Government Tender Published for Attending to break down calls for power supply intrruption of exchange,Replacement of faulty lighte in MUZAFFARPUR, BIHAR

Bid Publish Date

10-Jul-2026, 4:09 pm

Bid End Date

03-Aug-2026, 4:00 pm

Value

₹22,01,785

Progress

Issue10-Jul-2026, 4:09 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

1415

Category

Refurbishmentburnt burnt out 16 kva and 25kva al wound transformer

Bid Type

Two Packet Bid

A tender has been published for Bharat Sanchar Nigam Limited Portal(bsnl) Attending to break down calls for power supply intrruption of exchange, Replacement of faulty lightening arrestors, Replacement of unserviceable gang operated air break switch by new one, Replacement of faulty 11kv outdoor type cable end terminations, Supplying and laying of 30 sqmm acsr weasel conductor, Replacement of faulty 63a Switch fuse Unit, Replacement of 63 amp capacity faulty rewireable prcelin fuse set, Replacement of 100 amp capacity faulty rewireable prcelin fuse set, Replacement of faulty damaged pin insulators by new one, Replacement of faulty damaged 11 KV disc insulators, Dismantling different ratings faulty transformer, Refurbishmentburnt burnt out 16 kva and 25kva al wound transformer, Refurbishmentburnt burnt out 63 kva al wound transformer, Refurbishmentburnt burnt out 63kva cu wound transformer, To and fro transportation charges for spare transformer, Supplying and laying of 3 core 50 sqmm ab cable of 11 kv, Replacement of faulty cables by new one of 4 core lt, Supplying making of end termination for 4 core lt ab in MUZAFFARPUR, BIHAR. Quantity: 1415 by. Submission Deadline: 03-08-2026 16: 00: 00. Check eligibility and apply.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Attending to break down calls for power supply intrruption of exchange , Replacement of faulty lightening arrestors , Replacement of unserviceable gang operated air break switch by new one , Replacement of faulty 11kv outdoor type cable end terminations , Supplying and laying of 30 sqmm acsr weasel conductor , Replacement of faulty 63a Switch fuse Unit , Replacement of 63 amp capacity faulty rewireable prcelin fuse set , Replacement of 100 amp capacity faulty rewireable prcelin fuse set , Replacement of faulty damaged pin insulators by new one , Replacement of faulty damaged 11 KV disc insulators , Dismantling different ratings faulty transformer , Refurbishmentburnt burnt out 16 kva and 25kva al wound transformer , Refurbishmentburnt burnt out 63 kva al wound transformer , Refurbishmentburnt burnt out 63kva cu wound transformer , To and fro transportation charges for spare transformer , Supplying and laying of 3 core 50 sqmm ab cable of 11 kv , Replacement of faulty cables by new one of 4 core lt , Supplying making of end termination for 4 core lt ab

Advisory Bank

PUNJAB NATIONAL BANK

ePBG Percentage

5%

ePBG Duration (Months)

18

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

547

Delivery Locations

1

Delivery Cities

Muzaffarpur

Delivery Pincodes

842001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Manoj Kumar842001,Ist floor ,old canteen building, main TE campus company bagh muzaffarpurMuzaffarpurBihar84200130547-

Authority Records

MINISTRY OF COMMUNICATIONSTELECOMMUNICATIONS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9589576.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 18 Items Sign in for GEM prices

#1

Attending to break down calls for power supply intrruption of exchange

Pdg physical inspection and taking corrective measures for restoration the fault etc

30 jobs Delivery: 547 days
#2

Replacement of faulty lightening arrestors

Suitable for 3 wire 11 kV overhead lines with rated voltage etc as reqd

5 sets Delivery: 547 days
#3

Replacement of unserviceable gang operated air break switch by new one

With earthing wire and operating handle etc complete as reqd

5 nos Delivery: 547 days
#4

Replacement of faulty 11kv outdoor type cable end terminations

By new one of heat shrinkable type complete with all accessories

10 nos Delivery: 547 days
#5

Supplying and laying of 30 sqmm acsr weasel conductor

With interconnection of all insulators gang operator air break switch etc as reqd

150 mtrs Delivery: 547 days
#6

Replacement of faulty 63a Switch fuse Unit

With 3 nos porcelain fuse links and neutral link etc as reqd

5 jobs Delivery: 547 days
#7

Replacement of 63 amp capacity faulty rewireable prcelin fuse set

With base by new one etc complete as reqd

10 sets Delivery: 547 days
#8

Replacement of 100 amp capacity faulty rewireable prcelin fuse set

Complete with base by new one etc as reqd

10 sets Delivery: 547 days
#9

Replacement of faulty damaged pin insulators by new one

With11 kv grade pin type insulator large steel head etc complete as reqd

30 nos Delivery: 547 days
#10

Replacement of faulty damaged 11 KV disc insulators

By new one for 11 kv overhead lines with galvanized insulator fittings etc

10 nos Delivery: 547 days
#11

Dismantling different ratings faulty transformer

From the existing dp structure for necessary repairing

30 jobs Delivery: 547 days
#12

Refurbishmentburnt burnt out 16 kva and 25kva al wound transformer

With suitable size of primary and secondary winding wire etc complete as reqd

20 jobs Delivery: 547 days
#13

Refurbishmentburnt burnt out 63 kva al wound transformer

With suitable capacity of primary and secondary winding wire etc complete as reqd

5 jobs Delivery: 547 days
#14

Refurbishmentburnt burnt out 63kva cu wound transformer

With suitable capacity of winding wire etc complete as reqd

5 jobs Delivery: 547 days
#15

To and fro transportation charges for spare transformer

Suitable capacity from bsnl office to respective sites etc as reqd

30 jobs Delivery: 547 days
#16

Supplying and laying of 3 core 50 sqmm ab cable of 11 kv

Capacity along with acsr etc complete as reqd

300 mtrs Delivery: 547 days
#17

Replacement of faulty cables by new one of 4 core lt

Aerial bunched aluminium Cable of size 25 sq.mm etc coplete as reqd

700 mtrs Delivery: 547 days
#18

Supplying making of end termination for 4 core lt ab

Aluminium cable of size 25 sq.mm of 1100 V grade etc complete as reqd

60 sets Delivery: 547 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Additional Doc 3 (Requested in ATC)

10

Additional Doc 4 (Requested in ATC)

11

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

12

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer