Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2)
Directorate Of Higher Education
AKOLA, MAHARASHTRA
Bid Publish Date
30-Jun-2026, 11:52 am
Bid End Date
10-Jul-2026, 12:00 pm
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
Satara District Panchayats (Department of Panchayati Raj, Maharashtra) invites bids for a Solar Power Plant (Roof Top) onGRID System, Three Phase. Scope covers inverter specifications, input/output cabling, mounting structure material for panels, junction box material and IP rating, and display type. Location: Satara, Maharashtra 412801. Estimated value and EMD are not disclosed in the data, but bidders should prepare for turnkey installation of roof-top systems with cabling at input side for each system. The tender emphasizes precise electrical and mechanical compatibility for three-phase operation and integration with rooftop infrastructure. A key differentiator is the emphasis on material specifications for mounting structure and junction boxes, along with protection and display requirements. Unique terms include an option clause to adjust quantity up to 25% during and after contract execution, with delivery timelines linked to last delivery order date and a minimum 30-day extension rule. The tender is location-specific and targets qualified solar installers with competency in on-grid rooftop deployments.
Inverter: Rated output power in KW to be specified by bidder
Inverter operating voltage range to match three-phase grid
Protection: Power factor at rated output power to be disclosed
Display: Type of display for inverter (LCD/LED/remote monitoring)
Cabling: Input side cabling work for each system
Mounting: Material specification for mounting structure
Junction Box: Material and IP rating specification
Quantity modification up to 25% with proportional delivery time adjustments
Delivery schedule tied to last delivery order date and minimum 30 days extension
Compliance with inverter, mounting, and junction box material specifications
Not specified in data; bidders should anticipate standard government terms with milestone payments upon delivery/completion
Delivery period begins after original delivery order; option clause allows extended delivery based on formula with minimum 30-day extension
Not detailed; bidders should prepare for standard LDs for delayed delivery or non-compliance per contract terms
Experience in designing/implementing on-grid rooftop solar power plants (three-phase)
Capability to supply inverter systems with specified KW, voltage range, and PF
Proven track record in rooftop mounting structures and weather-rated junction boxes
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2) (Q3)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
GEM_CATEGORY_SPECIFICATION
GEM_GENERAL_TERMS_AND_CONDITIONS
Directorate Of Higher Education
AKOLA, MAHARASHTRA
Sangli District Panchayats
SANGLI, MAHARASHTRA
Satara District Panchayats
SATARA, MAHARASHTRA
Satara District Panchayats
SATARA, MAHARASHTRA
N/a
AMRAVATI, MAHARASHTRA
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| INVERTER | Rated output power of inverter (in KW) | 3 |
| INVERTER | Operating Voltage Range of Inverter | 200 V to 1000 V |
| PROTECTION FOR INVERTER | Power factor at rated output power | >/= 0.9 |
| DISPLAY FEATURES ON INVERTER | Type of display | LED |
| Other Add on Items | Cabling work at input side for each system | With PVC Conduit pipe with necessary clamps and screws |
| ARRAY STRUCTURE | Material of mounting structure for mounting the modules/ panels/arrays | Structural Steel, Grade: E300 (as per IS 2062) |
| JUNCTION BOX | Material of Junction Box | GRP (Glass reinforced plastic) |
| JUNCTION BOX | Ingress protection (Degree of Protection) for Junction Box | IP65 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for prior solar rooftop installations
Financial statements or turnover proof
EMD/Security deposit documents (as applicable)
Technical bid documents detailing inverter, mounting, cabling, and junction box specs
OEM authorizations or manufacturer certifications for solar components
Key insights about MAHARASHTRA tender market
Bidders must meet eligibility criteria for rooftop on-grid solar projects in Satara, submit GST/PAN, experience certificates, financials, and EMD. Provide inverter specs (KW, voltage range, PF), mounting and junction box materials, and cabling plans. Ensure compliance with option clause and delivery terms.
Submit GST certificate, PAN, experience certificates of prior rooftop installations, financial statements, EMD documentation, and technical bids detailing inverter ratings, mounting materials, cabling, and IP-rated junction boxes. OEM authorizations strengthen eligibility and bid credibility.
Provide inverter rated KW, operating voltage range suitable for three-phase grid, PF at rated power, and display type. Also specify monitoring data and compatibility with rooftop mounting structures. Detailed BOM for all electrical connections is recommended.
Delivery period begins from the last date of the original delivery order. If quantity increases by up to 25%, extended delivery time is calculated as (increased quantity/original quantity) × original period, with a minimum 30 days extension.
Bidders should detail IP ratings for junction boxes, mounting structure materials, and ensure inverter PF specifications meet project requirements. While specific IS/ISO codes are not listed, anticipate standard solar component certifications and weather-rated materials suitable for Maharashtra conditions.
Plan for a potential 25% up or down quantity, with rates locked at contract levels. Ensure you can scale production and logistics accordingly and demonstrate flexible delivery scheduling to accommodate extended timelines if required.
Include inverter KW rating, voltage range, PF, display type, cabling plan, mounting structure material, junction box material and IP rating. Attach OEM authorizations and installation experience proofs; ensure all documents align with terms and the delivery framework.
Warranty specifics are not detailed in the data; bidders should propose standard solar warranty terms and AMC options with clearly defined service levels, response times, and maintenance windows to meet project reliability needs.
Nagpur District Panchayats
📍 NAGPUR, MAHARASHTRA
Zilla Parishad Sangli
📍 SANGLI, MAHARASHTRA
Zilla Parishad Sangli
📍 SANGLI, MAHARASHTRA
Gspl India Gasnet Limited
Gspl India Gasnet Limited
Sign up now to access all documents
Main Document
GEM_CATEGORY_SPECIFICATION
GEM_GENERAL_TERMS_AND_CONDITIONS