Progress
Armoured Vehicles Nigam Limited invites a limited GEM tender for the supply of goods under the Defence Production umbrella. The tender enforces a vendor sign and stamp on the Technical Compliance Sheet and permits a 50% quantity adjustment at the time of contract award and during currency. Packing and marking requirements ensure traceability, while post-receipt inspection by CGM or authorized representatives governs acceptance. This opportunity is restricted to pre-qualified vendors and emphasizes strict adherence to submission protocols, with GST considerations clarified to bidders. The scope is limited to goods supply, with an emphasis on proper packaging to mitigate transit damages. The process cautions against last-m moment dispensaries and mandates timely bid submission.
Scope: supply of Goods (no BOQ items published)
Packing: must prevent damages during transit and storage
Marking: NAME OF FIRM, S.O NO., GEMC NO.
Inspection: Post Receipt Inspection at consignee site by CGM or authorized representatives
Pre-dispatch inspection: Not Applicable
ATC requirement: mandatory submission of Technical Compliance Sheet
EMD: Not specified in data; GST handling as per bidder responsibility
Delivery: 50% quantity option; delivery period tied to original delivery period with minimum 30 days
Inspection: CGM-authorized post-receipt inspection; no pre-dispatch inspection
GST payable by bidder; reimbursement capped at actuals or applicable rate; no explicit EMD details provided in data
Option to increase/decrease quantity up to 50% at contract time or during currency; delivery period adjustments calculated with minimum 30 days
Not specified in provided data; standard GEM terms may apply; ensure compliance with TOD and no manual extension
Limited vendor eligibility under the tender enquiry
Must submit signed Technical Compliance Sheet with stamp
Compliance with GST and vendor documentation for EFT and banking
Quantity
151
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
Yes
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Arbitration Clause
Yes (Arbitration clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
PLATE TO DRG. NO. 675-50-279, ALTERNATIVE MATERIAL: PEC-II
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
180
Delivery Locations
1
Delivery Cities
Medak
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Medak | Medak | - | - | 151 | 180 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate certified by Bank
Technical Compliance Sheet with signature and stamp
Vendor Code Creation documents
Key insights about TELANGANA tender market
Bidders must be pre-qualified as per the limited tender scope and submit the signed Technical Compliance Sheet. Include PAN, GSTIN, cancelled cheque, EFT Mandate, and vendor code documents. Ensure packing, marking, and GST handling align with the tender terms to avoid rejection.
Required documents include PAN Card, GSTIN, Cancelled Cheque, and EFT Mandate certified by the bank. A signed Technical Compliance Sheet with firm stamp is mandatory for evaluation; missing documents may lead to disqualification.
The purchaser may increase or decrease quantity up to 50% of bid quantity at contract placement and during currency. Delivery periods adjust based on the extended quantity using a formula with a minimum 30 days, ensuring a structured schedule.
Contractor must ensure proper packing to prevent transit/storage damages. Marking must include NAME OF THE FIRM, S.O NO., and GEMC NO. These markings facilitate traceability and acceptance at post-delivery inspection.
Post-receipt inspection will be conducted by the CGM or an authorized representative at the consignee site. Pre-dispatch inspection is not applicable, reducing upfront verification but increasing emphasis on delivery quality and acceptance testing.
GST is bidder-borne with reimbursement as actuals or applicable rate, whichever is lower, subject to the quoted GST percentage. Bidders must determine their GST implications and reflect accurate GST in their bids.
Bidders must sign and stamp the Technical Compliance Sheet; non-compliance leads to rejection. The ATC clauses require strict adherence to provided technical criteria, with post-award checks during acceptance testing.
Delivery timelines hinge on the original delivery period, with potential extensions for increased quantity. Acceptance occurs via post-receipt inspection at the consignee site by CGM or authorized representatives, and delays may affect payment scheduling.