Indian Army Procurement LV7 Mechanical Components Tender 2025 - LV7 VALVE & PUMP ASSY Items, India
Indian Army
AMRITSAR, PUNJAB
Progress
Quantity
24
Category
LV7 STLN AIR DRYER
Bid Type
Two Packet Bid
The Indian Army, Department of Military Affairs, invites bids for LV7 component procurement in Amritsar, Punjab 143001. The scope covers multiple LV7 sub‑assemblies including STLN air dryer, T815 control valve, STLN water pump, R72 moisture separator, MG fuel pump assemblies, T815 hand pump, T815 indicator, MG clutch/pressure plates, clutch return bearings, T815 circuit breaker, and MG alternator. The BOQ lists 12 items with no explicit quantities or values disclosed. A 25% quantity variation clause is included, and bidders must submit a sample before the bid submission deadline. A mandatory turnover and past‑experience framework governs eligibility.
Key control points include: 12 items in the BOQ; no detailed technical specs available in the published data. Bidders must provide sample material before the bid close. The buyer reserves the right to accept or reject materials per quality evaluations. Turnover criteria mandate financials for the last three financial years; documentation may include audited balance sheets or CA certificate. Past experience can be demonstrated via contract copies, client execution certificates, or equivalent proofs.
Critical terms include: 25% optional quantity extension at contract rates; delivery period adjustments based on extended quantity; turnover requirements for the last three years; acceptable proof for past experience (contracts, invoices, client certificates); submission of sample material prior to bid end; bidder must comply with these ATC clauses and bid terms. The tender emphasizes supplier capability, financial stability, and adherence to delivery and quality checks.
12 LV7 category items listed in BOQ
Sample submission required before bid end
Turnover and past experience criteria for eligibility
No explicit technical standards provided in tender data
Quantity variation right up to 25% during contract, with proportional time extensions
25% quantity variation right with extended delivery time
Turnover of last three financial years required with supporting documents
Mandatory sample submission prior to bid closing
Not disclosed in tender data; ensure to verify during bid clarification and ATC responses
Delivery period linked to original and extended quantity; minimum 30 days extension rule applies
Not specified in data; anticipate LD provisions per standard government contract practice
Minimum average annual turnover as per bid document for last 3 years
Proof of past experience via contracts/invoices or client certificates
Ability to supply LV7 sub‑assemblies and comply with ATC conditions
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
AMRITSAR, PUNJAB
Indian Army
AMRITSAR, PUNJAB
Indian Army
AMRITSAR, PUNJAB
Indian Army
Indian Army
AMRITSAR, PUNJAB
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | LV7 STLN AIR DRYER | LV7 STLN AIR DRYER | 1 | nos | wkspoc6023 | 30 |
| 2 | LV7 T815 CONTROL VALVE | LV7 T815 CONTROL VALVE | 1 | nos | wkspoc6023 | 30 |
| 3 | LV7 STLN WATER PUMP | LV7 STLN WATER PUMP | 2 | nos | wkspoc6023 | 30 |
| 4 | LV1 R72 MOISTURE SEPARATOR | LV1 R72 MOISTURE SEPARATOR | 3 | nos | wkspoc6023 | 30 |
| 5 | LV7 MG FUEL ASSY PUMP | LV7 MG FUEL ASSY PUMP | 1 | nos | wkspoc6023 | 30 |
| 6 | LV7 T815 HAND PUMP | LV7 T815 HAND PUMP | 1 | nos | wkspoc6023 | 30 |
| 7 | LV7 T815 INDICATOR | LV7 T815 INDICATOR | 4 | nos | wkspoc6023 | 30 |
| 8 | LV7 MG CLUTCH PLATE | LV7 MG CLUTCH PLATE | 3 | nos | wkspoc6023 | 30 |
| 9 | LV7 MG PRESSURE PLATE | LV7 MG PRESSURE PLATE | 3 | nos | wkspoc6023 | 30 |
| 10 | LV7 MG CLUTCH REL BRG | LV7 MG CLUTCH REL BRG | 3 | nos | wkspoc6023 | 30 |
| 11 | LV7 T815 CIRCUIT BREAKER | LV7 T815 CIRCUIT BREAKER | 1 | nos | wkspoc6023 | 30 |
| 12 | LV7 MG ALTERNATOR | LV7 MG ALTERNATOR | 1 | nos | wkspoc6023 | 30 |
Discover companies most likely to bid on this tender
Key insights about PUNJAB tender market
To participate, bidders must submit a sample before the bid closing date, meet turnover and past experience criteria, and demonstrate capability to supply 12 LV7 item categories. Ensure compliance with 25% quantity variation clause and ATC terms; upload audited financials or CA certificate showing three‑year turnover.
Required documents include audited financial statements or CA certificate showing three‑year turnover, contract copies or client certificates for past experience, sample submission, GST registration, PAN, and technical bid documents; OEM authorizations may be needed for specific LV7 components depending on supplier role.
The tender lists 12 LV7 category items but provides no explicit performance standards or IS/ISO references. Bidders should rely on client acceptance criteria, supplier quality plans, and standard military procurement practices; be prepared to supply samples and demonstrate compatibility with LV7 assemblies.
The exact submission deadline is not disclosed in the published data. Bidders should monitor bid portal updates for last‑date guidance, ensure sample submission before the deadline, and comply with 25% variation and delivery terms once contract is awarded.
Turnover must meet the minimum average annual value for the last three financial years as specified in the bid document. Upload certified audited balances or CA certificates detailing annual turnover to demonstrate financial viability for the LV7 components contract.
Acceptable proofs include contract copies with invoices and bidder self‑certification, execution certificates from clients, or third‑party inspection notes confirming successful delivery and performance of LV7 components.
The purchaser may increase or decrease bid quantity up to 25% at contracted rates during or after the contract, with time extensions calculated as (increased quantity/original quantity) × original days, minimum 30 days. Ensure readiness to scale production accordingly.
OEM authorization requirements depend on item and supplier role; some LV7 components may require original equipment manufacturer approvals or authorized distributorship proofs. Verify during bid clarification and include OEM letters with technical bid if applicable.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS