Progress
Quantity
83
Category
BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.1
Bid Type
Two Packet Bid
A tender has been published for Indradhanush Gas Grid Limited Guwahati BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1. 1, BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1. 2, BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1. 3, BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1. 4, BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1. 5, BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1. 6, BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1. 7, BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1. 8, BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1. 9, BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1. 10. , BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1. 11 in KAMRUP, ASSAM. Quantity: 83 by. Submission Deadline: 17-01-2025 15: 00: 00. Check eligibility and apply.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.1 , BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.2 , BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.3 , BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.4 , BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.5 , BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.6 , BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.7 , BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.8 , BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.9 , BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.10. , BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.11
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.1
BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM
BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.2
BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM
BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.3
BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM
BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.4
BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM
BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.5
BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM
BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.6
BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM
BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.7
BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM
BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.8
BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM
BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.9
BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM
BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.10.
BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM
BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.11
BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.1 | BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM | 4 | nos | [email protected] | 168 | |
| 2 | BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.2 | BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM | 4 | nos | [email protected] | 168 | |
| 3 | BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.3 | BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM | 8 | nos | [email protected] | 168 | |
| 4 | BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.4 | BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM | 9 | nos | [email protected] | 168 | |
| 5 | BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.5 | BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM | 4 | nos | [email protected] | 168 | |
| 6 | BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.6 | BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM | 6 | nos | [email protected] | 168 | |
| 7 | BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.7 | BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM | 20 | nos | [email protected] | 168 | |
| 8 | BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.8 | BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM | 8 | nos | [email protected] | 168 | |
| 9 | BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.9 | BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM | 12 | nos | [email protected] | 168 | |
| 10 | BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.10. | BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM | 4 | nos | [email protected] | 168 | |
| 11 | BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.11 | BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM | 4 | nos | [email protected] | 168 |
Experience Criteria
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | CONTROL PLUS OIL AND GAS SOLUTIONS PRIVATE LIMITED Under PMA | - | 24-01-2025 12:26:31 | |
| 2 | GRAND PRIX ENGINEERING PRIVATE LIMITED Under PMA | - | 18-01-2025 16:08:43 | |
| 3 | VEEKAY VIKRAM & CO LLP Under PMA | - | 24-01-2025 11:28:58 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | VEEKAY VIKRAM & CO LLP(MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.1,BI DIRECTIONAL MOBILE SCRAPPER TRAP S | |
| L2 | GRAND PRIX ENGINEERING PRIVATE LIMITED (MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.1,BI DIRECTIONAL MOBILE SCRAPPER TRAP S | |
| L3 | CONTROL PLUS OIL AND GAS SOLUTIONS PRIVATE LIMITED (MSE)( MSE Social Category:General ) Under PMA | Item Categories : BI DIRECTIONAL MOBILE SCRAPPER TRAP SYSTEM AS PER MR ITEM 1.1,BI DIRECTIONAL MOBILE SCRAPPER TRAP S |
Please sign in or create an account to view contract details and download result documents.
Key insights about ASSAM tender market
The eligibility requirements include being a registered entity with the appropriate documentation. Bidders must verify compliance with the technical specifications outlined in the bid document and are required to provide supporting documentation if seeking exemption from the experience or turnover criteria.
Required documentation includes the Experience Criteria, additional documents requested in the ATC, and compliance documentation for the BOQ specifications. Any bid seeking exemption from turn-over criteria must submit supportive documentation during bid evaluation.
Yes, bidders must ensure they are registered with the GeM (Government e-Marketplace) platform. Proper registration includes robust verification of company details and submission of all necessary documentation aligned with the tender's expectations.
Documents must be submitted in specified formats as detailed in the tender guidelines, primarily PDFs and Excel files as outlined in the downloadable BOQ documents.
The technical specifications detail performance, safety standards, and design requirements, which must align with the rigorous parameters set forth within the scope of the tender. Refer to the specification document linked in the tender for detailed insights on requirements.
Bidders must adhere to quality standards that are consistent with industry benchmarks for bi-directional scrapper trap systems, ensuring safety and efficiency within pipeline operations.
Yes, compliance with local content mandates, as per the 'Make in India' policies, is critical. Bidders must demonstrate local value addition through appropriate certifications aligning with specified criteria.
The EMD required for this tender is ₹382,000. It must be submitted as part of the bidding process and is essential for ensuring the financial reliability of prospective bidders.
Yes, the winners will be required to submit a performance guarantee, often structured as an ePBG (Electronic Performance Bank Guarantee), which is usually 5% of the contract value.
Payment terms are usually outlined in the contract and subject to successful delivery, inspection, and signing off by the procurement authority.
The evaluation and selection process will be based on total value assessment, where bids are graded based on responsiveness to the BOQ, adherence to technical specifications, and price competitiveness.
Results will be communicated through official channels, typically following the conclusion of the evaluation process, providing bidders an update on their standing.
MSEs are eligible for specific exemptions regarding experience and turnover criteria provided they show relevant documentation during submission.
Startups do not receive exemptions under the experience or turnover categories in this tender; however, they are encouraged to participate in line with general bidding procedures.
This tender emphasizes local manufacturing by promoting products with minimum local content and favoring bids from companies that comply with the 'Make in India' framework.
Sign up now to access all documents
Main Document
OTHER
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS