Progress
State Bank Of India (sbi) announces a tender for UPS, Additional Module for UPS, Li Ion Batteries, CAMC 4TH YEAR, CAMC 5TH YEAR, CAMC 6TH YEAR, CAMC 7TH YEAR, CAMC 8TH YEAR in KHORDHA, ODISHA. Quantity: 8. Submission Deadline: 02-09-2026 15: 00: 00. Last date to apply is approaching fast!
Quantity
8
Category
UPS
Bid Type
Two Packet Bid
Bid Validity
60 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
30
Past Performance
80 %
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
UPS , Additional Module for UPS , Li Ion Batteries , CAMC 4TH YEAR , CAMC 5TH YEAR , CAMC 6TH YEAR , CAMC 7TH YEAR , CAMC 8TH YEAR
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
38
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Pre-Bid Date
24-07-2026 11:00:00
Pre-Bid Venue
SBI LHO BHUBANESWAR
Max Delivery Days
90
Delivery Locations
1
Delivery Cities
Khordha
Delivery Pincodes
751001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Tapan Kumar Behera | 751001,ASSISTANT GENERAL MANAGER(P&E), Local Head Office(2nd Floor), State Bank of India, Jawaharlal Nehru Marg, Bhubaneswar | Khordha | Odisha | 751001 | 1 | 90 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
UPS
Cost of Supply Installation Testing and Commissioning of 200 kVA or kW modular ups system with 250 or 500 kVA Rack Frame at the LHO building at Bhubaneswar with 3 Year Warranty for UPS including external Isolation Transformer of 250KVA. Conforming to tender terms and conditions technical specifications including all charges like transportation loading unloading SITC duty octroi etc all taxes including GST.
Additional Module for UPS
Cost of Supply Installation Testing and Commissioning of additional modules with a capacity of min 50 kVA or kW Modular UPS module compatible and as an add on for item No 1 above Conforming to tender terms and conditions technical specifications including all charges like transportation loading unloading SITC duty octroi etc all taxes including GST.
Li Ion Batteries
Cost of Supply Installation Testing and Commissioning of 105.26 kWh (minimum) capacity Lithium Ion Batteries having 30 minute back up time at 200 kVA/kW at the LHO building at Bhubaneswar with 8 Year Warranty for Batteries. Conforming to tender terms & conditions technical specifications including all charges like transportation loading unloading SITC duty octroi etc all taxes including GST.
CAMC 4TH YEAR
Comprehensive Annual Maintenance Charges for 4th year after warranty period of three years for 250 kVA UPS System including GST
CAMC 5TH YEAR
Comprehensive Annual Maintenance Charges for 5th year after warranty period of three years for 250 kVA UPS System including GST
CAMC 6TH YEAR
Comprehensive Annual Maintenance Charges for 6th year after warranty period of three years for 250 kVA UPS System including GST
CAMC 7TH YEAR
Comprehensive Annual Maintenance Charges for 7th year after warranty period of three years for 250 kVA UPS System including GST
CAMC 8TH YEAR
Comprehensive Annual Maintenance Charges for 8th year after warranty period of three years for 250 kVA UPS System including GST
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | UPS | Cost of Supply Installation Testing and Commissioning of 200 kVA or kW modular ups system with 250 or 500 kVA Rack Frame at the LHO building at Bhubaneswar with 3 Year Warranty for UPS including external Isolation Transformer of 250KVA. Conforming to tender terms and conditions technical specifications including all charges like transportation loading unloading SITC duty octroi etc all taxes including GST. | 1 | set | sbilhobhu.buy_con4 | 90 | |
| 2 | Additional Module for UPS | Cost of Supply Installation Testing and Commissioning of additional modules with a capacity of min 50 kVA or kW Modular UPS module compatible and as an add on for item No 1 above Conforming to tender terms and conditions technical specifications including all charges like transportation loading unloading SITC duty octroi etc all taxes including GST. | 1 | set | sbilhobhu.buy_con4 | 90 | |
| 3 | Li Ion Batteries | Cost of Supply Installation Testing and Commissioning of 105.26 kWh (minimum) capacity Lithium Ion Batteries having 30 minute back up time at 200 kVA/kW at the LHO building at Bhubaneswar with 8 Year Warranty for Batteries. Conforming to tender terms & conditions technical specifications including all charges like transportation loading unloading SITC duty octroi etc all taxes including GST. | 1 | set | sbilhobhu.buy_con4 | 90 | |
| 4 | CAMC 4TH YEAR | Comprehensive Annual Maintenance Charges for 4th year after warranty period of three years for 250 kVA UPS System including GST | 1 | set | sbilhobhu.buy_con4 | 365 | |
| 5 | CAMC 5TH YEAR | Comprehensive Annual Maintenance Charges for 5th year after warranty period of three years for 250 kVA UPS System including GST | 1 | set | sbilhobhu.buy_con4 | 365 | |
| 6 | CAMC 6TH YEAR | Comprehensive Annual Maintenance Charges for 6th year after warranty period of three years for 250 kVA UPS System including GST | 1 | set | sbilhobhu.buy_con4 | 365 | |
| 7 | CAMC 7TH YEAR | Comprehensive Annual Maintenance Charges for 7th year after warranty period of three years for 250 kVA UPS System including GST | 1 | set | sbilhobhu.buy_con4 | 365 | |
| 8 | CAMC 8TH YEAR | Comprehensive Annual Maintenance Charges for 8th year after warranty period of three years for 250 kVA UPS System including GST | 1 | set | sbilhobhu.buy_con4 | 365 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer