Bid Publish Date
03-Aug-2026, 6:53 pm
Bid End Date
20-Aug-2026, 7:00 pm
Location
Progress
Organization: Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL), Lucknow; Department: Energy Department Uttar Pradesh; Location: Sonbhadra, Uttar Pradesh 231205; Category: Mechanical seal for Alekton triple screw LP pump, LP Lube Pump with motor of Ball Mill BBD4772; Scope: supply of Goods only; BOQ: 0 items, no quantity details; Delivery/Option: quantity may be increased/decreased by up to 25% at contract, with extension time formula (min 30 days); ATC: Buyer has uploaded ATC document; EMD/Value: Not specified; procurement context is a mechanical seal component for a ball mill drive system.
Product/service names and categories: Mechanical seal for Alekton triple screw LP pump with motor of Ball Mill BBD4772
Quantities/values: 0 items in BOQ; estimated value not disclosed
EMD/Value: Not specified in data; verify via ATC
Experience/eligibility: Not specified in data; verify ATC requirements
Quality/standards: No specific standards listed in provided data
Delivery/installation: Option-based quantity adjustment up to 25%; minimum 30 days extension
Warranty/AMC: Not specified in provided data
Option Clause allows +/- 25% quantity variation at contract and during currency
Scope limited to supply of Goods; no installation included
ATC document uploaded; bidders must review for submission specifics
Not specified in available data; verify in ATC
Delivery extension formula: (Increased quantity ÷ Original quantity) × Original delivery period, with minimum 30 days
No LD details provided; confirm in ATC
Review ATC for exact eligibility criteria and required certifications
Provide GOODS supply capability for mechanical seal components
Submit all specified documents (GST, PAN, EMD) as per ATC
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | M H INDUSTRIES( MSE Social Category:General ) Under PMA | Item Categories : Mechanical seal for alekton triple screw LP pump,L. P. Lube Pump with motor of Ball Mill BBD4772 |
Quantity
27
Category
L. P. Lube Pump with motor of Ball Mill BBD4772
Bid Type
Single Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Mechanical seal for alekton triple screw LP pump , L. P. Lube Pump with motor of Ball Mill BBD4772
Max Delivery Days
120
Delivery Locations
1
Delivery Cities
Sonbhadra
Delivery Pincodes
231225
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Jai Narayan | 231225,Anpara Thermal Power Plant, Anpara, Sonebhadra | Sonbhadra | Uttar Pradesh | 231225 | 24 | 120 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
17-Aug-2026, 1:30 pm
Opening Date
17-Aug-2026, 2:00 pm
GST certificate
PAN card
Experience certificates (if applicable)
Financial statements (as required by ATC)
EMD documents (as specified in ATC)
Technical bid documents
OEM authorizations (if required by ATC)
ATC-viewable bid documents (as uploaded by purchaser)
Key insights about UTTAR PRADESH tender market
Bidders must review the ATC uploaded by the purchaser and submit GST registration, PAN card, experience certificates, financial statements, EMD documents, technical bid documents, and OEM authorizations as specified. The exact list is in the ATC and must be followed to participate.
Prepare a goods-only bid with detailed pricing for the mechanical seal for Alekton triple screw LP pump assembly. Ensure compliance with ATC guidelines, submit all required documents, and consider the 25% quantity variation and 30-day minimum extension terms when planning delivery.
EMD details are not listed in the provided data; bidders must check the ATC document uploaded by the purchaser to confirm the exact EMD amount, mode of payment, and validity.
The buyer may increase or decrease quantity by up to 25% at contract and during the currency at contracted rates. Additional delivery time is calculated as (Increased quantity / Original quantity) × Original delivery period, with a minimum of 30 days.
No specific technical standards are listed in the provided data. Bidders should consult the ATC for any IS, ISO, or OEM requirements applicable to the Alekton triple screw LP pump seal.
Delivery period starts from the last date of the original delivery order; extension timing follows the 25% variation formula with a minimum 30 days, and may extend up to the original delivery period per the option clause.
Scope specifies supply of Goods only; installation or commissioning is not included per the terms. Ensure all cost components are included in the bid price as stated in the scope.
The ATC document is uploaded by the purchaser. Bidders must click the ATC link in the tender portal and review the complete terms, submission requirements, and any special conditions.