TenderDekho Logo
GEM

Open Tender for Installation of Pressure Gauge in CS,Installation of Pressure Gauge in AS,Installation of Pressure in BARMER, RAJASTHAN

Bid Publish Date

18-Apr-2025, 12:23 pm

Bid End Date

09-May-2025, 1:00 pm

EMD

₹3,45,000

Progress

RA
Issue18-Apr-2025, 12:23 pm
Reverse AuctionCompleted
Award07-Jun-2025, 8:12 am
Explore all 5 tabs to view complete tender details

Quantity

47572

Bid Type

Two Packet Bid

Categories 87

BP INSTRUMENT VOLTMETER SKILLED MANPOWER SOLAR CELLS CABLE TERMINAL PLATFORM SCALE UG CABLE DECIBEL METER OCEAN ENGINEERING OPTICAL FIBRE CABLE PVC CABLE SHIELDED CABLE GLUCOMETER ARCHERY BOW STRINGS SKILLED PERSONNEL LABORATORY PRESSES PARAMETER TEST CABLE LAYING PRESSURE GAUGE TESTING INSTRUMENT VISCO AMYLOGRAPH WEIGH BRIDGE POWER WIRE POWER CABLE THERMOWELLS CABBING EQUIPMENTS PRESSURE REGULATOR SOLAR PHOTOVOLTAIC MODULE TUBE THERMOCOUPLES DECORATION BOX WIRING ASSEMBLY WATER LEVEL RECORDER WIRING SPECIFICATION POSITIONER PRESSURE MEASURING AND CONTROL INSTRUMENTS HEAT MEASURING INSTRUMENTS SOLAR PV PROJECT BODYWEIGHT MEASURING SCALE RADIO FREQUENCY ANALYSER ENT SET HOT AIR BOILER AIR REGULATORS WELL TESTING EQUIPMENTS ROUTINE MAINTENANCE SOLAR PHOTOVOLTAIC SYSTEM SMART POSITIONER LIFTING EQUIPMENT TUBES AND PIPES XLPE CABLE HEATING EQUIPMENT SPARES ANAESTHESIA MACHINE COMPLETION EQUIPMENTS LIGHTENING PROTECTION DEVICE BARE CABLE WATTMETERS RF CABLE AMC OF ELECTRONIC CABLE PROGRAMMABLE CRUCIBLE FURNACES PYROMETERS ARTICULATING LAZY ARMS BLOOD PRESSURE MEASURING INSTRUMENT ACCESSORIES ELECTRICAL BOXES ELECTRICAL SUBSTATION FIRE BREATHING APPARATUS THICKNESS GAUGE GAUGE MAINTENANCE CONTRACT OF ELECTRONIC INDICATING AND RECORDING INSTRUMENTS CABLING POWER PRESSURE INDICATORS STETHOSCOPE MATERIAL TRANSPORT VEHICLES PEB PROGRAMMABLE BOX FURNACES BOYLES APPARATUS MEDICAL DIAGNOSTIC GAMMA CAMERAS PNEUMATIC POSITIONER THERMOMETER WEIGHTS DUMPER AUDIOMETERS COILED CABLE LOCAL AREA NETWORK CABLING

Hpcl Rajasthan Refinery Limited invites bids for Installation of Pressure Gauge in CS, Installation of Pressure Gauge in AS, Installation of Pressure Transmit in CS, Installation of Pressure Transmit in AS, Installation of Flow Transmit in CS, Installation of Flow Transmit in AS, Installation of Level Transmit in CS, Installation of Level Gauges in CS, Installation of Thermocouple, Installation of Temp Indicators, Installation of Temp Transmitters, Intalllation of 2 Inch Yoke Supports, Intalllation of 3 Inch Yoke Supports, Supply and inst of SS tag plates, Stenciling of 1 Inch letter, Stenciling of 2 Inch letter, loop checking for PT, loop checking for FT, loop checking for TT, loop checking for LT, loop checking for CV, Installation of Junction Box, Laying of 1 pair cable, Laying of 12 pair cable, Laying of power cable, Laying and term of earthing cable, Laying of Fiber optics cable, Termination of Optical fiber cable, Erection of FRP duct 1200 mm W, Erection of FRP duct 400 mm W, Erection of FRP trays 300 mm W, Erection of FRP trays 150 mm W, Erection of FRP trays 60 mm W, Erection of canopies for Transmitters, Tubing hookup for CV or positioner, Installation of Air manifold, Fab Erection of SS air lines, Deployment of Electrician, Deployment of Technician, Deployment of Fitter, Deployment of helper, Instrument calibration, Monthly Mobilisation, Arranging Forklift, Arranging Truck or Dumper in BARMER, RAJASTHAN. Quantity: 47572. Submission Deadline: 09-05-2025 13: 00: 00. Submit your proposal before the deadline.

Documents 5

GeM-Bidding-7750366.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Supply and Installation of 6 Core Single Mode armoured OFC Cable,Supply and Installation of 3 Core

Hindustan Petroleum Corporation Ltd

KHORDHA, ODISHA

Posted: 8 May 2025
Closed: 19 May 2025
GEM

Supply and installation of light interface unit,Supply and installation of motorized IP-based proje

Indian Navy

UTTARA KANNADA, KARNATAKA

Posted: 23 June 2025
Closed: 4 August 2025
GEM

Supply and installation 4MP IP Network TDN Low Light IR Rugged Bullet Camera 2 point 8 mm fixed len

Indian Army

HARIDWAR, UTTARAKHAND

Posted: 28 June 2025
Closed: 8 July 2025
GEM

Supply and installtion of 1 and half inch CS Pipe,Supply and installtion of 2 inch CS Pipe,Inst. of

Hindustan Petroleum Corporation Ltd

SONIPAT, HARYANA

Posted: 31 May 2025
Closed: 11 June 2025
GEM

Installation Testing and Commissioning of SWITCH 24 POE GIGA 100 1000,Installation Testing and Comm

Directorate Of Advertising And Visual Publicity (davp)

NEW DELHI, DELHI

Posted: 9 January 2025
Closed: 31 January 2025
GEM

Bill of Quantities (BOQ) 45 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 Installation of Pressure Gauge in CS Installation of Pressure Gauge in CS as per SLA. For more details refer SLA. 20 each bhavesh.hrrl 545
2 Installation of Pressure Gauge in AS Installation of Pressure Gauge in AS as per SLA. For more details refer SLA. 20 each bhavesh.hrrl 545
3 Installation of Pressure Transmit in CS Installation of Pressure Transmit in CS as per SLA. For more details refer SLA. 40 each bhavesh.hrrl 545
4 Installation of Pressure Transmit in AS Installation of Pressure Transmit in AS as per SLA. For more details refer SLA. 40 each bhavesh.hrrl 545
5 Installation of Flow Transmit in CS Installation of Flow Transmit in CS as per SLA. For more details refer SLA. 50 each bhavesh.hrrl 545
6 Installation of Flow Transmit in AS Installation of Flow Transmit in AS as per SLA. For more details refer SLA. 50 each bhavesh.hrrl 545
7 Installation of Level Transmit in CS Installation of Level Transmit in CS as per SLA. For more details refer SLA. 5 each bhavesh.hrrl 545
8 Installation of Level Gauges in CS Installation of Level Gauges in CS as per SLA. For more details refer SLA. 5 each bhavesh.hrrl 545
9 Installation of Thermocouple Installation of Thermocouple as per SLA. For more details refer SLA. 10 each bhavesh.hrrl 545
10 Installation of Temp Indicators Installation of Temp Indicators as per SLA. For more details refer SLA. 20 each bhavesh.hrrl 545
11 Installation of Temp Transmitters Installation of Temp Transmitters as per SLA. For more details refer SLA. 40 each bhavesh.hrrl 545
12 Intalllation of 2 Inch Yoke Supports Intalllation of 2 Inch Yoke Supports as per SLA. For more details refer SLA. 80 each bhavesh.hrrl 545
13 Intalllation of 3 Inch Yoke Supports Intalllation of 3 Inch Yoke Supports as per SLA. For more details refer SLA. 80 each bhavesh.hrrl 545
14 Supply and inst of SS tag plates Supply and inst of SS tag plates as per SLA. For more details refer SLA. 500 each bhavesh.hrrl 545
15 Stenciling of 1 Inch letter Stenciling of 1 Inch letter as per SLA. For more details refer SLA. 10,000 each bhavesh.hrrl 545
16 Stenciling of 2 Inch letter Stenciling of 2 Inch letter as per SLA. For more details refer SLA. 10,000 each bhavesh.hrrl 545
17 loop checking for PT loop checking for PT as per SLA. For more details refer SLA. 50 each bhavesh.hrrl 545
18 loop checking for FT loop checking for FT as per SLA. For more details refer SLA. 50 each bhavesh.hrrl 545
19 loop checking for TT loop checking for TT as per SLA. For more details refer SLA. 50 each bhavesh.hrrl 545
20 loop checking for LT loop checking for LT as per SLA. For more details refer SLA. 10 each bhavesh.hrrl 545
21 loop checking for CV loop checking for CV as per SLA. For more details refer SLA. 50 each bhavesh.hrrl 545
22 Installation of Junction Box installation of Junction Box as per SLA. For more details refer SLA. 30 each bhavesh.hrrl 545
23 Laying of 1 pair cable Laying of 1 pair cable as per SLA. For more details refer SLA. 5,200 meters bhavesh.hrrl 545
24 Laying of 12 pair cable Laying of 12 pair cable as per SLA. For more details refer SLA. 13,300 meters bhavesh.hrrl 545
25 Laying of power cable Laying of power cable as per SLA. For more details refer SLA. 200 meters bhavesh.hrrl 545
26 Laying and term of earthing cable Laying and term of earthing cable as per SLA. For more details refer SLA. 50 meters bhavesh.hrrl 545
27 Laying of Fiber optics cable Laying of Fiber optics cable as per SLA. For more details refer SLA. 1,200 meters bhavesh.hrrl 545
28 Termination of Optical fiber cable Termination of Optical fiber cable as per SLA. For more details refer SLA. 24 each bhavesh.hrrl 545
29 Erection of FRP duct 1200 mm W Erection of FRP duct 1200 mm W as per SLA. For more details refer SLA. 80 meters bhavesh.hrrl 545
30 Erection of FRP duct 400 mm W Erection of FRP duct 400 mm W as per SLA. For more details refer SLA. 160 meters bhavesh.hrrl 545
31 Erection of FRP trays 300 mm W Erection of FRP trays 300 mm W as per SLA. For more details refer SLA. 2,000 meters bhavesh.hrrl 545
32 Erection of FRP trays 150 mm W Erection of FRP trays 150 mm W as per SLA. For more details refer SLA. 1,000 meters bhavesh.hrrl 545
33 Erection of FRP trays 60 mm W Erection of FRP trays 60 mm W as per SLA. For more details refer SLA. 1,500 meters bhavesh.hrrl 545
34 Erection of canopies for Transmitters Erection of canopies for Transmitters as per SLA. For more details refer SLA. 200 each bhavesh.hrrl 545
35 Tubing hookup for CV or positioner Tubing hookup for CV or positioner as per SLA. For more details refer SLA. 30 each bhavesh.hrrl 545
36 Installation of Air manifold Installation of Air manifold as per SLA. For more details refer SLA. 10 each bhavesh.hrrl 545
37 Fab Erection of SS air lines Fab Erection of SS air lines as per SLA. For more details refer SLA. 500 meters bhavesh.hrrl 545
38 Deployment of Electrician Deployment of Electrician as per SLA. For more details refer SLA. 150 man days bhavesh.hrrl 545
39 Deployment of Technician Deployment of Technician as per SLA. For more details refer SLA. 150 man days bhavesh.hrrl 545
40 Deployment of Fitter Deployment of Fitter as per SLA. For more details refer SLA. 100 man days bhavesh.hrrl 545
41 Deployment of helper Deployment of helper as per SLA. For more details refer SLA. 200 man days bhavesh.hrrl 545
42 Instrument calibration Instrument calibration as per SLA. For more details refer SLA. 200 each bhavesh.hrrl 545
43 Monthly Mobilisation Monthly Mobilisation as per SLA. For more details refer SLA. 18 each bhavesh.hrrl 545
44 Arranging Forklift Arranging Forklift as per SLA. For more details refer SLA. 80 hours bhavesh.hrrl 545
45 Arranging Truck or Dumper Arranging Truck or Dumper as per SLA. For more details refer SLA. 20 shift hours bhavesh.hrrl 545

Required Documents

1

Certificate (Requested in ATC)

2

Additional Doc 1 (Requested in ATC)

3

Additional Doc 2 (Requested in ATC)

4

Additional Doc 3 (Requested in ATC)

5

Additional Doc 4 (Requested in ATC)

6

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Reverse Auction Schedule

Completed

Start

24-May-2025, 8:00 pm

End

26-May-2025, 8:00 pm

Duration: 48 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1KRITI CONSTRUCTION COMPANY   Under PMA-09-05-2025 12:55:34Disqualified
2RKG INSTRUMENTATION PRIVATE LIMITED   Under PMA-08-05-2025 11:29:11Qualified
3TELECON SYSTEMS LIMITED   Under PMA-07-05-2025 16:37:08Qualified

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1TELECON SYSTEMS LIMITED(MSE,MII)   Under PMA Winner ₹1,78,46,864Item Categories : Installation of Pressure Gauge in CS,Installation of Pressure Gauge in AS,Installation of Pressure
L2RKG INSTRUMENTATION PRIVATE LIMITED (MSE,MII)   Under PMA₹1,78,64,964Item Categories : Installation of Pressure Gauge in CS,Installation of Pressure Gauge in AS,Installation of Pressure

🎉 L1 Winner

TELECON SYSTEMS LIMITED(MSE,MII)   Under PMA

Final Price: ₹1,78,46,864

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Frequently Asked Questions

Key insights about RAJASTHAN tender market

What are the eligibility requirements for participating in this tender?

The eligibility requirements include being a registered entity capable of executing similar instrumentation projects, possessing adequate technical expertise, and having a skilled workforce available for the services required. Financial documentation demonstrating the bidder's ability to manage the required quantity of 47,572 units is also necessary.

What certifications are required for the instrumentation services tender?

Bidders must present relevant certifications that demonstrate compliance with quality and safety standards in instrumentation services. This includes technical certifications for installation practices, calibration processes, and adherence to industry specifications.

What is the registration process for this tender?

To participate, bidders must register on the designated electronic platform listed in the tender documents. The registration process involves creating an account, completing vendor profiles, and uploading necessary documents such as certificates and financial statements.

What are the payment terms associated with the tender?

Payment terms will generally be outlined in the contract agreement post-award. Bidders are expected to detail their payment schedules, including milestones and conditions for payment based on service completion and delivery.

Are there specific provisions for MSEs and startups included in this tender?

Yes, the tender actively encourages participation from Micro, Small, and Medium Enterprises (MSEs) and includes specific provisions to support startups. This is in alignment with national policies aimed at promoting local entrepreneurship through enhanced opportunities in public procurement.