Bid Publish Date
17-Oct-2025, 5:27 pm
Bid End Date
10-Nov-2025, 5:00 pm
EMD
₹21,000
Location
Progress
The procurement targets a Multifunction Machine MFM (V2) (Q2) in South Delhi, DELHI - 110016. The tender requires supply, installation, testing, commissioning, and operator training, with an EMD of ₹21,000. The scope emphasizes a locally sourced solution with mandatory Delhi service facilities and no China-made components, aligning with Make in India. The award will reflect options to scale quantities underClause with a 25% flexibility, and the delivery timeline hinges on the original delivery period. The tender emphasizes a service centre in Delhi and a dedicated support contact, ensuring after-sales service aligns with regional requirements.
Multifunction Machine MFM (V2) with supply, installation, testing, commissioning, and operator training
Minimum ISO/IEC 24734 speeds required for A4 mono/color and A3 mono/color
Auto duplex printing/copying enabled
Maximum scan area and document feeder specifications to be confirmed; at least standard flatbed plus ADF
BYPASS tray, multiple main paper trays, and essential connectivity (excluding Wi-Fi/Bluetooth per ATC)
Mandatory Make in India with explicit local content disclosure
EMD amount ₹21,000; payment terms tied to functional service centre proof
Delivery period adjustable up to 25% quantity variation with minimum 30 days
Delhi-only service centre requirement; 30-day post-award establishment window
Payment to be released after submission of functional Delhi service centre evidence; EMD ₹21,000 required with bid.
Delivery period linked to original delivery date; option to extend based on 25% quantity variation with minimum 30 days.
LD terms to be as per standard govt guidelines; penalties apply for late delivery and non-compliance with service-centre commitments.
Functional service centre located in Delhi or establishment planned within 30 days of award
Make in India compliant product with explicit local content disclosure
No Wi-Fi/Bluetooth enabled devices; non-China-made requirement met
Quantity
4
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
2 Days
Min. Avg. Annual Turnover
4
OEM Avg. Turnover
28
Past Performance
50 %
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Multifunction Machine MFM (V2) (Q2)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
10-Nov-2025, 11:30 am
Opening Date
10-Nov-2025, 12:00 pm
Extended Deadline
03-Nov-2025, 11:30 am
Opening Date
03-Nov-2025, 12:00 pm
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar MFMs or office automation equipment
Financial statements for the last 2–3 years
EMD submission document (₹21,000)
Technical bid document
OEM authorization / Make in India compliance certificate
Proof of functional Service Centre in Delhi or an establishment plan within 30 days of award
| Category | Specification | Requirement |
|---|---|---|
| Generic | Description of Stores | Multifunction Machine Printer with Minimum 1 Year On Site Warranty, including Cartridge and Power Cord/Adapter |
| Generic | Print Technology | Laser |
| Generic | Type of Printing | Monochrome (Black), Colour Or higher |
| Printing | Print Paper Size | A4, A3 and Legal |
| Printing | Minimum Print Speed per Minute as per ISO/IEC 24734 in A4 Size-Monochrome (Black) (in PPM) | 36 to 40, 41 to 45, 46 to 50, 51 to 55, 56 to 60, 61 to 65, 66 to 70, 71 to 80, 81 to 90, 91 to 100, 101 to 120, 121 to 140, 141 to 160, 161 to 180 Or higher |
| Printing | Minimum Print Speed per Minute as per ISO/IEC 24734 in A4 Size-Colour (in PPM) | Not Applicable, 1 to 5, 6 to 10, 11 to 15, 16 to 20, 21 to 25, 26 to 30, 31 to 35, 36 to 40, 41 to 45, 46 to 50, 51 to 55, 56 to 60, 61 to 65, 66 to 70, 71 to 80, 81 to 90, 91 to 100, 101 to 120, 121 to 140, 141 to 160, 161 to 180 Or higher |
| Printing | Minimum Speed per Minute as per ISO/IEC 24734 in A3 Size-Mono (in PPM) | 16 to 20, 21 to 25, 26 to 30, 31 to 35, 36 to 40, 41 to 45, 46 to 50, 51 to 55, 56 to 60, 61 to 65, 66 to 70, 71 to 80, 81 to 90 Or higher |
| Printing | Minimum Speed per Minute as per ISO/IEC 24734 in A3 Size-Color (in PPM) | Not Applicable, 1 to 5, 6 to 10, 11 to 15, 16 to 20, 21 to 25, 26 to 30, 31 to 35, 36 to 40, 41 to 45, 46 to 50, 51 to 55, 56 to 60, 61 to 65, 66 to 70, 71 to 80, 81 to 90 Or higher |
| Printing | Auto Duplexing Printing/Coping (2-sided Feature) | Yes Or higher |
| Scanning | Maximum Scan Area (Platen/Flatbed Size) | A4, A3 and Legal |
| PAPER HANDLING | Original Document Feeder Type (For Scanning and Copying) | Reverse/Duplex Automatic Document Feeders (RADF/DADF), Single-Pass Document Feeders (SPDF) Or higher |
| PAPER HANDLING | Number of Main Paper Tray | 2 |
| PAPER HANDLING | Bypass Tray Facility | Yes Or higher |
| Connectivity | Connectivity | USB Port, Ethernet Port |
Key insights about DELHI tender market
Submit the EMD ₹21,000 with your bid; include GST, PAN, experience certificates, financials, OEM authorization, and technical bid. Ensure Make in India compliance and Delhi service centre proof; replacement or extension requests fall under the 25% quantity option with minimum 30 days delivery.
Prepare GST certificate, PAN, 2–3 years financials, experience certificates for similar MFMs, EMD ₹21,000, OEM authorization, technical bid, and proof of a functional Delhi service centre or a plan to establish within 30 days of award.
Bidders must meet ISO/IEC 24734 minimum speeds for A4 mono/color and A3 mono/color; the exact ppm targets will be specified in the final bid document, and must be demonstrated during testing; duplex capability is mandatory.
Only Make in India compliant models with explicit local content disclosure are allowed; devices must not be China-made; supplier must provide local content details and establish a Delhi service centre if not existing at bid time.
Delivery is governed by the original delivery period with a potential 25% quantity increase/decrease; extended delivery time uses the formula (additional quantity/original quantity) × original period, minimum 30 days, subject to contract terms.
Bidder or OEM must have a functional service centre in Delhi; if not existing at bidding, establish within 30 days after award; payment release contingent on documentary proof of the service centre’s functionality.