TenderDekho Logo
GEM

Indian Army LV7 Components Procurement Tender Amritsar Punjab 2026 - Air Dryer, Control Valve, Water Pump & More

Bid Publish Date

17-Feb-2026, 9:28 pm

Bid End Date

28-Feb-2026, 9:00 am

Progress

Issue17-Feb-2026, 9:28 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

24

Category

LV7 STLN AIR DRYER

Bid Type

Two Packet Bid

Categories 33

Tender Overview

The Indian Army, Department of Military Affairs, invites bids for LV7 component procurement in Amritsar, Punjab 143001. The scope covers multiple LV7 sub‑assemblies including STLN air dryer, T815 control valve, STLN water pump, R72 moisture separator, MG fuel pump assemblies, T815 hand pump, T815 indicator, MG clutch/pressure plates, clutch return bearings, T815 circuit breaker, and MG alternator. The BOQ lists 12 items with no explicit quantities or values disclosed. A 25% quantity variation clause is included, and bidders must submit a sample before the bid submission deadline. A mandatory turnover and past‑experience framework governs eligibility.

Technical Specifications & Requirements

Key control points include: 12 items in the BOQ; no detailed technical specs available in the published data. Bidders must provide sample material before the bid close. The buyer reserves the right to accept or reject materials per quality evaluations. Turnover criteria mandate financials for the last three financial years; documentation may include audited balance sheets or CA certificate. Past experience can be demonstrated via contract copies, client execution certificates, or equivalent proofs.

Terms, Conditions & Eligibility

Critical terms include: 25% optional quantity extension at contract rates; delivery period adjustments based on extended quantity; turnover requirements for the last three years; acceptable proof for past experience (contracts, invoices, client certificates); submission of sample material prior to bid end; bidder must comply with these ATC clauses and bid terms. The tender emphasizes supplier capability, financial stability, and adherence to delivery and quality checks.

Key Specifications

  • 12 LV7 category items listed in BOQ

  • Sample submission required before bid end

  • Turnover and past experience criteria for eligibility

  • No explicit technical standards provided in tender data

  • Quantity variation right up to 25% during contract, with proportional time extensions

Terms & Conditions

  • 25% quantity variation right with extended delivery time

  • Turnover of last three financial years required with supporting documents

  • Mandatory sample submission prior to bid closing

Important Clauses

Payment Terms

Not disclosed in tender data; ensure to verify during bid clarification and ATC responses

Delivery Schedule

Delivery period linked to original and extended quantity; minimum 30 days extension rule applies

Penalties/Liquidated Damages

Not specified in data; anticipate LD provisions per standard government contract practice

Bidder Eligibility

  • Minimum average annual turnover as per bid document for last 3 years

  • Proof of past experience via contracts/invoices or client certificates

  • Ability to supply LV7 sub‑assemblies and comply with ATC conditions

Documents 4

GeM-Bidding-9002432.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Indian Army Procurement LV7 Mechanical Components Tender 2025 - LV7 VALVE & PUMP ASSY Items, India

Indian Army

AMRITSAR, PUNJAB

Posted: 28 October 2025
Closed: 8 November 2025
GEM

LV7 MG FUEL PUMP ASSY,LV7 T815 CLUTCH PLATE,LV7 T815 CLUTCH BOOSTER ASSY,LV7 T815 CLUTCH RELEASE BR

Indian Army

AMRITSAR, PUNJAB

Posted: 26 April 2025
Closed: 24 May 2025
GEM

LV7 T815 HYDRAULIC AGGREGATE PUMP,LV7 T815 SWITCH SWF,LV7 T815 OIL COOLER,LV7 T815 CLUTCH VALVE,LV7

Indian Army

AMRITSAR, PUNJAB

Posted: 9 January 2025
Closed: 30 January 2025
GEM

LV7 T815 FUEL FEED PUMP,LV7 T815 FUEL FEED ASSY,LV7 T815 AIR DRYER,LV7 T815 AIR PRESSURE GOVERNOR,L

Indian Army

Posted: 16 November 2024
Closed: 7 December 2024
GEM

LV7 STLN CLUTCH ASSY CYL,LV7 STLN CLUCH PLATE,LV7 STLN CLUTCH CYL ASSY,LV1 R72 FUEL ASSY GAUGE,LV7

Indian Army

AMRITSAR, PUNJAB

Posted: 17 December 2025
Closed: 29 December 2025
GEM

Bill of Quantities (BOQ) 12 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 LV7 STLN AIR DRYER LV7 STLN AIR DRYER 1 nos wkspoc6023 30
2 LV7 T815 CONTROL VALVE LV7 T815 CONTROL VALVE 1 nos wkspoc6023 30
3 LV7 STLN WATER PUMP LV7 STLN WATER PUMP 2 nos wkspoc6023 30
4 LV1 R72 MOISTURE SEPARATOR LV1 R72 MOISTURE SEPARATOR 3 nos wkspoc6023 30
5 LV7 MG FUEL ASSY PUMP LV7 MG FUEL ASSY PUMP 1 nos wkspoc6023 30
6 LV7 T815 HAND PUMP LV7 T815 HAND PUMP 1 nos wkspoc6023 30
7 LV7 T815 INDICATOR LV7 T815 INDICATOR 4 nos wkspoc6023 30
8 LV7 MG CLUTCH PLATE LV7 MG CLUTCH PLATE 3 nos wkspoc6023 30
9 LV7 MG PRESSURE PLATE LV7 MG PRESSURE PLATE 3 nos wkspoc6023 30
10 LV7 MG CLUTCH REL BRG LV7 MG CLUTCH REL BRG 3 nos wkspoc6023 30
11 LV7 T815 CIRCUIT BREAKER LV7 T815 CIRCUIT BREAKER 1 nos wkspoc6023 30
12 LV7 MG ALTERNATOR LV7 MG ALTERNATOR 1 nos wkspoc6023 30

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Frequently Asked Questions

Key insights about PUNJAB tender market

How to bid for Indian Army LV7 components tender in Amritsar?

To participate, bidders must submit a sample before the bid closing date, meet turnover and past experience criteria, and demonstrate capability to supply 12 LV7 item categories. Ensure compliance with 25% quantity variation clause and ATC terms; upload audited financials or CA certificate showing three‑year turnover.

What documents are required for LV7 procurement bid in Amritsar 2026?

Required documents include audited financial statements or CA certificate showing three‑year turnover, contract copies or client certificates for past experience, sample submission, GST registration, PAN, and technical bid documents; OEM authorizations may be needed for specific LV7 components depending on supplier role.

What are the key technical specifications for LV7 items in this tender?

The tender lists 12 LV7 category items but provides no explicit performance standards or IS/ISO references. Bidders should rely on client acceptance criteria, supplier quality plans, and standard military procurement practices; be prepared to supply samples and demonstrate compatibility with LV7 assemblies.

When is the bid submission deadline for Amritsar LV7 tender?

The exact submission deadline is not disclosed in the published data. Bidders should monitor bid portal updates for last‑date guidance, ensure sample submission before the deadline, and comply with 25% variation and delivery terms once contract is awarded.

What is the turnover requirement for LV7 procurement in Punjab?

Turnover must meet the minimum average annual value for the last three financial years as specified in the bid document. Upload certified audited balances or CA certificates detailing annual turnover to demonstrate financial viability for the LV7 components contract.

What documents prove past experience for LV7 components tender in Amritsar?

Acceptable proofs include contract copies with invoices and bidder self‑certification, execution certificates from clients, or third‑party inspection notes confirming successful delivery and performance of LV7 components.

What is the scope of the 25% option clause in this Army tender?

The purchaser may increase or decrease bid quantity up to 25% at contracted rates during or after the contract, with time extensions calculated as (increased quantity/original quantity) × original days, minimum 30 days. Ensure readiness to scale production accordingly.

Are there any mandatory OEM authorizations for LV7 items tendered in Amritsar?

OEM authorization requirements depend on item and supplier role; some LV7 components may require original equipment manufacturer approvals or authorized distributorship proofs. Verify during bid clarification and include OEM letters with technical bid if applicable.