Indian Army Rotational Moulded Polyethylene Water Storage Tanks (V3) IS 12701 & Tower Bolts IS 204 Tender Pune 2026
Indian Army
PUNE, MAHARASHTRA
Bid Publish Date
06-Jan-2026, 1:53 pm
Bid End Date
04-Feb-2026, 9:00 am
Progress
Quantity
1300
Bid Type
Two Packet Bid
The Directorate Of Printing invites bids for MAPLITHO PAPER conforming to IS 1848 (Part 1) (Q2). Key focus areas include GSM specification and paper sizes in millimeters, with no BOQ items listed. The tender references a flexible quantity mechanism allowing up to a 25% increase/decrease at contract award and during the contract period at contracted rates. Although start/end dates and estimated value are not disclosed, bidders should prepare for IS 1848 Part 1 compliance and standard procurement terms. The unique clause on adjustable quantities and delivery timelines differentiates this tender from monotonous fixed-quantity procurements.
MAPLITHO paper conforming to IS 1848 (Part 1)
GSM specification (exact value not disclosed)
Paper sizes in millimeters (exact sizes not disclosed)
Delivery terms include 25% quantity variation at contract and during the contract period
Delivery period recalculated based on the option clause with minimum 30 days
Option clause allows ±25% quantity changes at contract time and during the contract period
Delivery period starts from the last date of the original delivery order
Extended delivery time follows ((Increased quantity ÷ Original quantity) × Original delivery period) with minimum 30 days
Not specified in available data; bidders should await ATC for payment terms linked to IS 1848 MAPLITHO procurement
Delivery initiation based on last original delivery order date; extended periods determined by option clause equation
Not detailed in provided tender data; verify ATC for LD/penalty mechanisms tied to delivery delays
Demonstrated capability to supply MAPLITHO paper conforming to IS 1848 (Part 1)
Compliance with standard government procurement requirements and IS 1848 alignment
Financial capacity to support potential 25% quantity variation within contract bounds
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
PUNE, MAHARASHTRA
Indian Army
TINSUKIA, ASSAM
Nagar Palika Parishad Garhmukteshwar
GHAZIABAD, UTTAR PRADESH
Indian Army
NASHIK, MAHARASHTRA
N/a
DHAR, MADHYA PRADESH
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| STANDARDS | GSM of the Paper | 70 gsm |
| STANDARDS | Sizes of Paper (In mm) | A1 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates demonstrating MAPLITHO paper supply (if available)
Financial statements or creditworthiness documents
EMD/Security deposit documentation (as per state/national guidelines)
Technical bid documents demonstrating IS 1848 (Part 1) conformity
OEM authorizations or supplier credentials (if applicable)
Extended Deadline
04-Feb-2026, 9:00 am
Opening Date
04-Feb-2026, 9:30 am
Extended Deadline
03-Feb-2026, 9:00 am
Opening Date
03-Feb-2026, 9:30 am
Extended Deadline
27-Jan-2026, 9:00 am
Opening Date
27-Jan-2026, 9:30 am
Bidders should confirm MAPLITHO paper conformity to IS 1848 Part 1 and prepare documentation including GST, PAN, and financials. Ensure IS 1848 compliance, provide technical bids detailing GSM and sizes, and be ready for the 25% quantity variation clause. ATC will specify delivery terms and payment methods.
Required documents include GST certificate, PAN, experience certificates (MAPLITHO supply if available), financial statements, EMD documentation, technical compliance certificates, and OEM authorizations if applicable. These enable bid submission and eligibility assessment by the Directorate Of Printing.
Essential specs include GSM specification and paper sizes in millimeters as per IS 1848 Part 1. Bidders must demonstrate conformity with these standards and provide supporting test certificates or manufacturer data sheets validating GSM values and exact dimensions.
The exact submission deadline is not provided in the available data. Bidders should monitor the tender portal and ATC documents for the final date, ensuring submission of all required documents and technical bids as per IS 1848 conformity.
Payment terms will be defined in the ATC; however, delivery terms allow a 25% quantity variation with delivery periods recalculated from the last order date. Prepare for potential revised delivery timelines and ensure financial readiness to honor contracted rates during variation.
Eligibility requires capability to supply IS 1848 Part 1 conforming MAPLITHO paper, possession of GST/PAN, financial viability, and possibly prior MAPLITHO supply experience. OEM authorization may be needed if OEM brand requirements are specified in ATC.
The purchaser may adjust quantity by up to 25% at contract; additional time is calculated as (Increase quantity ÷ Original quantity) × Original delivery period, with a minimum 30 days. Ensure production planning reflects potential variations and buffer inventory.
Standards referenced include IS 1848 (Part 1) for MAPLITHO paper. Suppliers should provide data sheets, test certificates, or manufacturer certification confirming GSM and size compliance, and any BIS/ISI marks if applicable to the product.
North Western Railway
📍 UDAIPUR, RAJASTHAN
North Western Railway
📍 UDAIPUR, RAJASTHAN
N/a
📍 RAIPUR, CHHATTISGARH
N/a
📍 RAIPUR, CHHATTISGARH
Northern Coalfields Limited
Sign up now to access all documents
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS