Bharat Petroleum Corporation Limited Filling Machine with Conveyor Tender Uluberia LPG Plant Kolkata West Bengal 2026

Bid Publish Date

09-Aug-2026, 3:05 pm

Bid End Date

31-Aug-2026, 2:00 pm

Progress

Issue09-Aug-2026, 3:05 pm
AwardPending

Tender Overview

Organization: Bharat Petroleum Corporation Limited (BPCL) – Uluberia LPG Bottling Plant, Howrah, West Bengal. Project: supply, installation and commissioning of a commercial filling machine with conveyor and associated installation charges and electrical works at Uluberia plant. ** bidding approach**: online GeM two-part process (Techno-commercial and Price Bid). Scope includes integration with a conveyor system and driving unit, plus installation and commissioning. Location: Uluberia, Burgpur/Uluberia area, Howrah district, West Bengal. Key differentiator: formal annexures cover Scope of Work, GPC, SCC, and Unpriced SOR formats to standardize procurement. BOQ status: 5 total items listed, but specific quantities/units are not disclosed in the excerpt. This tender is part of BPCL’s LPG plant modernization and procurement through GeM with ATC terms on quantity adjustment.

Technical Specifications & Requirements

  • Product/Service: Supply, installation & commissioning of a commercial filling machine with conveyor at Uluberia LPG Plant, including conveyor system with driving unit and electrical works.
  • Deliverables: Complete setup, installation, testing and commissioning per Annexures I–V (Instructions to Bidders, BQC, Scope of Work, GPC, SCC).
  • Bid Structure: GeM portal two-part submission; includes technical bid and price bid.
  • Scope Elements: Installation charges and commissioning; integration with existing plant infrastructure; compliance with BPCL General Purchase Conditions and Special Conditions of Contract.
  • Quantity/Value: Not disclosed; formal ATC allows quantity variation up to 25% at contract rates.

Terms & Eligibility

  • Option Clause: Purchaser may increase/decrease quantity by up to 25% of bid/contract quantity; extended delivery time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
  • Submission Route: GeM portal; two-part bid (Techno-commercial and Price).
  • Documentation Framework: Annexures I–V define Instructions, BQC, Scope, GPC, SCC, and Unpriced SOR; bidders must conform to these formats.
  • Delivery & Timeline: Delivery period anchored to original delivery order date; extension terms apply if option exercised; explicit delivery schedule not disclosed in excerpt.
  • Location/Plant Details: Uluberia LPG Plant, Vill+Po- Birshibpur, P.S. Uluberia, Howrah, West Bengal – 711316.

Key Specifications

  • Product/service names and category: commercial filling machine with conveyor, complete installation and commissioning

  • Scope: supply, installation, commissioning, and electrical works at Uluberia LPG Plant

  • Delivery/variation: quantity adjustment clause up to 25%, extended delivery as per formula

  • Bid process: GeM two-part techno-commercial and price bid with Annexures I–V

  • Documentation: adherence to BPCL GPC and SCC; scope of work per Annexures

Terms & Conditions

  • Quantity adjustment up to 25% at contract; extended delivery calculation with minimum 30 days

  • Two-part GeM bidding; techno-commercial and price bid separated

  • Annexures I–V govern Instructions, BQC, Scope, GPC, SCC and Unpriced SOR

Important Clauses

Delivery Schedule

Delivery period begins from the last date of original delivery order; extension times apply when options exercised; minimum 30 days extension.

Payment Terms

Payment terms not specified in excerpt; procurement follows BPCL GPC/SCC terms in Annexures.

Performance & Penalties

Not explicitly stated in excerpt; penalties/LD terms would be defined in GPC/SCC annexures.

Bidder Eligibility

  • Participation via GeM portal with two-part bid submission

  • Compliance with BPCL General Purchase Conditions and Special Conditions of Contract

  • Ability to supply, install and commission a commercial filling machine with conveyor and perform electrical works

Authority & Contact

Tender Data

Bid Details

Quantity

26

Category

Filling Machine for 5 kg 19kg 35 kg 47 5 Kg cylinder

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

9

Past Performance

30 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Filling Machine for 5 kg 19kg 35 kg 47 5 Kg cylinder , Weight Correction Unit , Conveyor System with Driving Unit , Installation Charges , Electrical works

Advisory Bank

ICICI

ePBG Percentage

5%

ePBG Duration (Months)

18

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

120

Delivery Locations

1

Delivery Cities

Kolkata

Delivery Pincodes

700095

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Amitava Das700095,PRINCE GULAM MD SHAH ROAD GOLF GREEN KOLKATAKolkataWest Bengal7000953120-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASBHARAT PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 8

GeM-Bidding-9731184.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

Filling Machine for 5 kg 19kg 35 kg 47 5 Kg cylinder

Filling Machine for 5 kg 19kg 35 kg 47 5 Kg cylinder

3 ea Delivery: 120 days
#2

Weight Correction Unit

Weight Correction Unit

1 ea Delivery: 120 days
#3

Conveyor System with Driving Unit

Conveyor System with Driving Unit

20 rm Delivery: 120 days
#4

Installation Charges

Installation Charges

1 ls Delivery: 120 days
#5

Electrical works

Electrical works

1 ls Delivery: 120 days

Categories 14

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Frequently Asked Questions

Key insights about WEST BENGAL tender market

How to bid on BPCL filling machine tender in Uluberia West Bengal

Bidders must register on GeM, access BPCL’s LPG plant tender, and submit a two-part bid (technical and price). Ensure compliance with Annexures I–V, provide installation and electrical work scope, and adhere to quantity variation terms of up to 25% with delivery extensions as defined.

What documents are required for BPCL filling machine tender submission 2026

Prepare GST certificate, PAN, company financial statements, experience certificates for similar equipment installation, OEM authorization if applicable, technical bid documents showing compliance with Scope of Work, and EMD as per BPCL GPC/SCC terms; ensure submission through GeM portal.

What are the technical requirements for BPCL Uluberia conveyor system bid

The tender requires a commercial filling machine with conveyor, driving unit, and integration with electrical works; detailed standards and testing methods will be in Annexures, with scope including installation and commissioning at Uluberia LPG Plant.

When is delivery expected for BPCL Uluberia filling line tender

Delivery timeline starts from the last date of the original delivery order; if quantity increases by up to 25%, extended time is (Increased/Original) × Original period, minimum 30 days; precise dates depend on the final order and execution plan.

What is the EMD requirement for BPCL procurement of filling equipment

EMD details are not specified in the excerpt; bidders should refer to BPCL GPC/SCC annexures for the exact EMD amount, mode of payment, and validity tied to the two-part GeM bid process.

What standards or certifications are required for BPCL BPCL Uluberia tender

Standards/qualifications will be specified in Annexures I–V; bidders should expect OEM authorizations, general purchase conditions, and SCC; ensure compliance with any ISI/ISO or client-specified standards as per BPCL specifications.

How to verify eligibility criteria for BPCL LPG plant installation tender

Review Bid Qualification Criteria in Annexure II; confirm previous similar project experience, financial capacity, and capability to supply, install and commission a filling line with conveyor; ensure GST/PAN and technical capabilities are documented.