TenderDekho Logo
Active GEM

Indian Army DRYING DISTRIBUTION UNIT Spare Parts Tender Leh Jammu & Kashmir 2026 – IS Material, OEM Warranty & 25% Quantity Flexibility

Bid Publish Date

09-Oct-2026, 7:23 pm

Bid End Date

20-Oct-2026, 10:00 am

Progress

Issue09-Oct-2026, 7:23 pm
AwardPending

Key Highlights

  • • Brand/OEM requirement: OEM warranty certificates to be provided at delivery
  • • Technical standard: ISI/ISO certifications not specified; OEM service network required across INDIA
  • • Special clause: 25% quantity increase/decrease at contract placement and during currency
  • • Eligibility: must demonstrate Installation, Commissioning, Training, Troubleshooting, and Maintenance capabilities

Tender Overview

The Indian Army, Department Of Military Affairs, seeks supply of spare parts for a mixed catalog including drying distribution unit components, air compressor spares, and accessory kits. The procurement location is Leh, Jammu & Kashmir (194101), with a nine-item BoQ implying a kit-style deliverable rather than singular items. The scope is limited to supply of goods, with OEM warranty requirements and post-sale service obligations. A key differentiator is the option clause allowing a ±25% quantity adjustment at contract, and extended delivery time proportional to the additional quantity, subject to minimum 30 days. This tender emphasizes after-sales service capability across India and requires local or regional service networks for installation and maintenance. These elements shape supplier selection and logistics planning for remote high-altitude deployment.

Technical Specifications & Requirements

  • Item category includes drying distribution unit components, compressor spare parts, and assorted hardware (rep kits, O-rings, combination switches, hose clamps, door lock assemblies LH, rear hub nut lock, hose clips).
  • BoQ lists 9 total items; specific quantities are not disclosed, so bidders should prepare for bulk-spares packaging.
  • Warranty: OEM warranty certificates must be submitted at delivery; success bids must guarantee rectification during the warranty period.
  • Service capability: bidder must have established Installation, Commissioning, Training, Troubleshooting, and Maintenance teams in INDIA with local service centers near consignee locations.
  • Delivery terms: supply of goods only; extended delivery time applies when the option clause is exercised.
  • Compliance: Bidder to adhere to delivery and warranty terms as per buyer-specified terms; quantity adjustments up to 25% are possible during contract.

Terms, Conditions & Eligibility

  • EMD/security deposit amount not specified; bidders must comply with 25% quantity option and extended delivery time rules.
  • Scope confirms “Only supply of Goods.”
  • OEM warranty certificates required at the time of goods delivery; after-sales service network must be demonstrated with service centers details near consignee destinations.
  • Delivery period starts from last date of original delivery order; additional time calculated as (increased quantity ÷ original quantity) × original period with a 30-day minimum.
  • The terms emphasize compliance with installation, commissioning, and training if included; otherwise focus remains on supply and post-delivery support.

Key Specifications

  • Nine-item BoQ with spare parts subset for drying distribution unit and air compressor accessories

  • OEM warranty certificates to be submitted on delivery

  • Service network: Installation, Commissioning, Training, Troubleshooting, and Maintenance within INDIA

  • Delivery: supply of goods only; option for quantity adjustment up to 25% during contract

  • Delivery timeline: minimum 30 days for any extended delivery period

Terms & Conditions

  • Option Clause allows ±25% quantity adjustment at contract and during currency

  • Only supply of Goods; no works or services beyond installation/training if required

  • OEM warranty certificates required at time of delivery; after-sales service network mandatory

Important Clauses

Payment Terms

Not specified in tender data; bidders should verify with issuing authority

Delivery Schedule

Delivery starts from last date of original delivery order; extended time calculated by (increased quantity ÷ original quantity) × original period with minimum 30 days

Penalties/Liquidated Damages

Not specified; implied via delivery and warranty terms; confirm at bid submission

Bidder Eligibility

  • Demonstrated experience in supplying spare parts for military-grade units

  • Proof of OEM authorization or credible distributorship with OEM support

  • Ability to provide nationwide service centers and after-sales support in INDIA

Advertisement

Tender Data

Bid Details

Quantity

37

Category

DRYING DISTRI UNIT HI PR VOSS

Bid Type

Single Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

40 %

Experience Required

2 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

DRYING DISTRI UNIT HI PR VOSS , COMPRESSOR AIR , REP KIT SHUTT OF COCK , O-RING , COMBINATION SWITCH , HOSE CLAMP , DOOR LOCK ASSY LH , REAR HUB NUT LOCK , HOSE CLIP

Delivery Details

Max Delivery Days

180

Delivery Locations

1

Delivery Cities

Leh

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-LehLeh--2180-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-10013668.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 9 Items Sign in for GEM prices

#1

DRYING DISTRI UNIT HI PR VOSS

DRYING DISTRI UNIT HI PR VOSS

2 nos Delivery: 180 days
#2

COMPRESSOR AIR

COMPRESSOR AIR

2 nos Delivery: 180 days
#3

REP KIT SHUTT OF COCK

REP KIT SHUTT OF COCK

3 nos Delivery: 180 days
#4

O-RING

O-RING

3 nos Delivery: 180 days
#5

COMBINATION SWITCH

COMBINATION SWITCH

1 nos Delivery: 180 days
#6

HOSE CLAMP

HOSE CLAMP

2 nos Delivery: 180 days
#7

DOOR LOCK ASSY LH

DOOR LOCK ASSY LH

2 nos Delivery: 180 days
#8

REAR HUB NUT LOCK

REAR HUB NUT LOCK

4 nos Delivery: 180 days
#9

HOSE CLIP

HOSE CLIP

18 nos Delivery: 180 days
Advertisement

Categories 22

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

OEM authorization letter (if not manufacturer, reseller certificate with OEM support)

4

Experience certificates showing similar spare parts supply

5

Financial statements (latest fiscal year)

6

Tender-specific OEM warranty documents and service center details

7

Technical compliance certificates (if applicable) and installation capabilities

8

EMD/Security deposit proof (amount not specified in terms)

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

How to bid on Indian Army spare parts tender in Leh?

Bidders should submit GST, PAN, OEM authorization, experience certificates, financial statements, and OEM warranty documents. Ensure service centers near consignee locations are listed and comply with the 25% quantity option and post-delivery warranty requirements.

What documents are required for Indian Army spare parts procurement in Leh?

Required documents include GST certificate, PAN card, OEM authorizations, experience certificates for similar supply, financial statements, EMD proof, and OEM warranty certificates. Also provide installation/service capability details and consignee-area service center information.

What are the warranty requirements for Army spare parts supply?

OEM warranty certificates must be provided at delivery; the seller guarantees rectification of any breakdown during the warranty period and provides a maintained service network in INDIA for post-sale support.

What is the delivery timeline for this Leh spare parts tender 2026?

Delivery is governed by the original delivery order; if quantity increases, extended time = (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days.

How does the 25% quantity option work for this Army tender?

The purchaser can increase or decrease the order by up to 25% at contract placement and again during the contract currency, with corresponding adjustment in delivery timelines at contracted rates.

What service capabilities must bidders demonstrate for Army spares?

Bidders must show Installation, Commissioning, Training, Troubleshooting, and Maintenance capabilities, plus near-consignee service centers across INDIA for timely after-sales support.

What are the key categories of items in the BoQ for this tender?

BoQ comprises nine items centered on spare parts for a drying distribution unit and air compressor assemblies, including rep kits, O-rings, switches, hose clamps, door LH assemblies, rear hub locks, and hose clips.

Where can bidders verify compliance with OEM and standards for this tender?

Bidders should confirm OEM authorization and any applicable standard certifications with the Indian Army procurement office; ensure service network details and warranty terms align with the tender’s requirements.

Advertisement