TenderDekho Logo
GEM

Uttar Pradesh Power Corporation Limited UPPCL 11 KV/ LT Line Material and Safe Carriage Tender Etah 2026

Bid Publish Date

03-Jul-2026, 7:55 pm

Bid End Date

18-Jul-2026, 8:00 pm

EMD

₹19,000

Value

₹19,00,000

Progress

Issue03-Jul-2026, 7:55 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

12710

Category

Erection of 11 M STP Single Support

Bid Type

Two Packet Bid

Categories 67

Tender Overview

Organizatio​n: Uttar Pradesh Power Corporation Limited (UPPCL) — Energy Department, Etah, Uttar Pradesh 207001. Procurement scope: Supply and safe carriage of 11 KV line materials, LT line materials, XLPE cables, and related erection and dismentalling works; includes multiple item categories such as line material supply, safe carriage, and various erection activities. Estimated value: ₹1,900,000 with EMD ₹19,000. Geography: Etah district, Uttar Pradesh. Delivery considerations: Option clause allows up to 25% quantity fluctuation; delivery period calculable from the last date of the original delivery order with minimum 30 days extension. Aimed at qualified bidders capable of handling electrical infrastructure materials and on-site erection tasks.

Technical Specifications & Requirements

  • Bill of quantities (BOQ) comprises 74 items across supply, safe carriage, and erection activities (detailed item specifics not provided).
  • Material types include 11 KV line components, LT line materials, XLPE cables, HDPE conduits, GI components, earth clamps, and safety hardware.
  • Standards/Certifications: Not specified in the public data; bidders may need to confirm IS norms with the buyer’s ATC documents.
  • Delivery/Installation: On-site erection, laying of XLPE cables, joining kits, and protective fittings; on-site safety and support infrastructure implied by “Service & Support” terms.
  • Security/Payment: EMD of ₹19,000; performance security via PBG or FDR with conditions; bidder to provide dedicated service support and escalation matrix.

Terms, Conditions & Eligibility

  • Option Clause: Purchaser may increase or decrease quantity up to 25% at contracted rates; extended delivery time based on the formula (additional quantity/original quantity) × original delivery period, minimum 30 days.
  • Financial Standing: Bidder must not be under liquidation or bankruptcy; an Undertaking to that effect is required.
  • Security Deposit: Performance security via PBG or FDR in the seller’s name with release conditions; original FDR to be delivered within 15 days of award.
  • Support: Bidders must provide a dedicated toll-free service number and an escalation matrix for service support.
  • Documentation: Compliance with all PQC and ATC terms; submission of scanned FDR and hard copy to be delivered.

Key Specifications

  • Product/service names: 11 KV line materials, LT line materials, XLPE cables, and related erection/laying services

  • Quantities/values: Estimated value ₹1,900,000; EMD ₹19,000

  • Experience: Prior experience in electrical line material supply and erection works recommended

  • Standards: IS/IEC standards not explicitly listed; verify with ATC documents

  • Delivery: On-site erection, safe carriage, and laying duties as per contract

Terms & Conditions

  • Option clause allows ±25% quantity changes at contract stage

  • FDR-based or PBG security; original FDR due within 15 days of award

  • Dedicated service support and escalation matrix required

  • Strict non-liquidation/bankruptcy proof and financial standing

  • Delivery period linked to last DO date with minimum 30 days extension

Important Clauses

Payment Terms

Payment terms not explicitly stated; security deposits via PBG or FDR; delivery time adjustments governed by option clause

Delivery Schedule

Delivery period calculated from last date of original delivery order; extended time formula applies with minimum 30 days

Penalties/Liquidated Damages

Penalties details not provided in public data; ATC may include LDs for late delivery

Bidder Eligibility

  • Not under liquidation, receivership, or bankruptcy

  • Demonstrable experience in electrical line materials supply and erection

  • Ability to provide EMD and complete submission per T&Cs with FDR/PBG options

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Supply of 11 KV Line Material , Supply of LT Line Material , Safe Carriage of 11 KV Line Material , Safe Carriage of 11 M STP , Safe Carriage of 11 KV XLPE Cable , Erection of 11 M STP Single Support , Erection of 11 M STP Section Pole , Erection of 11 M STP Double Pole , Dismentalling old Weseal Conductor , Laying ACSR Weseal Conductor , Dismentalling old ACSR Rabbit Conductor , Laying ACSR Rabbit Conductor , Laying of 11 KV XLPE Cable , Fixing of HDPE Pipe with XLPE Cable , Fixing of Cable Jointiong Kit , Fixing of GI Pipe , Erection of Stone Pad , Erection of Barbed Wire , Erection of F Clamp , Erection of Danger Board , Erection of PG Clamp , Erection of Holding Clamp , Laying of GI Wire 8 SWG , Laying of GI Wire 10 SWG , Erection of Earthing Complete , Erection of Stay Set Complete , Safe Carriage of Dismantilled Material , Safe Carriage of LT Line Material , Safe Carriage of LT XLPE Cable , Safe Carriage of LT AB Cable , Erection of LT XLPE Cable , Dismentalling of LT AB Cable , Erection of LT AB Cable , Fixing of Distribution Box with Clamp , Safe carriage of dismantilled LT AB Cable

