Progress
The procurement is issued by the Indian Army under the Department Of Military Affairs for a catalog of automotive spare parts including WIND SHIELD GLASS, FUEL PIPE, TIMING BELT TENSIONER, SUSPENSION SHOCKER RH/LH, BOX ASSY MAIN FUSE, ARM ASSY LEFT, SENSOR WATER TEMP, CLUTCH CABLE, SHOE SET BRAKE, AIR FILTER ASSY, BONET SHOCKER, and SOLENOID SWITCH. The BOQ comprises 13 total items with unspecified quantities; the contract accommodates a potential order variation of up to 25% of the bid quantity during both initial and extended delivery periods. Delivery timing scales with the order and is calculated as: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. A rider in the ATC confirms compliance with the purchaser’s option to adjust quantity. This tender targets military vehicle spares supply for the Indian Army.
Automotive spare parts list: WIND SHIELD GLASS, FUEL PIPE, TIMING BELT TENSIONER, SUSPENSION SHOCKER RH/LH, BOX ASSY MAIN FUSE, ARM ASSY LEFT, SENSOR WATER TEMP, CLUTCH CABLE, SHOE SET BRAKE, AIR FILTER ASSY, BONET SHOCKER, SOLENOID SWITCH
BOQ total: 13 items
Delivery extension rule: (Increased quantity ÷ Original quantity) × Original delivery period; minimum 30 days
Option to extend quantity up to 25% during currency at contracted rates
ATC may specify OEM/brand requirements and technical acceptances
No explicit technical standard numbers provided in data; verify in final ATC
Quantity variation up to 25% under option clause
Delivery period starts after original order, minimum 30 days for additions
ATC contains purchaser-specific terms and potential OEM requirements
Not specified in data; verify in ATC and final tender documents
Delivery period can extend with option clause; minimum 30 days for added quantity
Not specified in data; check ATC for LD/penalty details
Experience in supplying automotive spare parts for defense or large-scale fleets
Financial capability to handle multi-item spares orders
Compliance with OEM authorizations and regulatory requirements as per ATC
Quantity
16
Category
WIND SHIELD GLASS
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Past Performance
30 %
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
WIND SHIELD GLASS , FUEL PIPE , TIMING BELT TENSIONER , SUSPENSION SHOCKER RH , SUSPENSION SHOCKER LH , BOX ASSY MAIN FUSE , ARM ASSY LEFT , SENSOR WATER TEMP , CLUTCH CABLE , SHOE SET BRAKE , AIR FILTER ASSY , BONET SHOCKER , SOLENOID SWITCH
Pre-Bid Date
05-10-2026 11:00:00
Pre-Bid Venue
SADUL CLUB BIKANER
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Bikaner
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Bikaner | Bikaner | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
17-Oct-2026, 6:30 am
Opening Date
18-Oct-2026, 6:30 am
WIND SHIELD GLASS
WIND SHIELD GLASS FOR SCORPIO
FUEL PIPE
FUEL PIPE FOR SCORPIO
TIMING BELT TENSIONER
TIMING BELT TENSIONER FOR SCORPIO
SUSPENSION SHOCKER RH
SUSPENSION SHOCKER RH FOR SCORPIO
SUSPENSION SHOCKER LH
SUSPENSION SHOCKER LH FOR SCORPIO
BOX ASSY MAIN FUSE
BOX ASSY MAIN FUSE FOR SWIFT DZIRE
ARM ASSY LEFT
ARM ASSY LEFT FOR SWIFT DZIRE
SENSOR WATER TEMP
SENSOR WATER TEMP FOR SWIFT DZIRE
CLUTCH CABLE
CLUTCH CABLE FOR SWIFT DZIRE
SHOE SET BRAKE
SHOE SET BRAKE FOR SWIFT DZIRE
AIR FILTER ASSY
AIR FILTER ASSY FOR STLN VEH
BONET SHOCKER
BONET SHOCKER FOR SAFARI
SOLENOID SWITCH
SOLENOID SWITCH FOR TATA
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | WIND SHIELD GLASS | WIND SHIELD GLASS FOR SCORPIO | 1 | nos | [email protected] | 15 | |
| 2 | FUEL PIPE | FUEL PIPE FOR SCORPIO | 1 | nos | [email protected] | 15 | |
| 3 | TIMING BELT TENSIONER | TIMING BELT TENSIONER FOR SCORPIO | 1 | nos | [email protected] | 15 | |
| 4 | SUSPENSION SHOCKER RH | SUSPENSION SHOCKER RH FOR SCORPIO | 1 | nos | [email protected] | 15 | |
| 5 | SUSPENSION SHOCKER LH | SUSPENSION SHOCKER LH FOR SCORPIO | 1 | nos | [email protected] | 15 | |
| 6 | BOX ASSY MAIN FUSE | BOX ASSY MAIN FUSE FOR SWIFT DZIRE | 2 | nos | [email protected] | 15 | |
| 7 | ARM ASSY LEFT | ARM ASSY LEFT FOR SWIFT DZIRE | 1 | nos | [email protected] | 15 | |
| 8 | SENSOR WATER TEMP | SENSOR WATER TEMP FOR SWIFT DZIRE | 1 | nos | [email protected] | 15 | |
| 9 | CLUTCH CABLE | CLUTCH CABLE FOR SWIFT DZIRE | 1 | nos | [email protected] | 15 | |
| 10 | SHOE SET BRAKE | SHOE SET BRAKE FOR SWIFT DZIRE | 1 | nos | [email protected] | 15 | |
| 11 | AIR FILTER ASSY | AIR FILTER ASSY FOR STLN VEH | 2 | nos | [email protected] | 15 | |
| 12 | BONET SHOCKER | BONET SHOCKER FOR SAFARI | 2 | nos | [email protected] | 15 | |
| 13 | SOLENOID SWITCH | SOLENOID SWITCH FOR TATA | 1 | nos | [email protected] | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar defense spare parts supply
Financial statements demonstrating capability to sustain orders
EMD/Security deposit document as per ATC
Technical bid documents aligned with ATC requirements
OEM authorizations or dealer credentials (if specified in ATC)
Key insights about RAJASTHAN tender market
Bidders must submit GST, PAN, experience certificates, financial statements, and EMD as per ATC. Ensure OEM authorizations if required and align technical bids with the 13-item BOQ. The option clause allows ±25% quantity variation, with minimum delivery extension rules guiding schedule.
Required documents include GST certificate, PAN, experience certificates for similar supply, financial statements, EMD/Security deposit, technical bid documents, and OEM authorizations. Prepare in advance to satisfy ATC-uploaded terms and ensure compliance with defense procurement norms.
Delivery must begin after the original order. Added quantity triggers a minimum 30-day delivery period, with potential extension via the option clause. Ensure scheduling aligns with the 25% quantity variation allowance across contract duration.
The BOQ includes WIND SHIELD GLASS, FUEL PIPE, TIMING BELT TENSIONER, SUSPENSION SHOCKER RH/LH, BOX ASSY MAIN FUSE, ARM ASSY LEFT, SENSOR WATER TEMP, CLUTCH CABLE, SHOE SET BRAKE, AIR FILTER ASSY, BONET SHOCKER, and SOLENOID SWITCH, among others listed in the tender data.
The Purchaser may adjust quantity by up to 25% at contract placement and during currency. Delivery timing for added quantity is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
Eligibility includes demonstrated experience in defense or large-scale automotive spares, financial stability, GST registration, PAN, and OEM authorizations if required by ATC. Compliance with purchaser ATC terms is mandatory for bid submission.
Payment terms are specified in the final ATC; the data provided does not include explicit terms. Bidders should await ATC details for payment milestones, scheduling, and any advance, milestone, or warranty-linked payments.
The ATC is uploaded by the purchaser and available to registered bidders. Access the ATC document to confirm technical specifications, OEM requirements, delivery, and penalty provisions before submission.