Supply and Installation of 6 Core Single Mode armoured OFC Cable,Supply and Installation of 3 Core
Hindustan Petroleum Corporation Ltd
KHORDHA, ODISHA
Progress
RAQuantity
47572
Bid Type
Two Packet Bid
Hpcl Rajasthan Refinery Limited invites bids for Installation of Pressure Gauge in CS, Installation of Pressure Gauge in AS, Installation of Pressure Transmit in CS, Installation of Pressure Transmit in AS, Installation of Flow Transmit in CS, Installation of Flow Transmit in AS, Installation of Level Transmit in CS, Installation of Level Gauges in CS, Installation of Thermocouple, Installation of Temp Indicators, Installation of Temp Transmitters, Intalllation of 2 Inch Yoke Supports, Intalllation of 3 Inch Yoke Supports, Supply and inst of SS tag plates, Stenciling of 1 Inch letter, Stenciling of 2 Inch letter, loop checking for PT, loop checking for FT, loop checking for TT, loop checking for LT, loop checking for CV, Installation of Junction Box, Laying of 1 pair cable, Laying of 12 pair cable, Laying of power cable, Laying and term of earthing cable, Laying of Fiber optics cable, Termination of Optical fiber cable, Erection of FRP duct 1200 mm W, Erection of FRP duct 400 mm W, Erection of FRP trays 300 mm W, Erection of FRP trays 150 mm W, Erection of FRP trays 60 mm W, Erection of canopies for Transmitters, Tubing hookup for CV or positioner, Installation of Air manifold, Fab Erection of SS air lines, Deployment of Electrician, Deployment of Technician, Deployment of Fitter, Deployment of helper, Instrument calibration, Monthly Mobilisation, Arranging Forklift, Arranging Truck or Dumper in BARMER, RAJASTHAN. Quantity: 47572. Submission Deadline: 09-05-2025 13: 00: 00. Submit your proposal before the deadline.
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Hindustan Petroleum Corporation Ltd
KHORDHA, ODISHA
Indian Navy
UTTARA KANNADA, KARNATAKA
Indian Army
HARIDWAR, UTTARAKHAND
Hindustan Petroleum Corporation Ltd
SONIPAT, HARYANA
Directorate Of Advertising And Visual Publicity (davp)
NEW DELHI, DELHI
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Installation of Pressure Gauge in CS | Installation of Pressure Gauge in CS as per SLA. For more details refer SLA. | 20 | each | bhavesh.hrrl | 545 |
| 2 | Installation of Pressure Gauge in AS | Installation of Pressure Gauge in AS as per SLA. For more details refer SLA. | 20 | each | bhavesh.hrrl | 545 |
| 3 | Installation of Pressure Transmit in CS | Installation of Pressure Transmit in CS as per SLA. For more details refer SLA. | 40 | each | bhavesh.hrrl | 545 |
| 4 | Installation of Pressure Transmit in AS | Installation of Pressure Transmit in AS as per SLA. For more details refer SLA. | 40 | each | bhavesh.hrrl | 545 |
| 5 | Installation of Flow Transmit in CS | Installation of Flow Transmit in CS as per SLA. For more details refer SLA. | 50 | each | bhavesh.hrrl | 545 |
| 6 | Installation of Flow Transmit in AS | Installation of Flow Transmit in AS as per SLA. For more details refer SLA. | 50 | each | bhavesh.hrrl | 545 |
| 7 | Installation of Level Transmit in CS | Installation of Level Transmit in CS as per SLA. For more details refer SLA. | 5 | each | bhavesh.hrrl | 545 |
| 8 | Installation of Level Gauges in CS | Installation of Level Gauges in CS as per SLA. For more details refer SLA. | 5 | each | bhavesh.hrrl | 545 |
| 9 | Installation of Thermocouple | Installation of Thermocouple as per SLA. For more details refer SLA. | 10 | each | bhavesh.hrrl | 545 |
| 10 | Installation of Temp Indicators | Installation of Temp Indicators as per SLA. For more details refer SLA. | 20 | each | bhavesh.hrrl | 545 |
| 11 | Installation of Temp Transmitters | Installation of Temp Transmitters as per SLA. For more details refer SLA. | 40 | each | bhavesh.hrrl | 545 |
| 12 | Intalllation of 2 Inch Yoke Supports | Intalllation of 2 Inch Yoke Supports as per SLA. For more details refer SLA. | 80 | each | bhavesh.hrrl | 545 |
| 13 | Intalllation of 3 Inch Yoke Supports | Intalllation of 3 Inch Yoke Supports as per SLA. For more details refer SLA. | 80 | each | bhavesh.hrrl | 545 |
| 14 | Supply and inst of SS tag plates | Supply and inst of SS tag plates as per SLA. For more details refer SLA. | 500 | each | bhavesh.hrrl | 545 |
| 15 | Stenciling of 1 Inch letter | Stenciling of 1 Inch letter as per SLA. For more details refer SLA. | 10,000 | each | bhavesh.hrrl | 545 |
| 16 | Stenciling of 2 Inch letter | Stenciling of 2 Inch letter as per SLA. For more details refer SLA. | 10,000 | each | bhavesh.hrrl | 545 |
| 17 | loop checking for PT | loop checking for PT as per SLA. For more details refer SLA. | 50 | each | bhavesh.hrrl | 545 |
| 18 | loop checking for FT | loop checking for FT as per SLA. For more details refer SLA. | 50 | each | bhavesh.hrrl | 545 |
| 19 | loop checking for TT | loop checking for TT as per SLA. For more details refer SLA. | 50 | each | bhavesh.hrrl | 545 |
| 20 | loop checking for LT | loop checking for LT as per SLA. For more details refer SLA. | 10 | each | bhavesh.hrrl | 545 |
| 21 | loop checking for CV | loop checking for CV as per SLA. For more details refer SLA. | 50 | each | bhavesh.hrrl | 545 |
| 22 | Installation of Junction Box | installation of Junction Box as per SLA. For more details refer SLA. | 30 | each | bhavesh.hrrl | 545 |
| 23 | Laying of 1 pair cable | Laying of 1 pair cable as per SLA. For more details refer SLA. | 5,200 | meters | bhavesh.hrrl | 545 |
| 24 | Laying of 12 pair cable | Laying of 12 pair cable as per SLA. For more details refer SLA. | 13,300 | meters | bhavesh.hrrl | 545 |
| 25 | Laying of power cable | Laying of power cable as per SLA. For more details refer SLA. | 200 | meters | bhavesh.hrrl | 545 |
| 26 | Laying and term of earthing cable | Laying and term of earthing cable as per SLA. For more details refer SLA. | 50 | meters | bhavesh.hrrl | 545 |
| 27 | Laying of Fiber optics cable | Laying of Fiber optics cable as per SLA. For more details refer SLA. | 1,200 | meters | bhavesh.hrrl | 545 |
| 28 | Termination of Optical fiber cable | Termination of Optical fiber cable as per SLA. For more details refer SLA. | 24 | each | bhavesh.hrrl | 545 |
| 29 | Erection of FRP duct 1200 mm W | Erection of FRP duct 1200 mm W as per SLA. For more details refer SLA. | 80 | meters | bhavesh.hrrl | 545 |
| 30 | Erection of FRP duct 400 mm W | Erection of FRP duct 400 mm W as per SLA. For more details refer SLA. | 160 | meters | bhavesh.hrrl | 545 |
| 31 | Erection of FRP trays 300 mm W | Erection of FRP trays 300 mm W as per SLA. For more details refer SLA. | 2,000 | meters | bhavesh.hrrl | 545 |
| 32 | Erection of FRP trays 150 mm W | Erection of FRP trays 150 mm W as per SLA. For more details refer SLA. | 1,000 | meters | bhavesh.hrrl | 545 |
| 33 | Erection of FRP trays 60 mm W | Erection of FRP trays 60 mm W as per SLA. For more details refer SLA. | 1,500 | meters | bhavesh.hrrl | 545 |
| 34 | Erection of canopies for Transmitters | Erection of canopies for Transmitters as per SLA. For more details refer SLA. | 200 | each | bhavesh.hrrl | 545 |
| 35 | Tubing hookup for CV or positioner | Tubing hookup for CV or positioner as per SLA. For more details refer SLA. | 30 | each | bhavesh.hrrl | 545 |
| 36 | Installation of Air manifold | Installation of Air manifold as per SLA. For more details refer SLA. | 10 | each | bhavesh.hrrl | 545 |
