Bhakra Beas Management Board (BBMB) Panipat invites bids for the Supply and Replacement of all gaskets on a 60 MVA, 220/33 kV Power Transformer (T-2) at the 400 kV Substation, Panipat. The scope includes gasket replacement for main tank cover, bushings, radiator valves, conservator tank, and related joints, plus complete oil flushing and minor OLTC repair. Gaskets must be Nu-Cork / Pristin / Nebar, oil-compatible, and IS/IEC-compliant. OLTC repair requires Easun MR OEM authorization. The contract covers repair of the conservator tank and associated resealing, with oil topping and post-work housekeeping.
Key differentiators include adherence to IS/IEC standards for gaskets, mandatory OLTC repair authorization, and comprehensive leak-proofing with oil management. The procurement emphasizes oil leakage control, torque-safe fasteners, and a coordinated shutdown at BBMB Panipat. Bid submission can be by EMD/FD options, with hardcopy delivery within 5 days of bid opening.
Transformer rating: 60 MVA, 220/33 kV
Gasket materials: Nu-Cork / Pristin / Nebar, oil-compatible
Standards: IS/IEC conformance for gasket and installation
OLTC repair: requires OEM authorization (Easun MR)
Conservator tank and piping gasket scope
Oil flushing and topping to restore oil levels and cleanliness
EMD submission via DD or FD with 5-day hardcopy delivery
OLTC repair requires Easun MR OEM authorization
IS/IEC compliant gasket materials and complete leak-proofing scope
EMD options via DD or FDR; hardcopy submission within 5 days; no advance terms specified
Scope includes on-site replacement, oil flushing, and reassembly; precise timetable not provided
Not explicitly specified in available terms
Experience in transformer gasket replacement and OLTC repair
IS/IEC standards compliance for gasket materials
Financial capacity demonstrated via financial statements
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Compliance
Yes
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Switchyard; 220/33kv,60MVA Transformer; Service Provider
Pre-Bid Date
28-10-2026 12:00:00
Pre-Bid Venue
Attendence at the prebid meeting at 400kV Substation BBMB Panipat is mandatery and that non attendence will result in disqualification
Delivery Locations
1
Delivery Cities
Panipat
Delivery Pincodes
132108
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Anshu Mishra | 132108,Bhakra Beas Management Board, SEWAH, GT ROAD , PANIPAT | Panipat | Haryana | 132108 | Project / Lumpsum Based | - | Estimated Cost of Spare/Consumable s/Items on Reimbursement basis in Rs (please input 0 if not applicable) : 0 |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
EMD proof (DD or FD receipt) and scanned copy uploaded; hardcopy delivered within 5 days
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates on similar transformer gasket/replacement work
Financial statements demonstrating financial stability
Technical bid documents and OEM authorizations for OLTC repairs (Easun MR)
Quality/compliance certificates (IS/IEC conformity) for gasket materials
Any prior project completion certificates related to 60 MVA transformers
Bidders must submit EMD via DD or FDR in favor of SR AO BBMB Panipat, upload scanned proof, and deliver hardcopy within 5 days of bid end. Include OEM authorization for OLTC work (Easun MR) and IS/IEC compliant gasket materials like Nu-Cork/Pristin/Nebar.
Required documents include GST registration, PAN, experience certificates for gasket work on 60 MVA transformers, financial statements, EMD proof, OEM authorizations for OLTC, IS/IEC conformity certificates, and technical bid documents demonstrating transformer gasket replacement capability.
Gaskets must be IS/IEC compliant and compatible with transformer oil. Materials should be Nu-Cork, Pristin, or Nebar. The scope includes oil flushing and leak-proof sealing across all joints, including conservator and radiator connections.
Hardcopy EMD must reach BBMB Panipat within 5 days after bid end/opening date. Digital uploads must be accompanied by scanned proof of DD or FDR as part of the bid submission package.
OLTC repair requires authorization from the original equipment manufacturer (Easun MR). The contractor must provide OEM certification along with evidence of OLTC repair capability and associated warranty/verification tests after reassembly.
Scope includes replacing gaskets on main tank cover, bushings, radiator valves/flanges, conservator tank, inspection covers, pipe flanges, oil piping, and Buchholz connections; followed by oil flushing, topping, and leak-proof testing.
Bidders must submit GST certificate, PAN, and financial statements demonstrating liquidity. Tender evaluators review these documents to confirm eligibility and capacity to undertake 60 MVA transformer gasket replacement and associated OLTC work.
IS/IEC conformity documents for gasket materials (Nu-Cork/Pristin/Nebar) and transformer oil handling procedures must be included in the technical bid. Ensure certifications align with BBMB Panipat commissioning and safety standards.