TenderDekho Logo
Closed GEM

Procurement Opportunity: Group- 1 - SMAW Equipment-04 Nos, GTAW Equipment -04 Nos alongwith all accessories,Group- 1- stay a in GAUTAM BUDDHA NAGAR, UTTAR PRADESH

Bid Publish Date

03-Dec-2025, 11:04 am

Bid End Date

02-Jan-2026, 4:00 pm

Generate Docs

Progress

RA
Issue03-Dec-2025, 11:04 am
Reverse Auction10-Mar-2026, 10:00 am
Award26-May-2026, 12:30 am
Explore all 4 tabs to view complete tender details

Quantity

190

Category

Group- 1 - SMAW Equipment-04 Nos, GTAW Equipment -04 Nos alongwith all accessories

Bid Type

Two Packet Bid

Categories 165

BP INSTRUMENT MOISTURE ANALYSER ORGANIC CARBON ANALYZERS SPECTROSCOPIC EQUIPMENT ULTRASONIC EXAMINATION RUBBER FENDER BOILER TUBE VOLTAGE METERS DIAL GAUGE PLATFORM SCALE DECIBEL METER THICKNESS MEASURING DEVICES ELECTROMAGNETIC CRACK DETECTOR APFC PANEL DIAGNOSTIC TOOL ULTRASONIC TESTING SYSTEM PARAMETER TEST STRUCTURE FABRICATION TESTING INSTRUMENT SIMULATOR LEVEL METER SALE OF SILVER ALCOHOL METER LABORATORY CHEMICAL MICRO METER MEASURING INSTRUMENT TUBE AND FITTING ARNO STARTING CONTACTOR CAMERA INFRARED TEMPERATURE INDICATOR OPTICAL INSTRUMENTS CRACK DETECTORS CONTRACT OF TRANSPORTATION WRENCH MICROMETER THICKNESS METER MEASURING EQUIPMENT METALS METALLURGY AND STRUCTURAL MATERIALS TESTING INSTRUMENTS STEEL FURNITURE DIGITAL THERMOMETER RADIO FREQUENCY ANALYSER AIR REGULATORS WELL TESTING EQUIPMENTS CR PANEL DISTEMPER HUMIDITY AND MOISTURE MEASURING INSTRUMENTS DIGITAL RADIOGRAPHY ULTRASONIC DETECTOR WATTMETERS VIBRATION MEASURING INSTRUMENT GRINDER INFRARED TEMPERATURE METER ACIDIZING DENSITY SENSORS EQUIPMENT AMC OF ELECTRONIC PROGRAMMABLE CRUCIBLE FURNACES ARTICULATING LAZY ARMS LABORATORY TOOLS MAGNETIC EQUIPMENT THICKNESS GAUGE LABORATORY ELECTROPHORESIS AND BLOTTING SYSTEM NDT WELDING MACHINE PANEL MAINTENANCE CONTRACT OF ELECTRONIC INDICATING AND RECORDING INSTRUMENTS WEATHER STATIONS ELECTROMAGNETIC TESTING COMPUTER RADIOGRAPHY POWER PRESSURE INDICATORS STETHOSCOPE INSPECTION SERVICE SCANNER PROGRAMMABLE BOX FURNACES BINOCULARS RADIOGRAPHIC EXAMINATION BLOCKS PNEUMATIC POSITIONER THERMOMETER DC MOTOR AUDIOMETERS VOLTMETER HYGROMETERS EQUIPMENTS FOR LABORATORY VIEWING AND OBSERVING INSTRUMENTS RADIATION SURVEY METER ANTI CORROSIVE PAINT GLUCOMETER MACHINE SUPPLY TEXTURE ANALYSER LABORATORY PRESSES ALFALFA SEEDS LABORATORY TESTING MACHINE WEATHER MACHINE, MONITORING SYSTEM AND EQUIPMENTS BID MANAGEMENT ANALOGUE SURVEY METER PRESSURE GAUGE WEIGH BRIDGE VIDEOSCOPES HELIUM RADIATION MONITOR THERMOWELLS PRESSURE REGULATOR TUBE SEED AND FEED EQUIPMENT THERMOCOUPLES MAGNETIC PARTICLE EXAMINATION EQUIPMENT AUTOMOTIVE TOOL WATER LEVEL RECORDER PRESSURE MEASURING AND CONTROL INSTRUMENTS HEAT MEASURING INSTRUMENTS RADIOGRAPHY WORK EQUIPMENT FOR LABORATORY FUME HOODS MAGNETIC CRACK DETECTOR BODYWEIGHT MEASURING SCALE ERECTION OF STRUCTURAL TESTING MACHINE HOT AIR BOILER STEAM GENERATOR LEAK TESTING EQUIPMENT WRENCHES AND DRIVERS ROUTINE MAINTENANCE SMART POSITIONER HANDHELD THERMOMETER HEATING EQUIPMENT SPARES ANAESTHESIA MACHINE MAGNETIC SCANNING ELECTRON MICROSCOPES RADIATION SAFETY DEVICE TOOL KIT CABLE PYROMETERS DOSIMETER FIRE BREATHING APPARATUS THERMOGRAPHY CAMERA MICROSCOPE FABRICATOR LIQUID SCINTILLATION COUNTERS MACHINE GAUGE ELECTRONIC DENSIMETER THERMAL IMAGING SYSTEMS METEOROLOGICAL INSTRUMENTS MOISTURE METERS PURE ELEMENTAL GASES DETECTOR METEOROLOGY INSTRUMENT EPU COATING FIRST AID BOX PEB TUNGSTEN ARC METALLOGRAPHY UV LAMP LENGTH THICKNESS AND DISTANCE MEASURING INSTRUMENTS KARL FISCHER TITRATION EQUIPMENT METAL PRODUCTS BOYLES APPARATUS HUMIDITY SENSOR ULTRASONIC MEDICAL DIAGNOSTIC GAMMA CAMERAS WEIGHTS MANUFACTURING SERVICES OTHER TESTING EQUIPMENT

A tender has been published for Bharat Heavy Electricals Limited (bhel) Group- 1 - SMAW Equipment-04 Nos, GTAW Equipment -04 Nos alongwith all accessories, Group- 1- stay a in GAUTAM BUDDHA NAGAR, UTTAR PRADESH. Quantity: 190 by. Submission Deadline: 02-01-2026 16: 00: 00. Check eligibility and apply.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Authority Records

MINISTRY OF HEAVY INDUSTRIESHEAVY INDUSTRY DEPARTMENTBHARAT HEAVY ELECTRICALS LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8662071.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 60 Items Sign in for GEM prices

#1

Group- 1 - SMAW Equipment-04 Nos, GTAW Equipment -04 Nos alongwith all accessories

Group-1 Total lump sum price of SMAW Equipment-04 Nos (02 Nos. in Talcher Project and 02 Nos. in Lara Project) and GTAW Equipment -04 Nos (02 Nos. in Talcher Project and 02 Nos. in Lara Project) along with all accessories including Freight and GST

1 lot Delivery: 365 days
#2

Group- 1- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

Group-1- stay at site including lodging, boarding, local conveyence etc. for Supervision of Erection and Commissioning etc. at site-02 Days in Talcher and 02 Days in Lara-Please refer Price schedule of Tender

4 days Delivery: 365 days
#3

Group- 1- site visit - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of Erec and Commiss etc at site-01 Visit in Talcher and 01 Visit in Lara

Group-1- should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

2 visit Delivery: 365 days
#4

Group-2 -Videoscope or Borescope for Boiler tube,Header Inspection and retrieval tool-02 Nos and Video image scope with measuring facility-02 Nos and Magnifying glass-08 Nos with all acce

Group-2-Total lump sum Price for Videoscope/Borescope for Boiler tube,Header Inspection and retrieval tool-02 Nos. (01 in Talcher and 01 in Lara Project) and Video image scope with measuring facility-02 Nos. and Magnifying glass-08 Nos. along with all accessories-08 Nos. (04 in Talcher and 04 in Lara Project) Please refer Price Schedule

1 lot Delivery: 365 days
#5

Group-2 - stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-04 Days in Talcher and 04 Days in Lara

Group-2 -Total lump sum price for stay at site including lodging, boarding, local conveyence etc. for Supervision of Erection and Commissioning etc. at site-02 Days in Talcher and 02 Days in Lara-Please refer Price schedule of Tender.

8 days Delivery: 365 days
#6

Group-2 - site visit - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara

Group-2 - Total lump sum price for site visit - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara

4 visit Delivery: 365 days
#7

Group-3 - Portable X-ray Residual Stress system-02 Nos along with all accessories

Group-3-Total lump sum Price for Portable X-ray Residual Stress system-02 Nos (01 Nos. in Talcher Project and 01 Nos. in Lara Project) along with all accessories-Please refer Price Schedule

1 lot Delivery: 365 days
#8

Group-3 - stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

Group-3 - Total lump sum price for stay at site including lodging, boarding, local conveyence etc. for Supervision of Erection and Commissioning etc. at site-02 Days in Talcher and 02 Days in Lara-Please refer Price Schedule.

4 days Delivery: 365 days
#9

Group-3 - site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 010 Visit in Lara

Group-3 - Total lump sum price for site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 010 Visit in Lara

2 visit Delivery: 365 days
#10

Group-4 - ABI-Automated Ball IndentationTester- for Mechnical Propoerties-02 Nos along with all accessories

Group-4-Total lump sum Price for ABI (Automated Ball Indentation) Tester for Mechnical Propoerties-02 Nos (01 nos. in Talcher & 01 Nos. in Lara Project) along with all accessories-Please refer Price Schedule

1 lot Delivery: 365 days
#11

Group-4 - stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

Group-4 - Total lump sum price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara-Please refer Price Schedule

4 days Delivery: 365 days
#12

Group-4 - site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

Group-4 - Total lump sum price for site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

2 visit Delivery: 365 days
#13

Group-5 - Magnetic Particle Inspection Yoke Type-02 Nos, Pie Gauge for MPI-02 Nos, Radiography Film densitometer-02 Nos, UV Lamp for Fluorescent MPI and DPT-02 Nos along with all accessories

Group-5 - Total lump sum Price for Magnetic Particle Inspection Yoke Type-02 Nos (01 in Talcher and 01 in LARA), Pie Gauge for MPI-02 Nos (01 in Talcher and 01 in LARA), Radiography Film densitometer-02 Nos (01 in Talcher and 01 in LARA) , UV Lamp for Fluorescent MPI and DPT-02 Nos (01 in Talcher and 01 in LARA) along with all accessories-Please refer Price Schedule

1 lot Delivery: 365 days
#14

Group-5 - stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

Group-5 - Total lump sum price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara-Please refer Price Schedule n

4 days Delivery: 365 days
#15

Group-5 - site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

Group-5 - Total lump sum price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara-Please refer Price Schedule

2 visit Delivery: 365 days
#16

Group-6 - Radiation Survey Meter-02 Nos, Personal digital dosimeter-04 Nos, Ultrasonic testing machine-Conventional with Probes and calibration blocks-02 Nos with all accessories

Group-6 -Total lump sum price Radiation Survey Meter-02 Nos (01 in Talcher and 01 in Lara), Personal digital dosimeter-04 Nos (02 in Talcher and 02 in Lara), Ultrasonic testing machine-Conventional with Probes and calibration blocks-02 Nos (01 in Talcher and 01 in Lara) with all accessories

1 lot Delivery: 365 days
#17

Group-6- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

Group-6- Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

4 days Delivery: 365 days
#18

Group-6 - site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara

Group-6 - Total lump sum Price for site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara

2 visit Delivery: 365 days
#19

Group-7- Digital Radiography-02 Nos along with all accessories

Group-7-Total lump sum Price Digital Radiography-02 Nos (01 in Talcher and 01 in Lara) along with all accessories

1 lot Delivery: 365 days
#20

Group-7- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-04 Days in Talcher and 04 Days in Lara

Group-7- Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-04 Days in Talcher and 04 Days in Lara. Please refer Price Schedule

8 days Delivery: 365 days
#21

Group-7 - site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara

Group-7 - Total lump sum Price for site visit - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara.Please refer Price Schedule.

4 visit Delivery: 365 days
#22

Group-8- Optical microscope for replica interpretation,Optical microscope and Image Analysis System, Stereo Microscope with Camera Attachment-02 Nos

Group-8- Total lump sum Price for Optical microscope for replica interpretation,Optical microscope and Image Analysis System, Stereo Microscope with Camera Attachment-02 Nos(01 in Talcher and 01 in Lara) alongwith all accessories along with all accessories

1 lot Delivery: 365 days
#23

Group-8- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-01 Days in Talcher and 01 Days in Lara

Group-8- Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-01 Days in Talcher and 01 Days in Lara

4 days Delivery: 365 days
#24

Group-8- site visit - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara

Group-8- Total lump sum Price for site visit- should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara

2 visit Delivery: 365 days
#25

Group-9- Computed Radiography-CR-Scanner-02 Nos-alongwith all accessories Please refer Price Schedule

Group-9- Total lump sum Price-Computed Radiography-CR-Scanner-02 Nos-(01 in Talcher and 01 in Lara) alongwith all accessories Please refer Price Schedule

1 lot Delivery: 365 days
#26

Group-9- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-04 Days in Talcher and 04 Days in Lara

Group-9- Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-04 Days in Talcher and 04 Days in Lara

4 days Delivery: 365 days
#27

Group-9- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara

Group-9- Total lump sum Price for site visit - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara

2 visit Delivery: 365 days
#28

Group-10- Hardness Tester -Rebound Type-02 Nos and Hardness Tester_UCI Method-02 Nos-along with all accessories

Group-10-Total lump sum Price-Hardness Tester -Rebound Type-02 Nos (01 in Talcher and 01 in Lara) and Hardness Tester_UCI Method-02 Nos-(01 in Talcher and 01 in Lara)along with all accessories

1 lot Delivery: 365 days
#29

Group-10- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

Group-10- Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

4 days Delivery: 365 days
#30

Group-10- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

Group-10- Total lump sum Price for site visit- should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

2 visit Delivery: 365 days
#31

Group-11- Radiography film viewer-04 Nos, Radiography film Samples-ASME-02 Nos , Magnetic Particles Inspection-Coil Type with Cable-02 Nos, Gaussmeter for MPI-02 Nos, Ni-Cr Panel for DPT-02 Nos

Group-11-Total lump sum Price for Radiography film viewer-04 Nos (02 in Talcher and 02 in Lara), Radiography film Samples-ASME-02 Nos (01 in Talcher and 01 in Lara) , Magnetic Particles Inspection-Coil Type with Cable-02 Nos (01 in Talcher and 01 in Lara), Gaussmeter for MPI-02 Nos (01 in Talcher and 01 in Lara) , Ni-Cr Panel for DPT-02 Nos (01 in Talcher and 01 in Lara). Please refer price schedule

1 lot Delivery: 365 days
#32

Group-11- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

Group-11- Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

4 days Delivery: 365 days
#33

Group-11- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

Group-11- Total lump sum Price for site visit- should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

2 visit Delivery: 365 days
#34

Group-12-Pls refer item description and price schedule for details_Holiday Detector, Stethoscope, Vibration Meter, Comparator, Roughness Meter, Noise Meter, Torque Wrench etc

Group-12-Total lump sum Price for Hardness Tester-02 Nos (01 in Talcher and 01 in Lara), Exfoliation Meter for SS tubes-02 Nos (01 in Talcher and 01 in Lara), Thermography Camera-02 Nos (01 in Talcher and 01 in Lara), Holiday Detector-02 Nos (01 in Talcher and 01 in Lara), Engineering stethoscope-02 Nos (01 in Talcher and 01 in Lara), Portable vibration Meter-02 Nos (01 in Talcher and 01 in Lara), Comparator-02 Nos (01 in Talcher and 01 in Lara), Surface roughness Meter-02 Nos (01 in Talcher and 01 in Lara), Spirit Level-04 Nos (02 in Talcher and 02 in Lara), Noise Level Meter-02 Nos(01 in Talcher and 01 in Lara), Torgue wrench-02 Set (01 in Talcher and 01 in Lara), Pressure Gauge-04 Nos (02 in Talcher and 02 in Lara), Mercury Thermometer-04 Nos (02 in Talcher and 02 in Lara), Infrared Thermometer-02 Nos (01 in Talcher and 01 in Lara), Digital Thermometer _n-contact_-02 nos(01 in Talcher and 01 in Lara), Digital Thermometer Contact-Type-02 Nos(01 in Talcher and 01 in Lara),Thermocouple Test-4 Nos(02 in Talcher and 02 in Lara), Barometer -aneroid-08 Nos(04 in Talcher and 04 in Lara), Mameter-test and U tube-02 Nos (01 in Talcher and 01 in Lara),Hygrometer-02 Nos (01 in Talcher and 01 in Lara) along with all accessories

1 lot Delivery: 365 days
#35

Group-12- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-10 Days in Talcher and 10 Days in Lara

Group-12-Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-10 Days in Talcher and 10 Days in Lara

20 days Delivery: 365 days
#36

Group-12- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara

Group-12-Total lump sum Price for site visit - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara

4 visit Delivery: 365 days
#37

Group-13- Replica kit for in-situ Metallography-02 Nos, Sample preparation tools_machines-02 Set, In-situ Metallogrpahy kit-Grinder and polisher with accessories-02 set along with all accessories

Group-13-Total lump sum Price for Replica kit for in-situ Metallography-02 Nos (01 in Talcher and 01 in Lara), Sample preparation tools_machines-02 Set(01 in Talcher and 01 in Lara), In-situ Metallogrpahy kit-Grinder and polisher with accessories-02 set(01 in Talcher and 01 in Lara) along with all accessories

1 lot Delivery: 365 days
#38

Group-13- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-06 Days in Talcher and 06 Days in Lara

Group-13- Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-06 Days in Talcher and 06 Days in Lara

12 days Delivery: 365 days
#39

Group-13- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara

Group-13- Total lump sum Price for site visit- should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara

4 visit Delivery: 365 days
#40

Group-14- MCF_Magnetic Stauroscope_for assessment of quality of PWHT-02 Nos, Argon Purity tester-02 Nos, Inspector Kit for Welding Inspection-02 Nos,Temperature Gun-02 Nos along with all accessories

Group-14-Total lump sum Price for MCF_Magnetic Stauroscope_for assessment of quality of PWHT-02 Nos, Argon Purity tester-02 Nos(01 in Talcher and 01 in Lara), Inspector Kit for Welding Inspection-02 Nos(01 in Talcher and 01 in Lara),Temperature Gun-02 Nos(01 in Talcher and 01 in Lara) along with all accessories

1 lot Delivery: 365 days
#41

Group-14- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-04 Days in Talcher and 04 Days in Lara

Group-14- Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-04 Days in Talcher and 04 Days in Lara

8 days Delivery: 365 days
#42

Group-14- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara

Group-14- site visit -should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara

4 visit Delivery: 365 days
#43

Group-15- Binoculars-04 Nos, Laser alignment Kit with target kit-02 Nos, along with all accessories

Group-15-Total lump sum Price for Binoculars-04 Nos(02 in Talcher and 02 in Lara), Laser alignment Kit with target kit-02 Nos(01 in Talcher and 01 in Lara), along with all accessories

1 lot Delivery: 365 days
#44

Group-15- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

Group-15-Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

4 days Delivery: 365 days
#45

Group-15- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

Group-15- Total lump sum Price for site visit -should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

2 visit Delivery: 365 days
#46

Group-16- Remote Field Eddy current testing_Advance Electro magnetic testing-02 Nos, along with all accessories

Group-16-Total lump sum Price for Remote Field Eddy current testing_Advance Electro magnetic testing-02 Nos (01 in Talcher and 01 in Lara), along with all accessories

1 lot Delivery: 365 days
#47

Group-16- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

Group-16-Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

4 days Delivery: 365 days
#48

Group-16- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

Group-16-Total lump sum Price for site visit -should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

2 visit Delivery: 365 days
#49

Group-17- Helium Leak Detector-02 Nos along with all accessories

Group-17-Total lump sum Price for Helium Leak Detector-02 Nos(01 in Talcher and 01 in Lara) along with all accessories

1 lot Delivery: 365 days
#50

Group-17- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

Group-17-Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

4 days Delivery: 365 days
#51

Group-17- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

Group-17- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

2 visit Delivery: 365 days
#52

Group-18- Oxide Measurement for Boiler Tubes-02 Nos along with all accessories

Group-18-Total lump sum Price for Oxide Measurement for Boiler Tubes-02 Nos (01 in Talcher and 01 in Lara) along with all accessories

1 lot Delivery: 365 days
#53

Group-18- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

Group-18-Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

4 days Delivery: 365 days
#54

Group-18- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

Group-18-Total lump sum Price for site visit - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

2 visit Delivery: 365 days
#55

Group-19-Pls refer item discription_ UT Meter, Vernier, Outside _ Inside Micrometer 25_750 dial, Measuring Tape, Paint Thickness Meter, Paint Adhesion Kit, Internal Oxide Scale System

Group-19-Total lump sum Price for Ultrasonic Thickness meter_D-Meter-Digital-04 Nos (02 in Talcher and 02 in Lara), Vernier 300 mm Scale-04 Nos (02 in Talcher and 02 in Lara),Vernier 600 mm Scale-04 Nos (02 in Talcher and 02 in Lara), Outside Micrometre-04 Nos (02 in Talcher and 02 in Lara), Inside Micrometer 25-750_dial-04 Nos (02 in Talcher and 02 in Lara), Measuring Tape-04 Nos (02 in Talcher and 02 in Lara), Paint thickness Meter_Elcometer-Ultrasonic digital-02 Nos (01 in Talcher and 01 in Lara), Paint adhesion testing Kit-02 Nos(01 in Talcher and 01 in Lara),Internal oxide scale measuring system with Probe_UTbased-02 Nos(01 in Talcher and 01 in Lara) along with all accessories

1 lot Delivery: 365 days
#56

Group-19- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-04 Days in Talcher and 04 Days in Lara

Group-19- Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-04 Days in Talcher and 04 Days in Lara

8 days Delivery: 365 days
#57

Group-19- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

Group-19-Total lump sum Price for site visit- should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

2 visit Delivery: 365 days
#58

Group-20- Welding Simulator-02 Nos along with all accessories

Group-20-Total lump sum Price for Welding Simulator-02 Nos (01 in Talcher and 01 in Lara) along with all accessories

1 lot Delivery: 365 days
#59

Group-20- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

Group-20-Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

4 days Delivery: 365 days
#60

Group-20- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

Group-20-Total lump sum Price for site visit -should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

2 visit Delivery: 365 days

Corrigendum Updates

3 Updates
#1

Update

30-Dec-2025

Extended Deadline

02-Jan-2026, 4:00 pm

Opening Date

02-Jan-2026, 4:30 pm

#2

Update

24-Dec-2025

Extended Deadline

30-Dec-2025, 4:00 pm

Opening Date

30-Dec-2025, 4:30 pm

#3

Update

17-Dec-2025

Extended Deadline

24-Dec-2025, 4:00 pm

Opening Date

24-Dec-2025, 4:30 pm

Reverse Auction Schedule

Completed

Start

10-Mar-2026, 10:00 am

End

11-Mar-2026, 5:00 pm

Duration: 31 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
**********   Under PMA
-30-12-2025 12:58:36
2
**********   Under PMA
-30-12-2025 15:27:39
3
**********   Under PMA
-02-01-2026 12:36:30
4
**********   Under PMA
-02-01-2026 15:30:42
5
**********   Under PMA
-16-12-2025 18:29:33
6
**********   Under PMA
-15-12-2025 18:23:17
7
**********   Under PMA
-17-12-2025 13:19:12
8
**********   Under PMA
-02-01-2026 15:53:48
9
**********   Under PMA
-23-12-2025 17:11:57
10
**********   Under PMA
-24-12-2025 12:15:39
11
**********   Under PMA
-16-12-2025 16:08:11
12
**********   Under PMA
-31-12-2025 22:46:56
13
**********   Under PMA
-17-12-2025 10:51:08
14
**********   Under PMA
-24-12-2025 12:22:49
15
**********   Under PMA
-23-12-2025 17:26:37
16
**********   Under PMA
-30-12-2025 15:31:35
17
**********   Under PMA
-16-12-2025 21:37:06
18
**********   Under PMA
-24-12-2025 00:07:22
19
**********   Under PMA
-02-01-2026 15:04:31
20
**********   Under PMA
-13-12-2025 19:52:35

Contract / Result Documents 8

Please sign in or create an account to view contract details and download result documents.