| 37 | Fab Erection of SS air lines | Fab Erection of SS air lines as per SLA. For more details refer SLA. | 500 | meters | bhavesh.hrrl | 545 |
| 38 | Deployment of Electrician | Deployment of Electrician as per SLA. For more details refer SLA. | 150 | man days | bhavesh.hrrl | 545 |
| 39 | Deployment of Technician | Deployment of Technician as per SLA. For more details refer SLA. | 150 | man days | bhavesh.hrrl | 545 |
| 40 | Deployment of Fitter | Deployment of Fitter as per SLA. For more details refer SLA. | 100 | man days | bhavesh.hrrl | 545 |
| 41 | Deployment of helper | Deployment of helper as per SLA. For more details refer SLA. | 200 | man days | bhavesh.hrrl | 545 |
| 42 | Instrument calibration | Instrument calibration as per SLA. For more details refer SLA. | 200 | each | bhavesh.hrrl | 545 |
| 43 | Monthly Mobilisation | Monthly Mobilisation as per SLA. For more details refer SLA. | 18 | each | bhavesh.hrrl | 545 |
| 44 | Arranging Forklift | Arranging Forklift as per SLA. For more details refer SLA. | 80 | hours | bhavesh.hrrl | 545 |
| 45 | Arranging Truck or Dumper | Arranging Truck or Dumper as per SLA. For more details refer SLA. | 20 | shift hours | bhavesh.hrrl | 545 |
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Start
24-May-2025, 8:00 pm
End
26-May-2025, 8:00 pm
Duration: 48 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | KRITI CONSTRUCTION COMPANY Under PMA | - | 09-05-2025 12:55:34 | Disqualified |
| 2 | RKG INSTRUMENTATION PRIVATE LIMITED Under PMA | - | 08-05-2025 11:29:11 | Qualified |
| 3 | TELECON SYSTEMS LIMITED Under PMA | - | 07-05-2025 16:37:08 | Qualified |
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | TELECON SYSTEMS LIMITED(MSE,MII) Under PMA Winner | ₹1,78,46,864 | Item Categories : Installation of Pressure Gauge in CS,Installation of Pressure Gauge in AS,Installation of Pressure |
| L2 | RKG INSTRUMENTATION PRIVATE LIMITED (MSE,MII) Under PMA | ₹1,78,64,964 | Item Categories : Installation of Pressure Gauge in CS,Installation of Pressure Gauge in AS,Installation of Pressure |
🎉 L1 Winner
TELECON SYSTEMS LIMITED(MSE,MII) Under PMA
Final Price: ₹1,78,46,864
Please sign in or create an account to view contract details and download result documents.
Key insights about RAJASTHAN tender market
The eligibility requirements include being a registered entity capable of executing similar instrumentation projects, possessing adequate technical expertise, and having a skilled workforce available for the services required. Financial documentation demonstrating the bidder's ability to manage the required quantity of 47,572 units is also necessary.
Bidders must present relevant certifications that demonstrate compliance with quality and safety standards in instrumentation services. This includes technical certifications for installation practices, calibration processes, and adherence to industry specifications.
To participate, bidders must register on the designated electronic platform listed in the tender documents. The registration process involves creating an account, completing vendor profiles, and uploading necessary documents such as certificates and financial statements.
Payment terms will generally be outlined in the contract agreement post-award. Bidders are expected to detail their payment schedules, including milestones and conditions for payment based on service completion and delivery.
Yes, the tender actively encourages participation from Micro, Small, and Medium Enterprises (MSEs) and includes specific provisions to support startups. This is in alignment with national policies aimed at promoting local entrepreneurship through enhanced opportunities in public procurement.
Sign up now to access all documents
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS