TenderDekho Logo
Active GEM

Open Tender for installation operatrion and data transfer to varios Portals of Flowmeter Piezometer 1,installation in SAHARANPUR, UTTAR PRADESH

Bid Publish Date

14-Oct-2026, 5:53 pm

Bid End Date

26-Oct-2026, 4:00 pm

EMD

₹20,000

Value

₹9,95,000

Progress

Issue14-Oct-2026, 5:53 pm
AwardPending

N/a announces a tender for installation operatrion and data transfer to varios Portals of Flowmeter Piezometer 1, installation operatrion and data transfer to varios Portals of Flowmeter Piezometer 2, installation operatrion and data transfer to varios Portals of Flowmeter Piezometer 3, installation operatrion and data transfer to varios Portals of Flowmeter Piezometer 4, installation operatrion and data transfer to varios Portals of Flowmeter Piezometer 5, installation operatrion and data transfer to varios Portals of Flowmeter Piezometer 6, installation operatrion and data transfer to varios Portals of Flowmeter Piezometer 7 in SAHARANPUR, UTTAR PRADESH. Quantity: 21. Submission Deadline: 26-10-2026 16: 00: 00. Last date to apply is approaching fast!

Advertisement

Tender Data

Bid Details

Quantity

21

Category

installation operatrion and data transfer to varios Portals of Flowmeter Piezometer 1

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

80 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

installation operatrion and data transfer to varios Portals of Flowmeter Piezometer 1 , installation operatrion and data transfer to varios Portals of Flowmeter Piezometer 2 , installation operatrion and data transfer to varios Portals of Flowmeter Piezometer 3 , installation operatrion and data transfer to varios Portals of Flowmeter Piezometer 4 , installation operatrion and data transfer to varios Portals of Flowmeter Piezometer 5 , installation operatrion and data transfer to varios Portals of Flowmeter Piezometer 6 , installation operatrion and data transfer to varios Portals of Flowmeter Piezometer 7

Advisory Bank

PUNJAB NATIONAL BANK

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Saharanpur

Delivery Pincodes

247452

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Narendra Kumar247452,KISAN SAHKARI CHINI MILLS LTD.,NANAUTA SAHARANPUR PIN CODE- 247452 GST NO - 09AAAAK0211G1Z9 Contact no- 9044889387,9719316129SaharanpurUttar Pradesh247452315-

Authority Records

UTTAR PRADESH COOPERATIVE SUGAR FACTORIES FEDERATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-10036694.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

N/a

Office Name

Lucknow

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 7 Items Sign in for GEM prices

#1

installation operatrion and data transfer to varios Portals of Flowmeter Piezometer 1

Electro Magnetic Water Flow Meter With PLC and Lot Tlemetry integration SCADA Mimic display remote disply with Central data storage flow management and reqorting software and all Mounting hardware flange etc flow meter Size 2 inch

3 nos Delivery: 15 days
#2

installation operatrion and data transfer to varios Portals of Flowmeter Piezometer 2

Electro Magnetic Water Flow Meter With PLC and Lot Tlemetry integration SCADA Mimic display remote disply with Central data storage flow management and reqorting software and all Mounting hardware flange etc flow meter Size 3 inch

2 nos Delivery: 15 days
#3

installation operatrion and data transfer to varios Portals of Flowmeter Piezometer 3

Electro Magnetic Water Flow Meter With PLC and Lot Tlemetry integration SCADA Mimic display remote disply with Central data storage flow management and reqorting software and all Mounting hardware flange etc flow meter Size 4 inch

6 nos Delivery: 15 days
#4

installation operatrion and data transfer to varios Portals of Flowmeter Piezometer 4

Electro Magnetic Water Flow Meter With PLC and Lot Tlemetry integration SCADA Mimic display remote disply with Central data storage flow management and reqorting software and all Mounting hardware flange etc flow meter Size 6 inch

4 nos Delivery: 15 days
#5

installation operatrion and data transfer to varios Portals of Flowmeter Piezometer 5

Supply of required nodal host controler PLC and Local HMI Penel Per Process station e g ETP Boiler House Boling House with Communication cable

3 nos Delivery: 15 days
#6

installation operatrion and data transfer to varios Portals of Flowmeter Piezometer 6

Ultrasonic open chennel flow meter for open drain with V Notch Parshall flume with PLC and Lot Tlemetry integration remote display with central management and reporting Software

2 nos Delivery: 15 days
#7

installation operatrion and data transfer to varios Portals of Flowmeter Piezometer 7

For non DCS plant complted Computer system for central data display and Scada Congiguration Memory Minimum 8 GB Processor Minimum 256 GB SSD OS Windows 10 and above Enabled with Wi fi lan Port With Mouse Keyboard Monitor and UPS

1 no Delivery: 15 days

Categories 32

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

4

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement