GEM

BEML Potentiometer Tender 2K/10K 10-Turn Bourns Pot Original with Dial Defence Production 2025

Bid Publish Date

27-Dec-2025, 9:22 am

Bid End Date

14-Jan-2026, 9:00 pm

Latest Corrigendum Available

Progress

Issue27-Dec-2025, 9:22 am
Corrigendum10-Jan-2026
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

31

Category

2K 10 Turn bourns pot Original with dial

Bid Type

Two Packet Bid

Tender Overview

Bharat Earth Movers Limited (BEML) invites quotations for 2K 10 Turn Bourns potentiometer original with dial and 10K 10 Turn Bourns potentiometer original with dial under the Defence Production umbrella. The tender emphasizes quantity flexibility via an option clause, enabling up to a 50% increase or decrease in bid quantity and adjusted delivery timelines. Location details are not specified in the tender data. The procurement targets precise, OEM-grade potentiometers, emphasizing authenticity and compatibility with high-precision electronic assemblies. The inclusion of GST invoice requirements via the GeM portal signals strict compliance with tax documentation. A unique differentiator is the explicit option-clause on delivery and pricing, requiring bidders to plan for scalable orders. This procurement bears potential for suppliers specializing in Bourns 10-turn pots and related dial-access devices.

Technical Specifications & Requirements

  • Product names: 2K 10 Turn Bourns potentiometer original with dial, 10K 10 Turn Bourns potentiometer original with dial
  • Quantity/Scope: Not specified; subject to option clause (up to 50% variation)
  • Delivery terms: Based on last delivery date of original order; extended delivery time formula: (additional quantity ÷ original quantity) × original delivery period, minimum 30 days
  • Standards/Compliance: No explicit standards listed in data; bidders should ensure OEM authentication and compatibility with Bourns 10-turn pot specifications
  • Documentation: GST invoice upload and GST portal payment confirmation required for invoicing via GeM
  • Estimated value/EMD: Not disclosed; no BOQ items available
  • OEM/Brand: Bourns original components required; ensure authentic brand reproduction
  • Warranty/Support: Not specified in tender data; bidders should prepare warranty/AMC plans if requested

Terms, Conditions & Eligibility

  • Option Clause: Purchaser may increase/decrease quantity up to 50% of bid quantity; extension applies during currency with a minimum time floor of 30 days
  • Delivery Clock: Delivery period calculated from last date of original delivery order; extended period follows the same rule
  • GST Compliance: Invoicing via GeM requires scanned GST invoice and GST portal payment confirmation screenshot
  • Documentation Requirements: GST certificate, PAN, experience certificates, financial statements, EMD, OEM authorizations, and technical bid documents per terms
  • Payment Terms: Not explicitly defined; bidders should anticipate standard GeM payment processing timelines
  • Penalty/Performance: No explicit LD terms in data; bidders should verify if penalties apply on late delivery
  • Eligibility: Manufacturer/authorized distributor for Bourns potentiometers with proven supply capability

Key Specifications

  • Product/service names: 2K 10 Turn Bourns potentiometer original with dial, 10K 10 Turn Bourns potentiometer original with dial

  • Quantity/scope: not stated; governed by option clause (up to 50% variance)

  • Delivery terms: calculated from last date of original delivery order; extended delivery time = (additional quantity ÷ original quantity) × original delivery period; minimum 30 days

  • Brand/OEM: Bourns original components; verify authentication

  • Invoicing/Tax: GST invoice via GeM portal with payment confirmation screenshot

  • Standards/quality: no explicit IS/ISO standard listed; ensure OEM compatibility and electrical specs align with Bourns 10-turn pots

Terms & Conditions

  • Option Clause allows ±50% quantity change at contract placement and during currency

  • Delivery period rules tie to last original delivery date with minimum 30 days extension

  • GST invoice upload and GeM GST portal payment screenshot are mandatory

Important Clauses

Payment Terms

GST-compliant invoicing via GeM; upload GST invoice scan and GST portal payment confirmation

Delivery Schedule

Delivery starts from last date of original delivery order; extended period calculated as (additional ÷ original) × original, minimum 30 days

Penalties/Liquidated Damages

No explicit LD conditions stated; bidders should confirm penalties and recovery terms with purchaser

Bidder Eligibility

  • Authorized distributor/manufacturer for Bourns potentiometers

  • Demonstrated capability to supply OEM original 2K and 10K 10-turn pots

  • GST registration and compliant invoicing ability for GeM

Past Similar Tenders (Historical Results)

2 found

Provn of Fd Water Supply Scheme 5 KL with RO FOR MANIGONG,Provn of 5 KVA Generator Set,Synthetic en

Indian Army

DHEMAJI, ASSAM

Posted: 13 June 2025
Closed: 5 July 2025
GEM

K6 7340-000038 SPOON SERVING MK-2,K6 7350-000194 MUG SS WITH DOUBLE WALL MOULDED HANDLE,K6 KND NIV

Indian Army

JODHPUR, RAJASTHAN

Posted: 24 May 2025
Closed: 14 June 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST Certificate

2

PAN Card

3

Experience Certificates (relevant to potentiometer supply)

4

Financial Statements (audit-ready)

5

EMD/Security Deposit documentation

6

Technical Compliance Certificates

7

OEM Authorization/Authorization Letter from Bourns

8

GST GSTIN verification (GeM portal requirements)

9

Any additional documents specified in T&Cs (if provided)

Corrigendum Updates

2 Updates
#1

Update

10-Jan-2026

Extended Deadline

14-Jan-2026, 9:00 pm

Opening Date

14-Jan-2026, 9:30 pm

#2

Update

06-Jan-2026

Extended Deadline

10-Jan-2026, 9:00 pm

Opening Date

10-Jan-2026, 9:30 pm

Frequently Asked Questions

Key insights about KARNATAKA tender market

How to bid for BEML potentiometer tender in Defence Production 2025

Bidders must meet eligibility criteria for BEML potentiometer supply, including OEM authorization, GST compliance, and GeM-based invoicing. Ensure you can supply 2K and 10K 10-turn Bourns pots with dial, and prepare documents: GST, PAN, financials, and experience certificates. The tender allows up to 50% quantity variation.

What documents are required for BEML Bourns pot tender submission 2025

Prepare GST certificate, PAN card, experience certificates, financial statements, EMD/surety, OEM authorization from Bourns, and technical bid documents. GeM-uploaded GST invoice and GST payment confirmation screenshots are mandatory for invoicing.

What are the delivery terms for BEML potentiometer procurement 2025

Delivery starts from the last date of the original delivery order. If quantity increases, the extended time = (additional quantity ÷ original quantity) × original delivery period, with a minimum extension of 30 days. Ensure readiness for OEM 2K and 10K pots.

What is the EMD requirement for the Bourns potentiometer tender in India

The tender data does not state a specific EMD amount. Bidders should confirm EMD requirements during GeM portal submission or consult BEML’s tender clarifications, ensuring funds are ready for the security deposit per official terms.

What standards or certifications are required for the Bourns pots tender 2025

The tender specifies OEM original parts. While explicit IS/ISO standards are not listed, ensure Bourns original components and proper sector certification via OEM authorization. Verify compatibility with high-precision electronic assemblies and maintain traceability of the components.

How to handle GST invoicing for BEML GeM tender 2025

Submit a scanned GST invoice through GeM and provide the screenshot confirming GST payment. Invoices must reflect the supplier’s GSTIN, product description (2K/10K Bourns pots), unit rates, and total amount as per contracted quantity.

What is the scope of quantity variation in the BEML tender 2025

The purchaser may adjust quantity up to 50% of the bid quantity at contract placement and during the contract currency. The extra quantity follows the same contracted rates and delivery terms, with the delivery time calculated per the extended period formula.