Bid Publish Date
16-Sep-2026, 4:03 pm
Bid End Date
26-Sep-2026, 5:00 pm
Location
Progress
Organization: Uttarakhand Electricity Regulatory Commission (State Electricity Regulatory Commission). Product category: A4 and Legal Size Multifunction Printer (MFP). Location: Dehradun, Uttarakhand. Scope: Supply, Installation, Testing and Commissioning of MFPs; bid price should cover all components. Delivery terms: option to increase quantity by 25% during contract; additional time calculated as (increase/original) × original delivery period with a minimum of 30 days. Context: procurement via GEM portal; execution hinges on adherence to option clause and delivery timelines.
Option to adjust quantity by 25% during/after contract
Delivery time scales with extended delivery period formula
Scope includes Supply, Installation, Testing and Commissioning
Not specified in tender text; standard GEM terms may apply post acceptance
Delivery period linked to original delivery date; extended period proportionate to quantity change with a minimum 30 days
Not specified in provided terms; penalties, if any, would be detailed in Buyer Added Terms
Registered vendor with GST and PAN
Experience in supply/installation of office MFP equipment
Ability to meet GEM procurement process and OEM approvals
Quantity
6
Bid Type
Two Packet Bid
Bid Validity
45 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Experience Required
1 Year (s)
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
A4 and Legal Size Multifunction Printer (MFP) (Q2)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Dehradun
Delivery Pincodes
248171
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Mukesh Verma | 248171,UTTARAKHAND ELECTRICITY REGULATORY COMMISSION,VIDYUT NIYAMAK BHAWAN,NEAR ISBT,PO MAJRA,DEHRADUN | Dehradun | Uttarakhand | 248171 | 6 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar MFP deployments
Financial statements (latest audited)
EMD submission document (as per terms)
Technical bid submission document
OEM authorization / reseller certificate (if applicable)
Key insights about UTTARAKHAND tender market
Bidders must register with GEM, obtain GST and PAN, prepare EMD documents, and submit a technical bid along with OEM authorization if applicable. The scope covers Supply, Installation, Testing and Commissioning of A4/Legal Size MFPs. Ensure compliance with the option clause allowing up to 25% quantity changes.
Required documents include GST certificate, PAN, latest audited financials, experience certificates for similar MFP deployments, EMD submission, technical bid, and OEM authorization if bidding as an authorized distributor. Prepare soft copies as per GEM bid submission guidelines.
Delivery timelines are tied to the original delivery period, with the option to extend proportionally to quantity changes. Minimum extended delivery time is 30 days. The contract scope includes Supply, Installation, Testing and Commissioning, so ensure installation readiness at Dehradun site.
Tender data does not specify standards; bidders should prepare MFPs meeting typical office equipment norms and ensure OEM support. When available, provide device compatibility, warranty terms, and service levels aligned with standard office automation equipment.
The tender text does not provide explicit dates. Bidders should monitor the GEM portal for the notice, verify the Start/End dates, and follow the online submission workflow precisely to avoid late submission penalties.
Scope includes Supply, Installation, Testing and Commissioning of A4 and Legal Size MFP devices. Bidders must include all costs in bid prices, coordinate on-site installation in Dehradun, and ensure post-installation support aligns with contract requirements.
The buyer may increase or decrease order quantity up to 25% at contract placement and during currency. The delivery extension formula uses (increase/original) × original delivery period with a 30-day minimum, so plan buffers and supplier capacity accordingly.