Authority Records

ENERGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9543218.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 74 Items Sign in for GEM prices

#1

Supply of 11 KV Line Material

Stone Pad 300x300x75 mm

40 no Delivery: 30 days
#2

Supply of 11 KV Line Material

Barbed Wire

80 kg Delivery: 30 days
#3

Supply of 11 KV Line Material

Danger Board with Clamp

37 no Delivery: 30 days
#4

Supply of 11 KV Line Material

MS T off Channel with Clamp

1 no Delivery: 30 days
#5

Supply of 11 KV Line Material

Top Channel 100x50x2240 mm

9 no Delivery: 30 days
#6

Supply of 11 KV Line Material

MS Dropper Channel

2 no Delivery: 30 days
#7

Supply of 11 KV Line Material

F Clamp

21 no Delivery: 30 days
#8

Supply of 11 KV Line Material

PG Clamp

48 no Delivery: 30 days
#9

Supply of 11 KV Line Material

Holding Clamp

21 no Delivery: 30 days
#10

Supply of 11 KV Line Material

MS Angle 75x75x6x2028 mm (with clamp and nut and bolts TF Base angle)

2 no Delivery: 30 days
#11

Supply of 11 KV Line Material

Guarding Angle with Clamp

27 no Delivery: 30 days
#12

Supply of 11 KV Line Material

Nut and Bolts with Washer

5 kg Delivery: 30 days
#13

Supply of 11 KV Line Material

Clamp with Nut and Bolts

106 no Delivery: 30 days
#14

Supply of 11 KV Line Material

MS Cross Bracing Angle

8 set Delivery: 30 days
#15

Supply of 11 KV Line Material

Red Oxide Paints

42 l Delivery: 30 days
#16

Supply of 11 KV Line Material

Allunimum Paints

40 l Delivery: 30 days
#17

Supply of 11 KV Line Material

Number Plate

34 no Delivery: 30 days
#18

Supply of 11 KV Line Material

E Bracket

24 no Delivery: 30 days
#19

Supply of 11 KV Line Material

GI Pipe 6 inch Dia

44 m Delivery: 30 days
#20

Supply of 11 KV Line Material

HDPE Pipe 120 mm

282 m Delivery: 30 days
#21

Supply of 11 KV Line Material

Allunimum Lug

4 no Delivery: 30 days
#22

Supply of LT Line Material

Stone Pad 300x300x75 mm

27 no Delivery: 30 days
#23

Supply of LT Line Material

GI Pipe 6 inch Dia

24 m Delivery: 30 days
#24

Supply of LT Line Material

HDPE Pipe 120 mm

60 m Delivery: 30 days
#25

Supply of LT Line Material

Distribution Box Clamp

19 no Delivery: 30 days
#26

Supply of LT Line Material

Clamp with Nut and Bolts

10 no Delivery: 30 days
#27

Supply of LT Line Material

Pricing Connector A&B Type

38 no Delivery: 30 days
#28

Supply of LT Line Material

Suspension Clamp

33 no Delivery: 30 days
#29

Supply of LT Line Material

I Hook

23 no Delivery: 30 days
#30

Supply of LT Line Material

Dead End Clamp

12 no Delivery: 30 days
#31

Safe Carriage of 11 KV Line Material

Safe carriage of line material from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side.

15 qtl Delivery: 30 days
#32

Safe Carriage of 11 M STP

Safe carriage of 11 Mtr Long ST pole from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side.

40 no Delivery: 30 days
#33

Safe Carriage of 11 KV XLPE Cable

Safe carriage of 11KV XLPE Cable 3x120 sq. mm from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side.

250 m Delivery: 30 days
#34

Safe Carriage of 11 KV XLPE Cable

Safe carriage of 11KV XLPE Cable 3x70 sq. mm from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side.

80 m Delivery: 30 days
#35

Erection of 11 M STP Single Support

Erection of 11 mtr ST Pole as single support including fixing of all HT/LT accessories etc. complet, pole should be grouted properly as per DVVNL/RESPO norms.

