TenderDekho Logo
GEM

Contract Bidding Open For Supply Installation Testing and Commission of Air Conditioners 01,Supply Installation Testing and C in BANGALORE, KARNATAKA

Bid Publish Date

27-Feb-2025, 3:35 pm

Bid End Date

20-Mar-2025, 4:00 pm

Progress

Issue27-Feb-2025, 3:35 pm
AwardPending
Explore all 5 tabs to view complete tender details

Quantity

207

Bid Type

Single Packet Bid

Categories 40

A tender has been published for Council Of Scientific And Industrial Research (csir) Supply Installation Testing and Commission of Air Conditioners 01, Supply Installation Testing and Commission of Air Conditioners 02, Supply Installation Testing and Commission of Air Conditioners 03, Supply Installation Testing and Commission of Air Conditioners 04, Supply Installation Testing and Commission of Air Conditioners 05, Supply Installation Testing and Commission of Air Conditioners 06, Supply Installation Testing and Commission of Air Conditioners 07, Supply Installation Testing and Commission of Air Conditioners 08, Supply Installation Testing and Commission of Air Conditioners 09, Supply Installation Testing and Commission of Air Conditioners 10, Supply Installation Testing and Commission of Air Conditioners 11, Supply Installation Testing and Commission of Air Conditioners 12 in BANGALORE, KARNATAKA. Quantity: 207 by. Submission Deadline: 20-03-2025 16: 00: 00. Check eligibility and apply.

Documents 4

GeM-Bidding-7581965.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Supply of Precision Air Conditioners 2 TR cooling capacity - UPS Room 1,Supply of Precision Air Con

Marketing Division

CHANDIGARH, CHANDIGARH

Posted: 14 July 2025
Closed: 28 July 2025
GEM

Supply cum installation of industrial air conditioners

Power Grid Corporation Of India Limited

SAHARANPUR, UTTAR PRADESH

Posted: 10 January 2025
Closed: 14 March 2025
GEM

Custom Bid for Services - Supply Installation Testing Commissioning of two Nos of Cassette Air Con

Oil And Natural Gas Corporation Limited

SOUTH 24 PARGANAS, WEST BENGAL

Posted: 26 February 2025
Closed: 14 April 2025
GEM

Supply, Installation and Commissioning of Package Air Conditioners as per detailed specification

Hindustan Aeronautics Limited (hal)

KORAPUT, ODISHA

Posted: 30 May 2025
Closed: 20 June 2025
GEM

Supply Installation Testing and Commissioning of 8.5TR Ductable Split Air Conditioning Units A,Supp

Centre For Development Of Telematics (c-dot)

BANGALORE, KARNATAKA

Posted: 15 September 2025
Closed: 13 October 2025
GEM

Bill of Quantities (BOQ) 12 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 Supply Installation Testing and Commission of Air Conditioners 01 VRF Out Door Units 10 HP with minimum 1 or more compressors 1 nos [email protected] 15
2 Supply Installation Testing and Commission of Air Conditioners 02 VRF Indoor Units 4 way Compact Cassette unit Supply of 1.0 Tr capacity 4-way flow VRV/VRF compact cassette type indoor ceiling mounted unit equipped with synthetic washable media pre-filter 4 nos [email protected] 15
3 Supply Installation Testing and Commission of Air Conditioners 03 Installation, Testing and commissioning of 6HP capacity factory built outdoor type air cooled variable refrigerant flow VRF 1 nos [email protected] 15
4 Supply Installation Testing and Commission of Air Conditioners 04 Installation, testing and commissioning of 4 way compact cassette type indoor units complete with panels, turbo fan, cooling coil with suitable rows, electronic expansion valves, air filter, in-built drain pump & insulated drain pan as per standard 1 Tr 5 nos [email protected] 15
5 Supply Installation Testing and Commission of Air Conditioners 05 Supply, Installation, Testing and Commission including pressure testing using nitrogen of 6.4mm dia with tube thickness 1.2 mm with 19mm thick insulation 14 meter [email protected] 15
6 Supply Installation Testing and Commission of Air Conditioners 06 Supply, Installation, Testing and Commission including pressure testing using nitrogen of 9.5mm dia with tube thickness 1.2 mm with 19mm thick insulation 32 meter [email protected] 15
7 Supply Installation Testing and Commission of Air Conditioners 07 Supply, Installation, Testing and Commission including pressure testing using nitrogen of 12.7mm dia with tube thickness 1.2 mm with 19mm thick insulation 14 meter [email protected] 15
8 Supply Installation Testing and Commission of Air Conditioners 08 Supply, Installation, Testing and Commission including pressure testing using nitrogen of 15.86mm dia with tube thickness 1.2 mm with 19mm thick insulation 9 meter [email protected] 15
9 Supply Installation Testing and Commission of Air Conditioners 09 Supply, Installation, Testing and Commission including pressure testing using nitrogen of 22.2mm dia with tube thickness 1.2 mm with 19mm thick insulation 23 meter [email protected] 15
10 Supply Installation Testing and Commission of Air Conditioners 10 Design, Manufacturing, Supply, Installation, Testing and Commission of variable refrigerent flow distribution REFNUTS 4 nos [email protected] 15
11 Supply Installation Testing and Commission of Air Conditioners 11 Supply, Laying, Dressing, Testing and Commssioning of communication cabling 70 meter [email protected] 15
12 Supply Installation Testing and Commission of Air Conditioners 12 Supply and Installation of CPVC for drain water pipe 32mm dia 30 meter [email protected] 15

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Certificate (Requested in ATC)

2

OEM Authorization Certificate

3

Additional Doc 1 (Requested in ATC)

4

Additional Doc 2 (Requested in ATC)

5

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Frequently Asked Questions

Key insights about KARNATAKA tender market

What are the eligibility requirements for participation in the tender?

The eligibility requirements include being a registered entity with proven experience in the supply and installation of air conditioning systems. Bidders must comply with specific industry standards and regulations set by the issuing department.

What certificates are required to apply for the tender?

Applicants are required to submit a range of certifications, including those that confirm their technical capabilities related to air conditioning installations, as well as financial stability certifications to demonstrate their capacity to fulfill the contract.

How can I register to participate in the tender process?

The registration process involves submitting necessary documentation digitally through the designated procurement platform. Bidders must ensure all requirements are met according to the guidelines issued, including relevant technical and financial documents.

What are the technical specifications one must adhere to during installation?

Bidders must adhere to various technical specifications that include providing energy-efficient models, complying with installation procedures as specified by the authority, and ensuring that all systems installed meet appropriate operational standards.

What special provisions are there for Micro, Small, and Medium Enterprises (MSEs)?

The tender recognizes the capabilities of MSEs by offering simplified application processes and additional benefits. This includes considerations during the evaluation phase to promote wider participation from smaller enterprises and startups, aligning with the government’s support of local industries.