Bharat Heavy Electricals Limited U-TUBE BUNDLE FOR HEAT EXCHANGER Tender Bhopal Rajasthan 2026

Bid Publish Date

03-Oct-2026, 10:41 am

Bid End Date

16-Oct-2026, 5:00 pm

Generate Docs

Progress

Issue03-Oct-2026, 10:41 am
Corrigendum13-Oct-2026
AwardPending

Key Highlights

  • • Material delivered per DRG 1SP03002701/02 with door delivery to BHEL Bhopal
  • • Option clause enabling +/-25% quantity variation during contract
  • • Post-receipt inspection at BHEL Bhopal; pre-dispatch inspection dependent on ATC
  • • Mandatory PQR and checklist with bid; MISCC/banned status disqualifies

Tender Overview

Bharat Heavy Electricals Limited (BHEL), a premier govt engineering organization, invites bids for U-TUBE BUNDLE FOR HEAT EXCHANGER covering items per DRG. NO. 1SP03002701/02. The procurement includes multiple heat exchanger bundle assemblies and is to be delivered to the supplier on a door delivery basis to BHEL Bhopal. The contract scope references quantity variations up to 25% by the purchaser with extended delivery time calculations. The bidder must submit a completed PQR form and maintain Test and Guarantee certificates for supplied items. Compliance with MISCC/banned status is mandatory. The terms include 100% payment in 90 days (MSME 45 days; UDYAM-registered 60 days).

Technical Specifications & Requirements

  • Inspection: Post-receipt inspection at BHEL Bhopal; pre-dispatch inspection not applicable unless ATC specifies; Nominated inspection agency can be selected by Buyer.
  • Certificates & Documentation: Certificates to be uploaded with bid; PQR/checklist forms to be filled; OEM authorizations and test certificates required; Local Content Format & Conflict of Interest signed on letterhead.
  • Delivery & Packaging: Items to be supplied per DRG specifications, properly packed for BHEL Bhopal door delivery; proof of guarantee certificates to be provided with the offer.
  • Eligibility & Compliance: Vendors or OEMs on MISCC/debarred lists are not eligible; GST compliance to be verified by bidder; test & guarantee certificates mandatory.
  • Payment Terms: 100% payment within 90 days of receipt; MSME suppliers get 45 days; others 60 days as per UDYAM status.

Terms, Conditions & Eligibility

  • Option Clause: Purchaser may increase/decrease quantity up to 25% during contract and extension period calculation follows: (increased quantity ÷ original quantity) × original delivery period, with minimum 30 days.
  • Delivery Schedule: Delivery period starts from last date of original delivery order; extension time rules apply; minimum delivery window enforced.
  • Governance: All bidders must comply with bid-specific and general terms; non-uploaded certificates may lead to rejection; GST will be as per actual or applicable rates, whichever is lower.
  • Documentation: Include GST, PAN, experience certificates, financials, EMD documents, technical bid, and OEM authorizations; local content and conflict-of-interest forms must be signed.
  • Quality & Test: Guarantee/test certificates required; supplier must ensure items meet DRG references and packing standards for BHEL Bhopal delivery.

Key Specifications

  • Product: U-TUBE BUNDLE FOR HEAT EXCHANGER

  • DRG references: 1SP03002701 and 1SP03002702

  • Delivery: BHEL Bhopal, door delivery

  • Inspection: Post-receipt inspection at consignee site (BHEL Bhopal)

  • Certificates: Test & Guarantee certificates; upload with bid; MISCC status checked

Terms & Conditions

  • Option clause allows +/-25% quantity variation during contract

  • 100% payment within 90 days; MSME and UDYAM-based terms specified

  • Post-receipt inspection at BHEL Bhopal; pre-dispatch inspection dependent on ATC

Important Clauses

Payment Terms

100% payment in 90 days from receipt; MSME suppliers 45 days; UDYAM-registered 60 days

Delivery Schedule

Delivery period starts from last date of original delivery order; extension via option clause with minimum 30 days

Penalties/Liquidated Damages

Standard LD terms apply per contract; not detailed in provided data

Bidder Eligibility

  • Not listed on MISCC/banned/debarred vendor lists

  • Ability to supply per DRG 1SP03002701/02 with proper packing

  • GST compliance verified; GST rate aligned to actuals or lower applicable rates

Advertisement

Tender Data

Bid Details

Quantity

6

Category

U-TUBE BUNDLE FOR HEAT EXCHANGER, ITEM NO. 01 AS PER DRG. NO. 1SP03002701.

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Item wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Warranty Period

1 years

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

U-TUBE BUNDLE FOR HEAT EXCHANGER, ITEM NO. 01 AS PER DRG. NO. 1SP03002701. , U-TUBE BUNDLE FOR HEAT EXCHANGER, ITEM NO. 02 AS PER DRG. NO. 1SP03002701. , U-TUBE BUNDLE FOR HEAT EXCHANGER AS PER DRG. NO. 1SP03002702.

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

Bhopal

Delivery Pincodes

462022

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Rajkumar462022,BHARAT HEAVY ELECTRICAL LTD, PIPLANIBhopalMadhya Pradesh462022290-

Authority Records

MINISTRY OF HEAVY INDUSTRIESHEAVY INDUSTRY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9974910.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Corrigendum Updates

1 Update
#1

Update

13-Oct-2026

Extended Deadline

16-Oct-2026, 11:30 am

Opening Date

17-Oct-2026, 11:30 am

Advertisement

Categories 16

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar U-TUBE BUNDLE supplies

4

Financial statements (latest audited) or equivalent

5

EMD documents as applicable and payment proof

6

Technical bid documents and compliance certificates

7

OEM authorization letters (if applicable)

8

PQR form and Checklist form duly filled, signed & sealed

9

Local Content Format & Conflict of Interest form

Frequently Asked Questions

Key insights about MADHYA PRADESH tender market

How to bid for U-TUBE BUNDLE tender in BHEL Bhopal 2026

Bidders must submit the filled PQR and Checklist along with OEM authorizations, GST, PAN, and financials. Ensure post-receipt inspection readiness at BHEL Bhopal, and attach test/guarantee certificates. The bid must confirm DRG references 1SP03002701/02 and door delivery compliance.

What documents are required for BHEL heat exchanger tender 2026

Required documents include GST certificate, PAN card, latest audited financials, experience certificates for similar U-TUBE bundles, EMD proof, technical bid, OEM authorizations, PQR form, and Local Content & Conflict of Interest forms signed on letterhead.

What are the payment terms for BHEL procurement of U-TUBE bundles

Payment terms specify 100% payment within 90 days of receipt; MSME suppliers qualify for 45 days; UDYAM-registered suppliers receive 60 days. Payments are subject to material acceptance and GST considerations.

What are the delivery and inspection requirements for this tender

Delivery is door delivery to BHEL Bhopal per DRG 1SP03002701/02. Post-receipt inspection at BHEL Bhopal will verify conformity. Pre-dispatch inspection may occur only if ATC specifies; otherwise not applicable.

What standards or certifications are required for this BHEL bid

Submit test and guarantee certificates with the supply; ensure compliance with DRG specifications; vendors must not be MISCC-listed; Local Content format must be completed; ensure GST accuracy as per actuals or lower rates.

How does quantity variation work under the option clause

The purchaser may adjust quantity by ±25% at contract award and during the currency. Delivery time extension uses formula: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days, with potential extension to original period.

What is required to prove vendor eligibility for this BHEL tender

Eligibility requires not being debarred on MISCC, providing PQR form filled, authentication of OEMs where applicable, and demonstration of capacity to deliver per DRG 1SP03002701/02 with door delivery.

What is the significance of DRG numbers in this tender

DRG 1SP03002701/02 specify the U-TUBE bundle configurations and dimensions for heat exchangers. Bidders must align manufactured products to these drawings and provide corresponding documentation and test certificates for compliance.

Advertisement