TenderDekho Logo
Active GEM

Indian Army Tender: CONTROL VALVE, KNORR AE 5120, COOLING FAN, OIL FILTER & RELATED KITs Procurement 2026

Bid Publish Date

09-Oct-2026, 9:47 am

Bid End Date

19-Oct-2026, 10:00 am

Progress

Issue09-Oct-2026, 9:47 am
AwardPending

Key Highlights

  • • Distinct option clause allowing ±25% quantity variation at contract rates
  • • OEM turnover criteria required for bidders and primary product OEM in multi-item bids
  • • Delivery period calculation includes a minimum 30-day extension when options are exercised
  • • GST applicability to be self-verified by bidders; no guaranteed reimbursement specified

Tender Overview

Indian Army invites bids for a multi-item category including CONTROL VALVE, VALVE KNORR AE 5120, COOLING FAN, OIL FILTER, DRUM ASSY, UJ KIT, BREAK ACTUATOR REAR, SPRING BRAKE ACTUATOR FRONT, and GEAR LEVER KIT. The BOQ lists 9 total items, with no specified quantities in the extract. The procurement location is not disclosed in the extract, implying nationwide or unspecified deployment. The buyer reserves quantity variation up to 25% during contract placement and during the currency of the contract, at the contracted rates. Distinctive terms include an option clause tied to delivery timelines, and a turnover-based eligibility framework for bidders and OEMs.

  • Organization: Indian Army (Department Of Military Affairs)
  • Product scope: Mechanical and hydraulic components for vehicle systems
  • Estimated value / EMD: Not disclosed in the provided data
  • Delivery window: Not specified; option-based delivery extension calculations described
  • Key differentiator: Option clause enabling up to 25% quantity change at contract rates

Technical Specifications & Requirements

  • No explicit technical specifications provided in the extract. Any bidder must rely on BOQ items including control valves, valves (Knorr AE 5120), cooling fans, oil filters, drum assemblies, UJ kits, brake actuators (rear), spring brake actuators (front), and gear lever kits.
  • Tender requires adherence to standard commercial terms: 25% quantity variation, OEM turnover criteria, and bidder financial health verification.
  • Delivery-period calculations are tied to original delivery period with a minimum 30-day extension rule when options are exercised.
  • Turnover criteria reference last three financial years but exact numeric thresholds are not included in the extract.
  • GST considerations are noted but exact treatment is not defined here; bidders should verify GST applicability with their quotes.

Terms, Conditions & Eligibility

  • EMD / security deposits: Explicit amounts are not provided; bidders must refer to bid document for exact EMD requirements.
  • Turnover criteria: Minimum average annual turnover for bidder and OEM over the last three years is required, per bid document; specifics to be uploaded as audited statements or CA certificates.
  • Delivery terms: Delivery period starts from the last date of original delivery order; option-based extensions follow the prescribed formula.
  • GST: Bidders to verify GST applicability independently; reimbursement terms to be confirmed in the contract.
  • Financial standing: Bidder should not be liquidated or bankrupt; an undertaking is required.
  • OEM participation: OEM turnover criteria apply; in multi-item bids, the primary product OEM should meet the highest bid value turnover criterion.
  • Documentation: Required documents include GST certificate, PAN, experience certificates, financial statements, and EMD documentation; OEM authorizations may be needed depending on items.

Key Specifications

  • CONTROL VALVE

  • VALVE KNORR AE 5120

  • COOLING FAN

  • OIL FILTER

  • DRUM ASSY

  • UJ KIT

  • BREAK ACTUATOR REAR

  • SPRING BRAKE ACTUATOR FRONT

  • GEAR LEVER KIT

  • No explicit technical metrics provided in the extract

Terms & Conditions

  • Quantity variation up to 25% during contract and post-award extensions

  • OEM turnover criteria required for bidder and OEM

  • Delivery period rules tied to original and extended periods with minimum 30 days

  • Bidder must provide audited turnover or CA certificate details

  • GST to be self-verified by bidders; reimbursement terms to be clarified

Important Clauses

Payment Terms

Not specified in extract; terms to be confirmed in bid document

Delivery Schedule

Delivery starts from last date of original delivery order; option-based extensions apply with calculated additional time

Penalties/Liquidated Damages

Not specified in extract; check bid terms for LD provisions

Bidder Eligibility

  • Not under liquidation, court receivership, or bankruptcy

  • Must meet turnover criteria for bidder and OEM as per bid document

  • Provide audited financials or CA/Cost Accountant certificates for turnover

Advertisement

Tender Data

Bid Details

Quantity

32

Category

CONTROL VALVE

Bid Type

Single Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

OEM Avg. Turnover

2

Past Performance

40 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

CONTROL VALVE , VALVE KNORR AE 5120 , COOLING FAN , OIL FILTER , DRUM ASSY , UJ KIT , BREAK ACTUATOR REAR , SPRING BRAKE ACTUATOR FRONT , GEAR LEVER KIT

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Sonitpur

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-SonitpurSonitpur--415-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-10001026.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 9 Items Sign in for GEM prices

#1

CONTROL VALVE

CONTROL VALVE

4 nos Delivery: 15 days
#2

VALVE KNORR AE 5120

VALVE KNORR AE 5120

4 nos Delivery: 15 days
#3

COOLING FAN

COOLING FAN

3 nos Delivery: 15 days
#4

OIL FILTER

OIL FILTER

5 nos Delivery: 15 days
#5

DRUM ASSY

DRUM ASSY

1 nos Delivery: 15 days
#6

UJ KIT

UJ KIT

4 nos Delivery: 15 days
#7

BREAK ACTUATOR REAR

BREAK ACTUATOR REAR

3 nos Delivery: 15 days
#8

SPRING BRAKE ACTUATOR FRONT

SPRING BRAKE ACTUATOR FRONT

3 nos Delivery: 15 days
#9

GEAR LEVER KIT

GEAR LEVER KIT

5 nos Delivery: 15 days
Advertisement

Categories 22

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Audited financial statements / CA certificate showing turnover for last 3 financial years

4

OEM authorization letters (where applicable)

5

Experience certificates for similar supply

6

Bid security / EMD documents as per bid data

7

Technical compliance certificates (if any) and product specifications

8

Identity and relevant business registrations

Frequently Asked Questions

Key insights about ASSAM tender market

How to bid for Indian Army control valve and kit tender in India 2026

Bidders must submit GST registration, PAN, and audited turnover for last 3 years, plus OEM authorizations for KNORR AE 5120 items. Provide EMD as per bid document and demonstrate non-liquidation status. Adhere to 25% quantity variation and deliver per original delivery period with extension rules.

What documents are required for Indian Army vehicle component tender in India

Required documents include GST certificate, PAN, audited financial statements or CA certificate, experience certificates for similar supply, OEM authorizations, EMD documentation, and technical compliance certificates. Submit all documents with bid as per terms and conditions.

What are the delivery terms for Indian Army 2026 procurement

Delivery starts from the last date of the original delivery order. If option quantities are exercised, add time is calculated as (increased quantity / original quantity) × original delivery period, with a minimum of 30 days. The purchaser may extend duration up to the original period.

What is the OEM turnover requirement for this Indian Army tender

OEM turnover must meet the minimum average annual turnover for the last 3 years as specified in the bid document. If the OEM is under 3 years old, use completed years after incorporation for turnover calculations and provide audited or CA-certified proof.

Are there any warranty or penalty clauses for this Indian Army bid

Penalties or LD details are not specified in the extract. Vendors should consult the bid document for exact liquidated damages, warranty period, and performance security requirements before submission.

What are the key product categories covered in this tender in India

Items cover CONTROL VALVE, VALVE KNORR AE 5120, COOLING FAN, OIL FILTER, DRUM ASSY, UJ KIT, BREAK ACTUATOR REAR, SPRING BRAKE ACTUATOR FRONT, and GEAR LEVER KIT. Ensure OEM/brand compatibility and confirm ISI/ISO certifications if specified in the full bid.

How to verify GST applicability for this Indian Army procurement

Bidder must determine GST applicability independently; the buyer notes GST reimbursement as per contract terms. Ensure GST registration is valid and align quotation with applicable GST rates and compliance requirements.

What is the scope of quantity variation allowed in this tender

The purchaser reserves the right to increase or decrease quantity up to 25% at contract placement and during the currency of the contract at contracted rates. Extended delivery calculations follow the stated formula with a minimum 30 days extension.

Advertisement