TenderDekho Logo
Closed GEM

Invitation to Bid - Dismantling of VLRA Battery Set of Capacity 200AH to 900AH including disconnecting power cables alo in KOLLAM, KERALA

Bid Publish Date

10-Nov-2025, 5:22 pm

Bid End Date

25-Nov-2025, 5:00 pm

EMD

₹14,438

Value

₹7,21,890

Progress

RA
Issue10-Nov-2025, 5:22 pm
Reverse AuctionCompleted
Award27-Dec-2025, 4:38 am
Explore all 4 tabs to view complete tender details

Quantity

3730

Category

Installation of VRLA Battery400AH TO 600AH connecting HRC fuse testing and commissioning of the above battery AND PP set on available exchange load as required

Bid Type

Two Packet Bid

Categories 21

Bharat Sanchar Nigam Limited Portal(bsnl) has released a public tender for Dismantling of VLRA Battery Set of Capacity 200AH to 900AH including disconnecting power cables along with all accessories, Dismantling of VLRA battery set of Capacity 1000AH to 1500AH including disconnecting power cables along with all accessories, Dismantling of VLRA battery set of capacity 2000AH to 4000AH including disconnecting power cables along with all accessories, Dismantling of VLRA Power Plant including disconecting power cables with all accessories, Transportation of VLRA battery upto 900AH from BA Stores or any Loaction as per BSNL incharge loading unloading transportaion charges distance per km, Transportation of VLRA Power Plant from BA stores or any location as per BSNL site incharge loading unloading transportation distance per km, Installation of VRLA Battery400AH TO 600AH connecting HRC fuse testing and commissioning of the above battery AND PP set on available exchange load as required, Installation of VRLA Battery1000AH TO 1500AH connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required, Installation of VRLA Battery2000AH TO 4000AH connecting HRC fuse testing and commissioning of the above battery and PP set on available exchange load as required, Installation of VRLA Power Plant connecting HRC fuse testing and commissioning of the above batter and PP set on available exchange load as required, Additional charges to shift the VRLA Battery400AH TO 900AHset to upper floor at siteIn the case of buildings where lift facility is not available, Additional charges to shift the VRLA Battery1000AH TO 2000AHset to upper floor at siteIn the case of buildings where lift facility is not available, Additional charges to shift the VRLA Power Plant to upper floor at siteIn the case of buildings where lift facility is not available, Dismantling of old VLRA battery set and Power Plant Battery capacity 200AH to 900AH and PP including disconnecting power cables along with all accessories, Dismantling of old VLRA battery set and PP battery capacity above 900AH and PP including disconnecting power cables along with all accessories, Transportation of Liio BBPP upto 900AH from BA stores or any location as per BSNL site in charge loading unloading transporation distance per km, Installation of Battery PP sets LiIon 300 AH to 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required, Installation of Battery PP sets LiIon above 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required, Additional charges to shift the Liion BBPP 400AH TO 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available, Additional charges to shift the Liion BBPP above 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available in KOLLAM, KERALA. Quantity: 3730. Submission Deadline: 25-11-2025 17: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Dismantling of VLRA Battery Set of Capacity 200AH to 900AH including disconnecting power cables along with all accessories , Dismantling of VLRA battery set of Capacity 1000AH to 1500AH including disconnecting power cables along with all accessories , Dismantling of VLRA battery set of capacity 2000AH to 4000AH including disconnecting power cables along with all accessories , Dismantling of VLRA Power Plant including disconecting power cables with all accessories , Transportation of VLRA battery upto 900AH from BA Stores or any Loaction as per BSNL incharge loading unloading transportaion charges distance per km , Transportation of VLRA Power Plant from BA stores or any location as per BSNL site incharge loading unloading transportation distance per km , Installation of VRLA Battery400AH TO 600AH connecting HRC fuse testing and commissioning of the above battery AND PP set on available exchange load as required , Installation of VRLA Battery1000AH TO 1500AH connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required , Installation of VRLA Battery2000AH TO 4000AH connecting HRC fuse testing and commissioning of the above battery and PP set on available exchange load as required , Installation of VRLA Power Plant connecting HRC fuse testing and commissioning of the above batter and PP set on available exchange load as required , Additional charges to shift the VRLA Battery400AH TO 900AHset to upper floor at siteIn the case of buildings where lift facility is not available , Additional charges to shift the VRLA Battery1000AH TO 2000AHset to upper floor at siteIn the case of buildings where lift facility is not available , Additional charges to shift the VRLA Power Plant to upper floor at siteIn the case of buildings where lift facility is not available , Dismantling of old VLRA battery set and Power Plant Battery capacity 200AH to 900AH and PP including disconnecting power cables along with all accessories , Dismantling of old VLRA battery set and PP battery capacity above 900AH and PP including disconnecting power cables along with all accessories , Transportation of Liio BBPP upto 900AH from BA stores or any location as per BSNL site in charge loading unloading transporation distance per km , Installation of Battery PP sets LiIon 300 AH to 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required , Installation of Battery PP sets LiIon above 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required , Additional charges to shift the Liion BBPP 400AH TO 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available , Additional charges to shift the Liion BBPP above 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available

Authority Records

MINISTRY OF COMMUNICATIONSTELECOMMUNICATIONS DEPARTMENTBHARAT SANCHAR NIGAM LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-8546931.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 20 Items Sign in for GEM prices

#1

Dismantling of VLRA Battery Set of Capacity 200AH to 900AH including disconnecting power cables along with all accessories

Dismantling of VLRA Battery Set of Capacity 200AH to 900AH including disconnecting power cables along with all accessories

65 nos Delivery: 90 days
#2

Dismantling of VLRA battery set of Capacity 1000AH to 1500AH including disconnecting power cables along with all accessories

Dismantling of VLRA battery set of Capacity 1000AH to 1500AH including disconnecting power cables along with all accessories

18 nos Delivery: 90 days
#3

Dismantling of VLRA battery set of capacity 2000AH to 4000AH including disconnecting power cables along with all accessories

Dismantling of VLRA battery set of capacity 2000AH to 4000AH including disconnecting power cables along with all accessories

2 nos Delivery: 90 days
#4

Dismantling of VLRA Power Plant including disconecting power cables with all accessories

Dismantling of VLRA Power Plant including disconecting power cables with all accessories

22 nos Delivery: 90 days
#5

Transportation of VLRA battery upto 900AH from BA Stores or any Loaction as per BSNL incharge loading unloading transportaion charges distance per km

Transportation of the VRLA Battery upto 900AH from BA store OR ANY LOCATION to location as per BSNL site IC shifting and Loading of the same BatteryPP set to a suitable vehicle unloading and shifting as per the requirement distance per km rate

2,050 km Delivery: 90 days
#6

Transportation of VLRA Power Plant from BA stores or any location as per BSNL site incharge loading unloading transportation distance per km

Transportation of the VRLA Power Plant from BA store OR ANY LOCATION to location as per BSNL site IC shifting and Loading of the same BatteryPP set to a suitable vehicle unloading and shifting as per the requirement distance per km rate

650 km Delivery: 90 days
#7

Installation of VRLA Battery400AH TO 600AH connecting HRC fuse testing and commissioning of the above battery AND PP set on available exchange load as required

Installation of VRLA Battery400AH TO 600AH connecting HRC fuse testing and commissioning of the above battery AND PP set on available exchange load as required

78 nos Delivery: 90 days
#8

Installation of VRLA Battery1000AH TO 1500AH connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required

Installation of VRLA Battery1000AH TO 1500AH connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required

18 nos Delivery: 90 days
#9

Installation of VRLA Battery2000AH TO 4000AH connecting HRC fuse testing and commissioning of the above battery and PP set on available exchange load as required

