Bid Publish Date
23-Sep-2026, 10:27 am
Bid End Date
05-Oct-2026, 11:00 am
Location
Progress
Organization: Indian Council Of Agricultural Research (ICAR) – CIAE, Bhopal (Muffle/Box Furnace, V2 category) seeks a full supply and installation package, including Testing and Commissioning. The bid scope covers transformation from supply to on-site deployment, with an optional quantity adjustment window up to 25% of bid quantity. The contracting terms allow delivery period adjustments based on the option clause. EMD/PBG alternative methods include Demand Draft or Fixed Deposit Receipt, with hard-copy delivery within 15 days of award. A data sheet alignment requirement ensures technical parameter matching with the product offerings. Location details are not disclosed in the tender summary.
Product: Muffle/Box Furnace (V2) with explicit data sheet
Scope: Supply, Installation, Testing and Commissioning
EMD/Performance Security: DD or FDR options; DD payable to ICAR UNIT CIAE BHOPAL
Delivery timeline: Determined by option clause with minimum 30 days
GST: Applicable as per bidder's rate; reimbursement as per actuals or cap
Quantitative option: +/- 25% order quantity with corresponding delivery adjustment
Security: DD or FDR accepted as performance security with 15-day delivery of hard copy
SITC: Price must include all costs for supply, installation, testing, and commissioning
EMD can be submitted as DD or online; PBG not mandatory if DD/FDR provided; payment terms unspecified beyond SITC scope
Delivery period governed by option clause; minimum 30 days; extended duration calculated as (Increased quantity ÷ Original quantity) × Original delivery period
Penalties not explicitly stated; delivery extensions possible via option clause
Experience in supply and installation of furnace equipment
Ability to provide SITC with data-sheet-compliant product
GST registration and financial stability documentation
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
100 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
3 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
2
OEM Avg. Turnover
18
Past Performance
10 %
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Muffle/Box Furnace (V2) (Q2)
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
14
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Bhopal
Delivery Pincodes
462038
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Ashish Sahu | 462038,Central Institute of Agricultural Engineering, Nabibagh, Berasia Road, Bhopal | Bhopal | Madhya Pradesh | 462038 | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST Registration certificate
PAN card
Data Sheet of offered product
Experience certificates (relevant to SITC of furnaces)
Financial statements or creditworthiness proof
EMD submission document (DD or online payment receipt)
PBG (if chosen) or evidence of possible PBG alternative
OEM authorizations or data supporting product eligibility
Technical bid documents aligning with IS/IEC standards if applicable
Bidders must submit a complete technical bid with a data sheet matching the offered furnace. Include GST, EMD via DD or online, and/or an FDR/PBG as security. Ensure installation, testing, and commissioning are included. Delivery terms follow the option clause with up to 25% quantity variation.
Required documents include GST certificate, PAN, company financials, experience certificates for SITC of furnaces, data sheet of the offered product, EMD payment proof, and security deposit options (DD or FDR/PBG). OEM authorizations may be needed for product eligibility.
Delivery is SITC, as per the option clause. Quantity can increase/decrease by 25%, with extended delivery time calculated by (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
Acceptable security deposits include an Account Payee Demand Draft in favor of ICAR UNIT CIAE BHOPAL, or a Fixed Deposit Receipt pledged to the same account, with hard copies due within 15 days of contract award.
The data sheet must align with the offered furnace parameters; mismatches may cause rejection. Include model, capacity, operating temperatures, power requirements, and compliance with applicable standards noted in tender terms.
GST is to be calculated by bidders and reimbursed per actuals or applicable rates, whichever is lower, up to quoted GST percentage. Ensure correctness in bid pricing to avoid dispute during reimbursement.
SITC covers all costs for supply, installation, testing, and commissioning of the furnace at the designated site, including any on-site adjustments and verification to meet performance criteria.
The purchaser reserves the right to increase or decrease the bid quantity by up to 25% at contract placement and during the currency of the contract, with corresponding adjustments to delivery timelines.