shifting of AFNET equipment from ER-I to NFS Site-I along with all Accessories
Indian Air Force
THANJAVUR, TAMIL NADU
Menu
Bid Publish Date
03-Dec-2025, 11:04 am
Bid End Date
17-Dec-2025, 4:00 pm
Location
Progress
Quantity
190
Category
Group- 1 - SMAW Equipment-04 Nos, GTAW Equipment -04 Nos alongwith all accessories
Bid Type
Two Packet Bid
A tender has been published for Bharat Heavy Electricals Limited (bhel) Group- 1 - SMAW Equipment-04 Nos, GTAW Equipment -04 Nos alongwith all accessories, Group- 1- stay a in GAUTAM BUDDHA NAGAR, UTTAR PRADESH. Quantity: 190 by. Submission Deadline: 17-12-2025 16: 00: 00. Check eligibility and apply.
Indian Air Force
THANJAVUR, TAMIL NADU
Indian Coast Guard
VISAKHAPATNAM, ANDHRA PRADESH
Container Corporation Of India Limited
NEW DELHI, DELHI
Office Of Dg ( Ns & M)
JODHPUR, RAJASTHAN
Indian Air Force
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Group- 1 - SMAW Equipment-04 Nos, GTAW Equipment -04 Nos alongwith all accessories | Group-1 Total lump sum price of SMAW Equipment-04 Nos (02 Nos. in Talcher Project and 02 Nos. in Lara Project) and GTAW Equipment -04 Nos (02 Nos. in Talcher Project and 02 Nos. in Lara Project) along with all accessories including Freight and GST | 1 | lot | raeesul_azam | 365 |
| 2 | Group- 1- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara | Group-1- stay at site including lodging, boarding, local conveyence etc. for Supervision of Erection and Commissioning etc. at site-02 Days in Talcher and 02 Days in Lara-Please refer Price schedule of Tender | 4 | days | raeesul_azam | 365 |
| 3 | Group- 1- site visit - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of Erec and Commiss etc at site-01 Visit in Talcher and 01 Visit in Lara | Group-1- should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara | 2 | visit | raeesul_azam | 365 |
| 4 | Group-2 -Videoscope or Borescope for Boiler tube,Header Inspection and retrieval tool-02 Nos and Video image scope with measuring facility-02 Nos and Magnifying glass-08 Nos with all acce | Group-2-Total lump sum Price for Videoscope/Borescope for Boiler tube,Header Inspection and retrieval tool-02 Nos. (01 in Talcher and 01 in Lara Project) and Video image scope with measuring facility-02 Nos. and Magnifying glass-08 Nos. along with all accessories-08 Nos. (04 in Talcher and 04 in Lara Project) Please refer Price Schedule | 1 | lot | raeesul_azam | 365 |
| 5 | Group-2 - stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-04 Days in Talcher and 04 Days in Lara | Group-2 -Total lump sum price for stay at site including lodging, boarding, local conveyence etc. for Supervision of Erection and Commissioning etc. at site-02 Days in Talcher and 02 Days in Lara-Please refer Price schedule of Tender. | 8 | days | raeesul_azam | 365 |
| 6 | Group-2 - site visit - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara | Group-2 - Total lump sum price for site visit - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara | 4 | visit | raeesul_azam | 365 |
| 7 | Group-3 - Portable X-ray Residual Stress system-02 Nos along with all accessories | Group-3-Total lump sum Price for Portable X-ray Residual Stress system-02 Nos (01 Nos. in Talcher Project and 01 Nos. in Lara Project) along with all accessories-Please refer Price Schedule | 1 | lot | raeesul_azam | 365 |
| 8 | Group-3 - stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara | Group-3 - Total lump sum price for stay at site including lodging, boarding, local conveyence etc. for Supervision of Erection and Commissioning etc. at site-02 Days in Talcher and 02 Days in Lara-Please refer Price Schedule. | 4 | days | raeesul_azam | 365 |
| 9 | Group-3 - site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 010 Visit in Lara | Group-3 - Total lump sum price for site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 010 Visit in Lara | 2 | visit | raeesul_azam | 365 |
| 10 | Group-4 - ABI-Automated Ball IndentationTester- for Mechnical Propoerties-02 Nos along with all accessories | Group-4-Total lump sum Price for ABI (Automated Ball Indentation) Tester for Mechnical Propoerties-02 Nos (01 nos. in Talcher & 01 Nos. in Lara Project) along with all accessories-Please refer Price Schedule | 1 | lot | raeesul_azam | 365 |
| 11 | Group-4 - stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara | Group-4 - Total lump sum price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara-Please refer Price Schedule | 4 | days | raeesul_azam | 365 |
| 12 | Group-4 - site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara | Group-4 - Total lump sum price for site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara | 2 | visit | raeesul_azam | 365 |
| 13 | Group-5 - Magnetic Particle Inspection Yoke Type-02 Nos, Pie Gauge for MPI-02 Nos, Radiography Film densitometer-02 Nos, UV Lamp for Fluorescent MPI and DPT-02 Nos along with all accessories | Group-5 - Total lump sum Price for Magnetic Particle Inspection Yoke Type-02 Nos (01 in Talcher and 01 in LARA), Pie Gauge for MPI-02 Nos (01 in Talcher and 01 in LARA), Radiography Film densitometer-02 Nos (01 in Talcher and 01 in LARA) , UV Lamp for Fluorescent MPI and DPT-02 Nos (01 in Talcher and 01 in LARA) along with all accessories-Please refer Price Schedule | 1 | lot | raeesul_azam | 365 |
| 14 | Group-5 - stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara | Group-5 - Total lump sum price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara-Please refer Price Schedule n | 4 | days | raeesul_azam | 365 |
| 15 | Group-5 - site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara | Group-5 - Total lump sum price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara-Please refer Price Schedule | 2 | visit | raeesul_azam | 365 |
| 16 | Group-6 - Radiation Survey Meter-02 Nos, Personal digital dosimeter-04 Nos, Ultrasonic testing machine-Conventional with Probes and calibration blocks-02 Nos with all accessories | Group-6 -Total lump sum price Radiation Survey Meter-02 Nos (01 in Talcher and 01 in Lara), Personal digital dosimeter-04 Nos (02 in Talcher and 02 in Lara), Ultrasonic testing machine-Conventional with Probes and calibration blocks-02 Nos (01 in Talcher and 01 in Lara) with all accessories | 1 | lot | raeesul_azam | 365 |
| 17 | Group-6- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara | Group-6- Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara | 4 | days | raeesul_azam | 365 |
| 18 | Group-6 - site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara | Group-6 - Total lump sum Price for site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara | 2 | visit | raeesul_azam | 365 |
| 19 | Group-7- Digital Radiography-02 Nos along with all accessories | Group-7-Total lump sum Price Digital Radiography-02 Nos (01 in Talcher and 01 in Lara) along with all accessories | 1 | lot | raeesul_azam | 365 |
| 20 | Group-7- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-04 Days in Talcher and 04 Days in Lara | Group-7- Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-04 Days in Talcher and 04 Days in Lara. Please refer Price Schedule | 8 | days | raeesul_azam | 365 |
| 21 | Group-7 - site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara | Group-7 - Total lump sum Price for site visit - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara.Please refer Price Schedule. | 4 | visit | raeesul_azam | 365 |
| 22 | Group-8- Optical microscope for replica interpretation,Optical microscope and Image Analysis System, Stereo Microscope with Camera Attachment-02 Nos | Group-8- Total lump sum Price for Optical microscope for replica interpretation,Optical microscope and Image Analysis System, Stereo Microscope with Camera Attachment-02 Nos(01 in Talcher and 01 in Lara) alongwith all accessories along with all accessories | 1 | lot | raeesul_azam | 365 |
| 23 | Group-8- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-01 Days in Talcher and 01 Days in Lara | Group-8- Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-01 Days in Talcher and 01 Days in Lara | 4 | days | raeesul_azam | 365 |
| 24 | Group-8- site visit - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara | Group-8- Total lump sum Price for site visit- should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara | 2 | visit | raeesul_azam | 365 |
| 25 | Group-9- Computed Radiography-CR-Scanner-02 Nos-alongwith all accessories Please refer Price Schedule | Group-9- Total lump sum Price-Computed Radiography-CR-Scanner-02 Nos-(01 in Talcher and 01 in Lara) alongwith all accessories Please refer Price Schedule | 1 | lot | raeesul_azam | 365 |
| 26 | Group-9- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-04 Days in Talcher and 04 Days in Lara | Group-9- Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-04 Days in Talcher and 04 Days in Lara | 4 | days | raeesul_azam | 365 |
| 27 | Group-9- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara | Group-9- Total lump sum Price for site visit - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara | 2 | visit | raeesul_azam | 365 |
| 28 | Group-10- Hardness Tester -Rebound Type-02 Nos and Hardness Tester_UCI Method-02 Nos-along with all accessories | Group-10-Total lump sum Price-Hardness Tester -Rebound Type-02 Nos (01 in Talcher and 01 in Lara) and Hardness Tester_UCI Method-02 Nos-(01 in Talcher and 01 in Lara)along with all accessories | 1 | lot | raeesul_azam | 365 |
| 29 | Group-10- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara | Group-10- Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara | 4 | days | raeesul_azam | 365 |
| 30 | Group-10- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara | Group-10- Total lump sum Price for site visit- should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara | 2 | visit | raeesul_azam | 365 |
| 31 | Group-11- Radiography film viewer-04 Nos, Radiography film Samples-ASME-02 Nos , Magnetic Particles Inspection-Coil Type with Cable-02 Nos, Gaussmeter for MPI-02 Nos, Ni-Cr Panel for DPT-02 Nos | Group-11-Total lump sum Price for Radiography film viewer-04 Nos (02 in Talcher and 02 in Lara), Radiography film Samples-ASME-02 Nos (01 in Talcher and 01 in Lara) , Magnetic Particles Inspection-Coil Type with Cable-02 Nos (01 in Talcher and 01 in Lara), Gaussmeter for MPI-02 Nos (01 in Talcher and 01 in Lara) , Ni-Cr Panel for DPT-02 Nos (01 in Talcher and 01 in Lara). Please refer price schedule | 1 | lot | raeesul_azam | 365 |
| 32 | Group-11- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara | Group-11- Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara | 4 | days | raeesul_azam | 365 |
| 33 | Group-11- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara | Group-11- Total lump sum Price for site visit- should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara | 2 | visit | raeesul_azam | 365 |
| 34 | Group-12-Pls refer item description and price schedule for details_Holiday Detector, Stethoscope, Vibration Meter, Comparator, Roughness Meter, Noise Meter, Torque Wrench etc | Group-12-Total lump sum Price for Hardness Tester-02 Nos (01 in Talcher and 01 in Lara), Exfoliation Meter for SS tubes-02 Nos (01 in Talcher and 01 in Lara), Thermography Camera-02 Nos (01 in Talcher and 01 in Lara), Holiday Detector-02 Nos (01 in Talcher and 01 in Lara), Engineering stethoscope-02 Nos (01 in Talcher and 01 in Lara), Portable vibration Meter-02 Nos (01 in Talcher and 01 in Lara), Comparator-02 Nos (01 in Talcher and 01 in Lara), Surface roughness Meter-02 Nos (01 in Talcher and 01 in Lara), Spirit Level-04 Nos (02 in Talcher and 02 in Lara), Noise Level Meter-02 Nos(01 in Talcher and 01 in Lara), Torgue wrench-02 Set (01 in Talcher and 01 in Lara), Pressure Gauge-04 Nos (02 in Talcher and 02 in Lara), Mercury Thermometer-04 Nos (02 in Talcher and 02 in Lara), Infrared Thermometer-02 Nos (01 in Talcher and 01 in Lara), Digital Thermometer _n-contact_-02 nos(01 in Talcher and 01 in Lara), Digital Thermometer Contact-Type-02 Nos(01 in Talcher and 01 in Lara),Thermocouple Test-4 Nos(02 in Talcher and 02 in Lara), Barometer -aneroid-08 Nos(04 in Talcher and 04 in Lara), Mameter-test and U tube-02 Nos (01 in Talcher and 01 in Lara),Hygrometer-02 Nos (01 in Talcher and 01 in Lara) along with all accessories | 1 | lot | raeesul_azam | 365 |
| 35 | Group-12- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-10 Days in Talcher and 10 Days in Lara | Group-12-Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-10 Days in Talcher and 10 Days in Lara | 20 | days | raeesul_azam | 365 |
| 36 | Group-12- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara | Group-12-Total lump sum Price for site visit - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara | 4 | visit | raeesul_azam | 365 |
| 37 | Group-13- Replica kit for in-situ Metallography-02 Nos, Sample preparation tools_machines-02 Set, In-situ Metallogrpahy kit-Grinder and polisher with accessories-02 set along with all accessories | Group-13-Total lump sum Price for Replica kit for in-situ Metallography-02 Nos (01 in Talcher and 01 in Lara), Sample preparation tools_machines-02 Set(01 in Talcher and 01 in Lara), In-situ Metallogrpahy kit-Grinder and polisher with accessories-02 set(01 in Talcher and 01 in Lara) along with all accessories | 1 | lot | raeesul_azam | 365 |
| 38 | Group-13- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-06 Days in Talcher and 06 Days in Lara | Group-13- Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-06 Days in Talcher and 06 Days in Lara | 12 | days | raeesul_azam | 365 |
| 39 | Group-13- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara | Group-13- Total lump sum Price for site visit- should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara | 4 | visit | raeesul_azam | 365 |
| 40 | Group-14- MCF_Magnetic Stauroscope_for assessment of quality of PWHT-02 Nos, Argon Purity tester-02 Nos, Inspector Kit for Welding Inspection-02 Nos,Temperature Gun-02 Nos along with all accessories | Group-14-Total lump sum Price for MCF_Magnetic Stauroscope_for assessment of quality of PWHT-02 Nos, Argon Purity tester-02 Nos(01 in Talcher and 01 in Lara), Inspector Kit for Welding Inspection-02 Nos(01 in Talcher and 01 in Lara),Temperature Gun-02 Nos(01 in Talcher and 01 in Lara) along with all accessories | 1 | lot | raeesul_azam | 365 |
| 41 | Group-14- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-04 Days in Talcher and 04 Days in Lara | Group-14- Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-04 Days in Talcher and 04 Days in Lara | 8 | days | raeesul_azam | 365 |
| 42 | Group-14- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara | Group-14- site visit -should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara | 4 | visit | raeesul_azam | 365 |
| 43 | Group-15- Binoculars-04 Nos, Laser alignment Kit with target kit-02 Nos, along with all accessories | Group-15-Total lump sum Price for Binoculars-04 Nos(02 in Talcher and 02 in Lara), Laser alignment Kit with target kit-02 Nos(01 in Talcher and 01 in Lara), along with all accessories | 1 | lot | raeesul_azam | 365 |
| 44 | Group-15- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara | Group-15-Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara | 4 | days | raeesul_azam | 365 |
| 45 | Group-15- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara | Group-15- Total lump sum Price for site visit -should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara | 2 | visit | raeesul_azam | 365 |
| 46 | Group-16- Remote Field Eddy current testing_Advance Electro magnetic testing-02 Nos, along with all accessories | Group-16-Total lump sum Price for Remote Field Eddy current testing_Advance Electro magnetic testing-02 Nos (01 in Talcher and 01 in Lara), along with all accessories | 1 | lot | raeesul_azam | 365 |
| 47 | Group-16- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara | Group-16-Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara | 4 | days | raeesul_azam | 365 |
| 48 | Group-16- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara | Group-16-Total lump sum Price for site visit -should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara | 2 | visit | raeesul_azam | 365 |
| 49 | Group-17- Helium Leak Detector-02 Nos along with all accessories | Group-17-Total lump sum Price for Helium Leak Detector-02 Nos(01 in Talcher and 01 in Lara) along with all accessories | 1 | lot | raeesul_azam | 365 |
| 50 | Group-17- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara | Group-17-Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara | 4 | days | raeesul_azam | 365 |
| 51 | Group-17- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara | Group-17- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara | 2 | visit | raeesul_azam | 365 |
| 52 | Group-18- Oxide Measurement for Boiler Tubes-02 Nos along with all accessories | Group-18-Total lump sum Price for Oxide Measurement for Boiler Tubes-02 Nos (01 in Talcher and 01 in Lara) along with all accessories | 1 | lot | raeesul_azam | 365 |
| 53 | Group-18- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara | Group-18-Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara | 4 | days | raeesul_azam | 365 |
| 54 | Group-18- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara | Group-18-Total lump sum Price for site visit - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara | 2 | visit | raeesul_azam | 365 |
| 55 | Group-19-Pls refer item discription_ UT Meter, Vernier, Outside _ Inside Micrometer 25_750 dial, Measuring Tape, Paint Thickness Meter, Paint Adhesion Kit, Internal Oxide Scale System | Group-19-Total lump sum Price for Ultrasonic Thickness meter_D-Meter-Digital-04 Nos (02 in Talcher and 02 in Lara), Vernier 300 mm Scale-04 Nos (02 in Talcher and 02 in Lara),Vernier 600 mm Scale-04 Nos (02 in Talcher and 02 in Lara), Outside Micrometre-04 Nos (02 in Talcher and 02 in Lara), Inside Micrometer 25-750_dial-04 Nos (02 in Talcher and 02 in Lara), Measuring Tape-04 Nos (02 in Talcher and 02 in Lara), Paint thickness Meter_Elcometer-Ultrasonic digital-02 Nos (01 in Talcher and 01 in Lara), Paint adhesion testing Kit-02 Nos(01 in Talcher and 01 in Lara),Internal oxide scale measuring system with Probe_UTbased-02 Nos(01 in Talcher and 01 in Lara) along with all accessories | 1 | lot | raeesul_azam | 365 |
| 56 | Group-19- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-04 Days in Talcher and 04 Days in Lara | Group-19- Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-04 Days in Talcher and 04 Days in Lara | 8 | days | raeesul_azam | 365 |
| 57 | Group-19- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara | Group-19-Total lump sum Price for site visit- should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara | 2 | visit | raeesul_azam | 365 |
| 58 | Group-20- Welding Simulator-02 Nos along with all accessories | Group-20-Total lump sum Price for Welding Simulator-02 Nos (01 in Talcher and 01 in Lara) along with all accessories | 1 | lot | raeesul_azam | 365 |
| 59 | Group-20- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara | Group-20-Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara | 4 | days | raeesul_azam | 365 |
| 60 | Group-20- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara | Group-20-Total lump sum Price for site visit -should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara | 2 | visit | raeesul_azam | 365 |
Discover companies most likely to bid on this tender
RRVPN - CMD
📍 JAIPUR, RAJASTHAN
RRVPN - CMD
📍 JODHPUR, RAJASTHAN
PHE
📍 Jhargram, WEST BENGAL
WEST BENGAL TRIBAL DEVELOPMENT CO-OP CORP. LTD.
📍 Alipurduar, WEST BENGAL
PHE
📍 PURULIA, WEST BENGAL
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Choose from flexible plans to access tender documents instantly
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS