivery: 210 days
#80

BB 69 POST SPAN JUNCTION FEMALE Drawing No EBE 5556 E Specification No RE PROV 4043

BB 69 POST SPAN JUNCTION FEMALE Drawing No EBE 5556 E Specification No RE PROV 4043

15 nos Delivery: 210 days
#81

14 5420 000249 BOLT BRACING BRIDGE FRAME M12 X 33 Drawing No IMPD 4172 Specification No CQAE 5420 1645

14 5420 000249 BOLT BRACING BRIDGE FRAME M12 X 33 Drawing No IMPD 4172 Specification No CQAE 5420 1645

17 nos Delivery: 210 days

Required Documents

1

Experience Criteria

2

Past Performance

3

OEM Authorization Certificate

4

Additional Doc 1 (Requested in ATC)

5

Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Reverse Auction Schedule

Completed

Start

04-Jul-2025, 3:00 pm

End

05-Jul-2025, 4:00 pm

Duration: 25 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
**********   Under PMA
-27-05-2025 22:12:58
2
**********   Under PMA
-27-05-2025 16:32:26
3
**********   Under PMA
-27-05-2025 20:16:37
4
**********   Under PMA
-28-05-2025 13:18:20
5
**********   Under PMA
-23-05-2025 17:58:39
6
**********   Under PMA
-15-05-2025 18:49:44
7
**********   Under PMA
-28-05-2025 13:47:50

Frequently Asked Questions

Key insights about DELHI tender market

What are the eligibility requirements for participating in the procurement of BB BSB and EWBB Spares?

The eligibility requirements include being a registered entity relevant to the manufacturing standards, compliance with local content regulations, and proven experience in delivering similar components based on military specifications.

What certificates are required to bid for the Procurement of BB BSB and EWBB Spares?

Bidders must include certificates of compliance with quality standards, registration details, and any previously held relevant contracts. Documentation must align with the required technical specifications outlined in the tender.

What is the registration process for submitting a bid for this GEM/2025/B/6121862 tender?

Interested bidders should complete their registration on the designated government procurement portal. This involves providing company information, relevant documents, and certifications before submitting bids for the specified components.

What formats are accepted for document submission in the procurement process?

Documents must be submitted in PDF or Word formats as specified in the tender instructions. Completeness and clarity in the provided documents are essential for successful evaluation.

Are there benefits for Micro, Small, and Medium Enterprises (MSEs) in this tender?

Yes, MSEs are encouraged to participate and may receive special support through financial benefits or preferential treatment during the evaluation process. This approach is aimed at bolstering local businesses in military procurement opportunities.