Metal Shelving Racks (Adjustable Type) conforming To Is 1883 (V2)
Health Department
WEST CHAMPARAN, BIHAR
Bid Publish Date
09-Jul-2026, 5:12 pm
Bid End Date
20-Jul-2026, 10:00 am
Location
Progress
Quantity
15
Bid Type
Two Packet Bid
The opportunity is with the Indian Air Force for the supply, installation, testing and commissioning of Metal Shelving Racks (Adjustable Type) conforming to IS 1883 (V2) Q2. Location is Gorakhpur, Uttar Pradesh 273001. The contract covers supply, installation, testing, and commissioning with a flexible quantity clause allowing up to 50% variation in ordered quantity. A 5-year warranty is required from final acceptance, including on-site rectification of breakdowns and OEM warranty certificates at delivery. The scope includes service support through dedicated Indian service centers post-installation, and performance guarantees at consignee sites. The absence of BOQ items indicates a single packaged solution may be tendered with standard rack configurations meeting IS 1883 (V2) Q2.
Key differentiators include the mandatory maintenance network in India, extended warranty commitment, and the option to adjust delivery timelines per the option clause while maintaining contracted rates. The tender emphasizes conformance to dimensional tolerances and material specifications, ensuring modularity and durability in demanding military storage environments.
IS 1883 (V2) compliant metal shelving racks
Overall height tolerance ±50 mm
Overall depth tolerance ±10 mm
Adjustable beam/upright system
Wooden rack components with specified finishes
Strips and binstrips availability
5-year warranty from final acceptance
On-site installation, testing and commissioning
Option clause allows up to 50% quantity variation at contract time and during currency
Scope includes supply, installation, testing and commissioning
5-year OEM warranty with service centers in India
Payment terms to be as per government norms; may require milestone-based payments after installation and testing
Delivery period may be extended per option clause; additional time calculated as (increased quantity/original quantity) × original delivery period with minimum 30 days
Penalties to be defined in contract; ensure LDs for delays and non-conformance are clearly stated
Experience in supplying and installing IS 1883 (V2) compliant shelving systems
Proven service network with centers near consignee locations
Capability to provide 5-year warranty and OEM certifications
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Metal Shelving Racks (Adjustable Type) conforming To Is 1883 (V2) (Q2)
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Gorakhpur
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Gorakhpur | Gorakhpur | - | - | 15 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Health Department
WEST CHAMPARAN, BIHAR
Central University Of Kerala
KASARGOD, KERALA
East Central Railway
EAST CHAMPARAN, BIHAR
Nuclear Power Corporation Of India Limited
HISAR, HARYANA
East Coast Railway
VISAKHAPATNAM, ANDHRA PRADESH
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| STANDARDS AND CERTIFICATIONS | Governing Standard | Conformity to IS 1883 |
| GENERIC | Types of Shelving Racks | Closed Type (with side and back sheets) |
| DIMENSIONS AND TOLERANCES | Overall Height of Shelving Racks (Tolerance: ± 50 mm) | 975 mm |
| DIMENSIONS AND TOLERANCES | Overall Depth of Shelving Racks (Tolerance: ± 10 mm) | 300 mm |
| MATERIAL REQUIREMENTS | Type of material for rack shelves | Metal |
| MATERIAL REQUIREMENTS | Material of rack shelves | Steel Sheet - Grade CR1 of IS 513 (Part 1) |
| MATERIAL REQUIREMENTS | Finish of Wooden Rack Shelves | NA |
| MATERIAL REQUIREMENTS | Type of material for rack sides | Metal |
| MATERIAL REQUIREMENTS | Material of rack Sides | Steel Sheet - Grade CR1 of IS 513 (Part 1) |
| MATERIAL REQUIREMENTS | Finish of Wooden rack sides | NA |
| MATERIAL REQUIREMENTS | Type of material for rack panel | Metal |
| MATERIAL REQUIREMENTS | Material of rack panel | Steel Sheet - Grade CR1 of IS 513 (Part 1) |
| MATERIAL REQUIREMENTS | Finish of Wooden rack panel | NA |
| MATERIAL REQUIREMENTS | Availability of Strips | No |
| MATERIAL REQUIREMENTS | Availability of Binstrips | No |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates (relevant to IS 1883 (V2) compliant shelving systems)
Financial statements (as required by bid)
EMD/Security deposit documentation (amount not specified in data)
Technical bid documents demonstrating IS 1883 (V2) compliance
OEM authorizations / dealership certificates
Warranty certificates and service center details near consignee location
Key insights about UTTAR PRADESH tender market
Bidders must submit GST, PAN, experience certificates, financials, and EMD along with technical compliance to IS 1883 (V2). The bid must include OEM authorizations and service-center details. The scope covers supply, installation, testing, commissioning, and 5-year warranty; ensure installation readiness at consignee site.
Required documents include GST registration, PAN card, experience certificates for IS 1883 (V2) shelf systems, financial statements, EMD/Security deposit, OEM authorization, and warranty certificates. Ensure service centers list near Gorakhpur for after-sales support and on-site training.
Specs specify adjustable shelving racks conforming to IS 1883 (V2) with height tolerance ±50 mm and depth tolerance ±10 mm. Materials for shelves, sides, and panels must meet specified finish criteria; availability of strips and binstrips is included; 5-year warranty applies from final acceptance.
Delivery time can be extended under the option clause: additional time equals (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days, and extension may apply up to the original delivery period.
A 5-year warranty from final acceptance or after commissioning is required. OEM warranty certificates must accompany delivery; supplier must provide on-site rectification for any breakdown within the warranty period and maintain service centers across India.
Scope includes Supply, Installation, Testing and Commissioning (SITC) of metal shelving racks; the bid must cover all cost components; training and post-installation troubleshooting are included; ensure IS 1883 (V2) compliance and warranty fulfillment.
Mandatory conformance to IS 1883 (V2) Q2, with OEM authorizations and warranty documentation. Bidders must upload all required certificates per ATC; non-submission can lead to rejection; ensure service-center presence near consignee location.
Procurement is for the Indian Air Force at Gorakhpur, Uttar Pradesh; the category is Metal Shelving Racks (Adjustable Type) conforming to IS 1883 (V2) Q2; the contract includes SITC and a 5-year warranty.
Indian Maritime University
📍 ERNAKULAM, KERALA
Bihar State Police - A Voyage Of Excellence
📍 PATNA, BIHAR
N/a
📍 BHARUCH, GUJARAT
Government Polytechnic Vyara
📍 SURAT, GUJARAT
Directorate Of Health Services Kashmir
📍 ANANTHNAG, JAMMU & KASHMIR
Sign up now to access all documents
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS