TenderDekho Logo
Active GEM

Bokaro Steel Plant SAIL procurement of COUPLING and HSM components, Jharkhand 2026

Bid Publish Date

11-Aug-2026, 5:44 pm

Bid End Date

07-Sep-2026, 6:00 pm

Generate Docs

Progress

Issue11-Aug-2026, 5:44 pm
Corrigendum31-Aug-2026
AwardPending

Tender Overview

Bokaro Steel Plant, under the Steel Authority of India Limited, invites procurement for multiple mechanical components including COUPLING F_LOOPER OUTPUT SHAFT, COUPLING F_LOOPER MOTOR SHAFT, TABLE,TRANSFER, DWN-HSM_8386, HINGED PLATE FOR FINISHING, ROCKER BALANCE BEAM, and E2 BOTTOM ANVIL ASSEMBLY in BOKARO, JHARKHAND. The BOQ lists 6 items with no explicit quantity values or unit details. The estimated contract value and EMD are not disclosed. The tender emphasizes compliance with plant drawings and a data sheet upload. Only registered SAIL/BSL vendors may participate, with prior vendor registration via sailtenders portal. GST considerations will follow applicable rates or the tenderer’s quoted rate, with GST reimbursement up to statutory limits. This bid requires adherence to technical drawings and data sheets, ensuring conformity with offered specifications as validated by the buyer. The unique registration and pre-qualification constraint shapes the bidding strategy and supplier eligibility, while the data sheet alignment minimizes technical mismatch risk. The opportunity targets established supplier bases and focuses on commodity-like mechanical assemblies for the Bokaro steel complex.

Technical Specifications & Requirements

  • Product names from the title/BOQ: COUPLING F_LOOPER OUTPUT SHAFT, COUPLING F_LOOPER MOTOR SHAFT, TABLE, TRANSFER, DWN-HSM_8386, HINGED PLATE FOR FINISHING, DWN-HSM-6212 (and related components)
  • Data Sheet upload required with bid; data must match offered parameters
  • Drawings conformity: bid should align with technical drawings; mismatch may lead to rejection
  • Vendor eligibility: only SAIL/BSL registered vendors may participate; registration via the sailtenders portal
  • GST handling: GST to be paid/reimbursed as per actuals or applicable rates; reference to GST portal screenshots for compliance
  • No explicit quantities in the BOQ; bidders should prepare for potential 6-item scope; verify with drawings
  • Documents: mandatory certificates and data sheets as per bid documents; non-submission risks rejection

Terms, Conditions & Eligibility

  • GST responsibility rests with bidder; reimbursement up to applicable rates, subject to quoted GST
  • Data Sheet upload mandatory; ensures data-sheet vs specifications alignment
  • Contract termination grounds include non-delivery within stipulated period or defaulted performance
  • GST invoice & GST payment proof must be uploaded on GeM portal
  • Certificates required; missing certificates may lead to rejection
  • Vendor registration through the official portal; only registered vendors’ offers will be considered

Key Specifications

  • COUPLING F_LOOPER OUTPUT SHAFT

  • COUPLING F_LOOPER MOTOR SHAFT

  • TABLE,TRANSFER,DWN-HSM_8386

  • HINGED PLATE FOR FINISHING,DWN-HSM-6212

  • ROCKER BALANCE BEAM,DWN-HSM-9857

  • E2 BOTTOM ANVIL ASSEMBLY,064.297.0941.006

Terms & Conditions

  • GST as per actuals or applicable rates with cap

  • Data Sheet upload mandatory; drawings alignment

  • SAIL/BSL registered vendor only; portal registration required

  • Delivery timeline and penalties: defined in ATC

  • GST invoice and GST portal screenshots required

Important Clauses

Payment Terms

GST payable per actuals or applicable rates; reimbursement as per statutory cap; invoice must include GST details and be uploaded with GeM submission

Delivery Schedule

Delivery period to be specified in ATC; non-delivery or delayed delivery may trigger contract termination

Penalties/Liquidated Damages

Penalties implied by contract terms; non-delivery or defective material replacement obligations may attract LDs

Bidder Eligibility

  • SAIL/BSL registered vendor status

  • Submit Data Sheet aligned to product specifications

  • GST compliance and proper invoicing

Tender Data

Bid Details

Quantity

10

Category

COUPLING F_LOOPER OUTPUT SHAFT,HSM-6785

Bid Type

Two Packet Bid

Bid Validity

160 (Days)

Bid Type

Service

Evaluation

Item wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

COUPLING F_LOOPER OUTPUT SHAFT,HSM-6785 , COUPLING F_LOOPER MOTOR SHAFT,HSM-6787 , TABLE,TRANSFER,DWN-HSM_8386 , HINGED PLATE FOR FINISHING,DWN-HSM-6212 , ROCKER BALANCE BEAM,DWN- HSM-9857 , E2 BOTTOM ANVIL ASSLY,064.297.0941.006

Payment Timelines

Payments shall be made to the Seller within 20 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

150

Delivery Locations

1

Delivery Cities

Bokaro

Delivery Pincodes

827001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Kunal Kumar827001,DGM(Stores), Stores Department, Steel Gate, Gate No.-9, Bokaro Steel Plant, Bokaro Steel City-827001, JharkhandBokaroJharkhand8270012150-

Authority Records

MINISTRY OF STEELSTEEL AUTHORITY OF INDIA LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9629010.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Bokaro Steel Plant

Office Name

Bslp61

Grievance Contact

[email protected]

Corrigendum Updates

5 Updates
#1

Update

31-Aug-2026
#2

Update

31-Aug-2026
#3

Update

31-Aug-2026

Extended Deadline

07-Sep-2026, 12:30 pm

Opening Date

07-Sep-2026, 1:00 pm

#4

Update

23-Aug-2026
#5

Update

22-Aug-2026

Extended Deadline

31-Aug-2026, 1:30 pm

Opening Date

31-Aug-2026, 2:00 pm

Bill of Quantities (BOQ) 6 Items Sign in for GEM prices

#10

COUPLING F_LOOPER OUTPUT SHAFT,HSM-6785

COUPLING F_LOOPER OUTPUT SHAFT,HSM-6785 AS PER ATTACHED SPECIFICATION DOCUMENT

2 ea Delivery: 150 days
#20

COUPLING F_LOOPER MOTOR SHAFT,HSM-6787

COUPLING F_LOOPER MOTOR SHAFT,HSM-6787 AS PER ATTACHED SPECIFICATION DOCUMENT

2 ea Delivery: 150 days
#30

TABLE,TRANSFER,DWN-HSM_8386

TABLE,TRANSFER,DWN-HSM_8386 AS PER ATTACHED SPECIFICATION DOCUMENT

2 ea Delivery: 150 days
#40

HINGED PLATE FOR FINISHING,DWN-HSM-6212

HINGED PLATE FOR FINISHING,DWN-HSM-6212 AS PER ATTACHED SPECIFICATION DOCUMENT

2 ea Delivery: 150 days
#50

ROCKER BALANCE BEAM,DWN-HSM-9857

ROCKER BALANCE BEAM,DWN-HSM-9857 AS PER ATTACHED SPECIFICATION DOCUMENT

1 ea Delivery: 150 days
#60

E2 BOTTOM ANVIL ASSLY,064.297.0941.006

E2 BOTTOM ANVIL ASSLY,064.297.0941.006 AS PER ATTACHED SPECIFICATION DOCUMENT

1 ea Delivery: 150 days

Categories 9

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST certificate

2

PAN card

3

Data Sheet of offered products

4

Experience certificates (if required by ATC)

5

Financial statements (as applicable)

6

EMD/Security deposit documents (as applicable)

7

OEM authorization certificates (if required)

Frequently Asked Questions

Key insights about JHARKHAND tender market

How to bid for Bokaro Steel Plant procurement in Jharkhand 2026

Bidders must be registered SAIL/BSL vendors and submit the Data Sheet with the bid. Provide GST details and GST invoice example, align technical datasheets with drawings, and ensure conformity to the listed item names (COUPLING F_LOOPER, TABLE TRANSFER, DWN-HSM items). Registration via sailtenders.co.in precedes bid submission.

What documents are required for SAIL Bokaro tender participation

Required documents include GST certificate, PAN card, Data Sheet of offered products, experience certificates if applicable, financial statements, and OEM authorizations where required. Ensure GeM portal uploads reflect GST invoices and payment proof per ATC terms.

What are the technical specifications for the listed Bokaro items

Technical specs rely on supplier Data Sheets and plant drawings; ensure the Data Sheet matches offered parameters and that items named in the BOQ (COUPLING F_LOOPER outputs and shafts, DWN-HSM components) comply with drawings and OEM requirements as per ATC.

When is the delivery deadline for Bokaro procurement

Delivery timelines are defined within the ATC clause of the bid. Failure to meet the stipulated delivery period may lead to contract termination and potential liquidated damages; bidders should confirm exact dates during bid submission.

How is GST handled for Bokaro Steel Plant tender in 2026

GST is payable by the bidder and reimbursed to the extent of actuals or the prevailing rates, capped at the quoted GST percentage. Upload GST invoice scans and GST portal payment screenshots within the bid submission.

What is required for vendor registration with SAIL/BSL

Bidder must register on sailtenders.co.in. Only registered vendors will have eligible offers considered; registration is a prerequisite for future purchase enquiries and TBM processing.

What happens if data sheet does not match drawings for Bokaro items

Mismatches between Data Sheet and drawings can lead to bid rejection. Ensure all parameters, tolerances, and material specs on the Data Sheet align exactly with the plant drawings and ATC requirements.