Installation of VRLA Battery2000AH TO 4000AH connecting HRC fuse testing and commissioning of the above battery and PP set on available exchange load as required

2 nos Delivery: 90 days
#10

Installation of VRLA Power Plant connecting HRC fuse testing and commissioning of the above batter and PP set on available exchange load as required

Installation of VRLA Power Plant connecting HRC fuse testing and commissioning of the above batter and PP set on available exchange load as required

27 nos Delivery: 90 days
#11

Additional charges to shift the VRLA Battery400AH TO 900AHset to upper floor at siteIn the case of buildings where lift facility is not available

Additional charges to shift the VRLA Battery400AH TO 900AHset to upper floor at siteIn the case of buildings where lift facility is not available

33 nos Delivery: 90 days
#12

Additional charges to shift the VRLA Battery1000AH TO 2000AHset to upper floor at siteIn the case of buildings where lift facility is not available

Additional charges to shift the VRLA Battery1000AH TO 2000AHset to upper floor at siteIn the case of buildings where lift facility is not available

12 nos Delivery: 90 days
#13

Additional charges to shift the VRLA Power Plant to upper floor at siteIn the case of buildings where lift facility is not available

Additional charges to shift the VRLA Power Plant to upper floor at siteIn the case of buildings where lift facility is not available

16 nos Delivery: 90 days
#14

Dismantling of old VLRA battery set and Power Plant Battery capacity 200AH to 900AH and PP including disconnecting power cables along with all accessories

Dismantling of old VLRA battery set and Power Plant Battery capacity 200AH to 900AH and PP including disconnecting power cables along with all accessories

7 nos Delivery: 90 days
#15

Dismantling of old VLRA battery set and PP battery capacity above 900AH and PP including disconnecting power cables along with all accessories

Dismantling of old VLRA battery set and PP battery capacity above 900AH and PP including disconnecting power cables along with all accessories

2 nos Delivery: 90 days
#16

Transportation of Liio BBPP upto 900AH from BA stores or any location as per BSNL site in charge loading unloading transporation distance per km

Transportation of the Liion BBPP up to 900 AH and PP LiIon from BA store or any location to as per BSNL site IC shifting and Loading of the same BatteryPP set to a suitable vehicle unloading and shifting as per the requirement distance Per km rate

620 km Delivery: 90 days
#17

Installation of Battery PP sets LiIon 300 AH to 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required

Installation of Battery PP sets LiIon 300 AH to 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required

74 nos Delivery: 90 days
#18

Installation of Battery PP sets LiIon above 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required

Installation of Battery PP sets LiIon above 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required

2 nos Delivery: 90 days
#19

Additional charges to shift the Liion BBPP 400AH TO 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available

Additional charges to shift the Liion BBPP 400AH TO 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available

30 nos Delivery: 90 days
#20

Additional charges to shift the Liion BBPP above 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available

Additional charges to shift the Liion BBPP above 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available

2 nos Delivery: 90 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

Additional Doc 1 (Requested in ATC)

6

Additional Doc 2 (Requested in ATC)

7

Additional Doc 3 (Requested in ATC)

8

Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

1 Update
#1

Update

13-Nov-2025

Reverse Auction Schedule

Completed

Start

12-Dec-2025, 4:00 pm

End

13-Dec-2025, 4:00 pm

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
RUDRA ENTERPRISES   Under PMA
-25-11-2025 14:07:46
2
universal tele services   Under PMA
-25-11-2025 16:50:57

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1RUDRA ENTERPRISES(MSE)   Under PMA Winner ₹8,37,241Item Categories : Dismantling of VLRA Battery Set of Capacity 200AH to 900AH including disconnecting power cables alo
L2universal tele services (MSE)   Under PMA₹26,71,151Item Categories : Dismantling of VLRA Battery Set of Capacity 200AH to 900AH including disconnecting power cables alo

🎉 L1 Winner

RUDRA ENTERPRISES(MSE)   Under PMA

Final Price: ₹8,37,241

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.