22 no Delivery: 30 days
#36

Erection of 11 M STP Section Pole

Erection of 11 mtr Long ST Pole as Section Pole including fixing of all HT/LT accessories etc. complete. Pole should be grouted properly as per DVVNL/RESPO norms.

8 no Delivery: 30 days
#37

Erection of 11 M STP Double Pole

Erection of 11 mtr Long ST Pole as Double Pole including fixing of all HT/LT accessories etc. complete with TPMO, pole should be grouted properly as per DVVNL/RESPO norms.

1 no Delivery: 30 days
#38

Dismentalling old Weseal Conductor

Dismentalling of old ACSR Weseal Conductor stacking of proper place.

2,700 m Delivery: 30 days
#39

Laying ACSR Weseal Conductor

Laying, sagging stringing, binding, jumpering & fixing of all accessories etc of ACSR Weseal Conductor on the newly/old erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work.

2,920 m Delivery: 30 days
#40

Dismentalling old ACSR Rabbit Conductor

Dismentalling of old ACSR Rabbit Conductor stacking of proper place.

810 m Delivery: 30 days
#41

Laying ACSR Rabbit Conductor

Laying, sagging stringing, binding, jumpering & fixing of all accessories etc of ACSR Rabbit Conductor on the newly/old erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work.

840 m Delivery: 30 days
#42

Laying of 11 KV XLPE Cable

Laying of 11 KV XLPE Cable 3x120 sq. mm. on the newly/old erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work.

28 m Delivery: 30 days
#43

Laying of 11 KV XLPE Cable

Laying of 11 KV XLPE Cable 3x70 sq. mm. on the newly/old erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work.

50 m Delivery: 30 days
#44

Fixing of HDPE Pipe with XLPE Cable

Fixing of HDPE Pipe 120 mm Dia for U/G laying of 11 KV XLPE Cable 3x120 sq mm with laid by HDD method including cable laying

252 m Delivery: 30 days
#45

Fixing of HDPE Pipe with XLPE Cable

Fixing of HDPE Pipe 120 mm Dia for U/G laying of 11 KV XLPE Cable 3x70 sq mm with laid by HDD method including cable laying

30 m Delivery: 30 days
#46

Fixing of Cable Jointiong Kit

Fixing of 3x120 XLPE Cable Jointing Kit outdoor

8 no Delivery: 30 days
#47

Fixing of Cable Jointiong Kit

Fixing of 3x70 XLPE Cable Jointing Kit outdoor

4 no Delivery: 30 days
#48

Fixing of GI Pipe

Fixing of GI Pipe 6 inch Dia

44 no Delivery: 30 days
#49

Erection of Stone Pad

Fixing of Stone Pad 300x300x75 mm

40 no Delivery: 30 days
#50

Erection of Barbed Wire

Fixing of Barbed Wire

80 kg Delivery: 30 days
#51

Erection of F Clamp

Fixing of F Clamp

21 no Delivery: 30 days
#52

Erection of Danger Board

Fixing of Danger Board with Clamp

37 no Delivery: 30 days
#53

Erection of PG Clamp

Fixing of PG Clamp

48 no Delivery: 30 days
#54

Erection of Holding Clamp

Fixing of Holding Clamp

21 no Delivery: 30 days
#55

Laying of GI Wire 8 SWG

Laying of GI Wire 6 SWG all complete assoceries

371 kg Delivery: 30 days
#56

Laying of GI Wire 10 SWG

Laying of GI Wire 8 SWG all complete assoceries

186 kg Delivery: 30 days
#57

Erection of Earthing Complete

Erection of Earthing Complete

42 no Delivery: 30 days
#58

Erection of Stay Set Complete

Fixing of Stay set complete including the work of nozzling etc.

59 no Delivery: 30 days
#59

Safe Carriage of Dismantilled Material

Safe carriage of dismantilled material (Cross Arm, Clamp, F Clamp, Top Channel/Weseal Conductor & other accessories etc.) from the pit side to the store distance 0 to 60 Km. with loading & unloading at both ends and proper stacking in store.

10 qtl Delivery: 30 days
#60

Safe Carriage of LT Line Material

Safe carriage of line material from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side.

3 qtl Delivery: 30 days
#61

Safe Carriage of 11 M STP

Safe carriage of 11 Mtr Long ST pole from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side.

27 no Delivery: 30 days
#62

Safe Carriage of LT XLPE Cable

Safe carriage of LT XLPE cable 3x120 sq. mm from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side.

160 m Delivery: 30 days
#63

Safe Carriage of LT AB Cable

Safe carriage of LT AB cable 3x95 sq. mm from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side.

580 m Delivery: 30 days
#64

Safe Carriage of LT AB Cable

Safe carriage of LT AB cable 1x16+1x25 sq. mm from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side.

265 m Delivery: 30 days
#65

Erection of LT XLPE Cable

Laying, sagging stringing, binding, jumpering & fixing of all accessories etc of LT XLPE cable 3x120 sq. mm on the newly/old erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work.

100 m Delivery: 30 days
#66

Dismentalling of LT AB Cable

Dismentalling of LT AB cable 3x50+1x35+1x16 sq. mm stacking of proper place.

450 m Delivery: 30 days
#67

Erection of LT AB Cable

Laying, sagging stringing, binding, jumpering & fixing of all accessories etc of LT AB cable 3x95 sq. mm on the newly/old erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work.

580 m Delivery: 30 days
#68

Erection of LT AB Cable

Laying, sagging stringing, binding, jumpering & fixing of all accessories etc of LT AB cable 1x16+1x25 sq. mm on the newly/old erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work.

265 m Delivery: 30 days
#69

Fixing of HDPE Pipe with XLPE Cable

Fixing of HDPE Pipe 120 mm Dia for U/G laying of 11 KV XLPE Cable 3x120 sq mm with laid by HDD method including cable laying

60 m Delivery: 30 days
#70

Fixing of Distribution Box with Clamp

Fixing of 3 Ph Distribution with Box Clamp

19 no Delivery: 30 days
#71

Fixing of GI Pipe

Fixing of GI Pipe 6 inch Dia

24 m Delivery: 30 days
#72

Erection of Earthing Complete

Erection of Earthing Complete

27 no Delivery: 30 days
#73

Erection of Stay Set Complete

Fixing of Stay set complete including the work of nozzling etc.

5 no Delivery: 30 days
#74

Safe carriage of dismantilled LT AB Cable

Safe carriage of dismantilled material (Cable/Clamp and other assoceries) from the pit side to the store distance 0 to 60 Km. with loading & unloading at both ends and proper stacking in store.

5 qtl Delivery: 30 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for similar electrical line material projects

4

Financial statements / turnover evidence

5

EMD submission proof

6

Technical bid documents and compliance certificates

7

OEM authorizations (if applicable)

8

FDR or PBG submission proof

9

Escalation matrix and dedicated service contact details

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for Etah 11 KV line materials tender in 2026?

To bid, ensure non-liquidation status, submit EMD ₹19,000, provide GST and PAN, attach experience certificates, and furnish technical compliance with the ATC. Include FDR/PBG security proof and service escalation details. Prepare wall-to-wall BOQ alignment for 74 items and confirm delivery schedule per last DO date.

What documents are required for UPPCL Etah procurement 2026?

Required documents include GST certificate, PAN, experience certificates for similar works, financial statements, EMD proof, technical bid documents, OEM authorizations (if any), and an FDR or PBG submission with delivery within 15 days of award. Include escalation matrix and service contact details.

What are the delivery time and option clause details for this tender?

Delivery time starts from the last date of the original delivery order. The purchaser may extend up to 25% quantity; additional time equals (additional/original) × original period, minimum 30 days. Bidders must comply with extended delivery terms and re-quote at contracted rates.

Which security options are accepted for UPPCL tender security?

Security can be provided as either PBG or Fixed Deposit Receipt (FDR) in the seller’s name; the FDR should be transferable on demand with pledge endorsement. Hard copy of the original FDR must be delivered within 15 days of contract award.

What is the estimated value and EMD for the UPPCL Etah project?

The estimated value is ₹1,900,000 with an EMD of ₹19,000. Ensure EMD submission along with GST/PAN, and provide financial and turnover evidence to meet eligibility criteria for this 2026 tender.

Are ISI/IS standards required for this Etah tender?

Public data does not specify exact standards; bidders should review the ATC documents attached by the buyer for ISI/ISO/IS compliance requirements and obtain necessary certifications to ensure product conformity before submission.

What kind of erection works are included in this tender?

The scope includes erection of 11 M STP, STP sections/poles, dismentalling of conductors, laying of XLPE cables, GI fittings, and related safety/holding clamps. Ensure proper on-site installation capability and safety compliance in line with buyer ATC terms.

What is the scope of safe carriage in this UPPCL bid?

Safe carriage covers transportation of 11 KV line materials, LT line materials, LT XLPE cables, LT AB cables, and dismantled components. Plan for secure handling, road permits, and on-time handover at designated sites in Etah district.