Loading Trolley
Hindustan Aeronautics Limited (hal)
BANGALORE, KARNATAKA
Bid Publish Date
02-Jun-2026, 9:01 am
Bid End Date
12-Jun-2026, 9:00 am
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
Bharat Dynamics Limited, operating under the Department of Defence Production, seeks Battery Loading / Unloading Trolleys. The procurement includes production, fitment, and assembly as per drawings attached, with raw material procurement in scope for the vendor. A 01-month delivery window from PO receipt is mandated, with inspection by BDL-QC. The contract requires a 2-year warranty from acceptance at BDL VU and a 5% PBG valid through the warranty + 3-month claim period. Payment terms specify 95% basic + 100% taxes within 30 days after receipt and acceptance, with the remaining 5% upon PBG submission. Unique color/finish specified: yellow paint with zinc oxide primer and enamel coating. Vendor must declare any recent demerger status. This section highlights the need for strict delivery timelines, compliance with attached drawings, and adherence to GST-based reimbursements as per actuals.
Product: Battery Loading / Unloading Trolley
Delivery: within 01 month from PO receipt
Warranty: 2 years from acceptance at BDL VU
Payment: 95% basic + 100% taxes in 30 days, balance 5% after PBG
PBG: 5% of contract value, valid through warranty + 3 months claim period
Finish: yellow paint with primer zinc oxide and enamel coating
Inspection: BDL-QC inspection per drawings attached in ATC
Drawings: attached; compliance with these drawings mandatory
Payment terms include a 30-day acceptance window and a 5% PBG
Delivery must occur within 1 month; LD for delays is 0.5% weekly
2-year warranty with free repair/replacement during warranty period
95% basic + 100% taxes within 30 days after receipt and acceptance; remaining 5% upon PBG submission
Items to be delivered within 01 month from receipt of BDL PO; LD applies for delays at 0.5% per week
LD at 0.5% of the price for each week of delay; applies to stores including duties and taxes
Registration and vendor code creation as per ATC
Compliance with GST and PAN documentation
Ability to produce drawings and meet production/assembly scope
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Battery Loading / Unloading Trolley
Trusted by 5,000+ companies to find, track, and win government tenders.
Our team will walk you through the platform and help set up your profile — free, no commitment.
Our team will reach out to schedule your free session.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Hindustan Aeronautics Limited (hal)
BANGALORE, KARNATAKA
Indian Air Force
GORAKHPUR, UTTAR PRADESH
Indian Air Force
Bharat Electronics Limited (bel)
KRISHNA, ANDHRA PRADESH
National Aluminium Company Limited, Bhubaneswar
KORAPUT, ODISHA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT mandate certified by bank
Vendor code creation documents
Compliance statement attesting acceptance of attached drawings and all terms
Any OEM authorization or technical compliance certificates if applicable
Tax/GST related documents as per GST law
Bidders must submit PAN, GSTIN, cancelled cheque, EFT mandate, and vendor code creation documents. Compliance with attached drawings is mandatory, and inspection is by BDL-QC. Ensure 95% payment within 30 days after acceptance and 5% on PBG submission. Include a 5% PBG valid through warranty plus 3 months claim period.
Required documents include PAN card copy, GSTIN copy, cancelled cheque, EFT mandate certified by bank, compliance statement for attached specifications, vendor code creation documents, and any OEM authorizations if applicable. GST handling follows actuals or applicable rates per GST law.
Delivery must occur within 01 month from PO receipt. Warranty extends 2 years from acceptance at BDL VU, with free repair or replacement for defective unit or parts during the warranty. A performance bank guarantee of 5% is required and remains valid through warranty and 3-month claim period.
Payment is 95% of basic price plus 100% taxes within 30 days after receipt and acceptance of the item, with the remaining 5% paid after submission of the PBG. PBG must be valid through warranty plus a 3-month claim period.
The trolley must be yellow painted, with primer coating of zinc oxide and enamel finish as specified. Compliance with the ATC drawings is required, and surface finish should align with attached specifications for durability.
Inspection is conducted by BDL-QC. Ensure drawings attached in ATC are strictly followed during manufacturing, fitment, and assembly. Vendors must supply raw materials within scope and adhere to the approved drawings for acceptance.
Vendors must declare any recent demerger or restructuring. Failure to disclose could lead to credential debarment by BDL. Ensure transparency about merger status during submission to avoid disqualification.
Pendencies incur Liquidated Damages of 0.5% of the store value per week, including duties and taxes, until delivery is completed. This emphasizes timely delivery aligned with the 01 month schedule.
Indian Air Force
📍 SOUTH ANDAMAN, ANDAMAN & NICOBAR
Indian Air Force
📍 CHANDIGARH, CHANDIGARH
Indian Air Force
📍 GHAZIABAD, UTTAR PRADESH
Indian Air Force
📍 CHANDIGARH, CHANDIGARH
National Fertilizers Limited (nfl)
📍 RUPNAGAR, PUNJAB
Sign up now to access all documents
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS