BLADE WIPER ASSY,BRAKE SHOE REAR,FAN BELT,SPEEDOMETER CABLE,HORN ASSY LOW,FUSE 15 AMP,KING PIN BUSH
Indian Army
BARAMULLA, JAMMU & KASHMIR
Progress
Quantity
19
Category
Wiper Motor
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, located in Ambala, Haryana (133001), is seeking supply of automotive spare parts covering items such as Wiper Motor, Clutch Assembly, Wiper Blade Rear, AC Belt, Timing Belt, Tail Gate Catch Assembly, Suction Hose, Pad Assembly Kit, Fan Belt, Magnetic Beacon, and Fuse Box. The BOQ lists 11 items, with quantities not disclosed in the available text. The buyer reserves a 25% quantity variance during contract Award and currency, plus a prorated extension of delivery time with a minimum 30 days, calculated as (Increased quantity ÷ Original quantity) × Original delivery period. This tender appears to focus on robust automotive component provisioning for military fleet support.
Key differentiator: the explicit option clause enabling up to 25% quantity variation during and post-contract, with extension logic tied to original delivery periods. Unique context: procurement pertains to multiple automotive subsystems under a single contract window where delivery scheduling flexibility is codified in the terms. No start/end dates or EMD values are provided in the available data, and the exact scope remains defined by the 11 BOQ items.
Product/service names and categories: Wiper Motor, Clutch Assembly, Wiper Blade Rear, AC Belt, Timing Belt, Tail Gate Catch Assembly, Suction Hose, Pad Assembly Kit, Fan Belt, Magnetic Beacon, Fuse Box
Quantities: Not disclosed in available text; 11 items in BOQ
Estimated value/EMD: Not disclosed in provided tender data
Delivery location: Ambala, Haryana 133001
Experience/eligibility: Not specified in excerpt; infer standard defense supplier criteria
Standards/quality: Not specified in excerpt; bidders should anticipate IS/ISO compliance requirements typical for defense supply
Option clause allows ±25% quantity change during contract and currency with proportional delivery time recalculation
Delivery period minimum 30 days; extended delivery time formula applies
11 BOQ items with undisclosed quantities; final contract scope to be defined in bid documents
Compliance with Buyer Added Terms and Conditions is mandatory
EMD, payment terms, and start/end dates are not disclosed in the available data
Not disclosed in the provided tender data; bidders should expect standard defense procurement payment terms in final bid documents
Delivery period adjusts with option clause; minimum 30 days; period calculated as (Increased quantity ÷ Original quantity) × Original delivery period
Not specified in the available text; bidders should review final T&C for LDs or performance bonds
Eligibility for supplying automotive spare parts to defense units
Capability to manage multi-item lead times under a single contract
Demonstrated experience in automotive components supply and logistics
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
JAMMU, JAMMU & KASHMIR
Indian Army
Indian Army
TAWANG, ARUNACHAL PRADESH
Indian Army
BARAMULLA, JAMMU & KASHMIR
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Wiper Motor | STLN | 3 | nos | lkgurjar | 15 |
| 2 | Clutch Assy Fan | MG | 2 | nos | lkgurjar | 15 |
| 3 | Wiper Blade Rear | TATA SAFARI | 1 | nos | lkgurjar | 15 |
| 4 | AC Belt | TATA SAFARI | 1 | nos | lkgurjar | 15 |
| 5 | Timing Belt | TATA SAFARI | 1 | nos | lkgurjar | 15 |
| 6 | Tail Gate Catch Assy | TATA SAFARI | 1 | nos | lkgurjar | 15 |
| 7 | Suction Hose | TATA SAFARI | 1 | nos | lkgurjar | 15 |
| 8 | Kit Pad Assy | TATA SAFARI | 1 | nos | lkgurjar | 15 |
| 9 | Fan Belt | TATRA | 3 | nos | lkgurjar | 15 |
| 10 | Magnetic Beacon | TATRA | 3 | nos | lkgurjar | 15 |
| 11 | Fuse Box | KRZ | 2 | nos | lkgurjar | 15 |
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar automotive spare parts supply
Financial statements (latest audited or management accounts)
EMD/Security deposit documentation (as applicable per procurement norms)
Technical bid documents indicating compliance with product categories
OEM authorizations or dealership/distributor authorization (if applicable)
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | BALAJI TRADING COMPANY Under PMA | - | 12-02-2026 14:02:45 | Qualified |
| 2 | NATIONAL INFOTECH SERVICES Under PMA | - | 12-02-2026 13:37:38 | Qualified |
| 3 | VICTOR SERVICE MEDIA Under PMA | - | 12-02-2026 14:35:06 | Qualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | NATIONAL INFOTECH SERVICES(MSE,MII)( MSE Social Category:General ) Under PMA | ₹49,391 | Item Categories : Wiper Motor,Clutch Assy Fan,Wiper Blade Rear,AC Belt,Timing Belt,Tail Gate Catch Assy,Suction Hose, |
| L2 | BALAJI TRADING COMPANY (MSE,MII)( MSE Social Category:General ) Under PMA | ₹54,500 | Item Categories : Wiper Motor,Clutch Assy Fan,Wiper Blade Rear,AC Belt,Timing Belt,Tail Gate Catch Assy,Suction Hose, |
| L3 | VICTOR SERVICE MEDIA (MSE,MII)( MSE Social Category:General ) Under PMA | ₹57,845 | Item Categories : Wiper Motor,Clutch Assy Fan,Wiper Blade Rear,AC Belt,Timing Belt,Tail Gate Catch Assy,Suction Hose, |
Key insights about HARYANA tender market
Bidders should submit GST, PAN, experience certificates, financial statements, and EMD along with technical bids. Ensure OEM authorizations if required and confirm the 25% quantity variance option during contract. Review final bid documents for exact EMD amount and delivery milestones.
Prepare GST certificate, PAN card, experience certificates for similar parts, latest financial statements, EMD proof, technical compliance information, and any OEM authorization. Ensure items match the catalog: Wiper Motor, Clutch Assembly, Wiper Blade Rear, etc., with delivery capabilities.
The tender excerpt does not list explicit standards. Prepare to meet typical defense supply standards and IS/ISO compliance as applicable to automotive components, and verify if IS 550 or other standards are required in final documents.
Delivery time can extend if quantity increases by up to 25% during contract or currency. The new period uses the formula (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days.
The BOQ lists 11 items including Wiper Motor, Clutch Assembly, Wiper Blade Rear, AC Belt, Timing Belt, Tail Gate Catch Assembly, Suction Hose, Pad Assembly Kit, Fan Belt, Magnetic Beacon, and Fuse Box; exact quantities are not provided in the excerpt.
Submit organizational credentials, experience in similar supply to defense or government bodies, robust financials, GST/PAN, and any OEM authorizations. Confirm capability to deliver multiple parts (11 listed categories) within the final contract terms.
The provided data does not specify payment terms; check final tender documents for advance payment, milestone payments, and retention or LD clauses. Prepare to align with standard defense procurement payment practices and documentary requirements.
Provide evidence of past deployment or supply of automotive spare parts to large fleets, financial stability, manufacturing or distribution capacity, and quality control processes. Include OEM authorizations and service support capabilities if relevant.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS