Ramagundam Fertilizers And Chemicals Ltd bearings tender Karimnagar Telangana 2026 SKF FAG NTN

Bid Publish Date

11-Oct-2026, 6:00 pm

Bid End Date

26-Oct-2026, 6:00 pm

Progress

Issue11-Oct-2026, 6:00 pm
AwardPending

Key Highlights

  • • Preferred OEM brands SKF / FAG / NTN with mandatory serial-number conformity
  • • Certificate of Conformity required for OEM serial numbers during supply
  • • 43-item BOQ covering diverse deep groove and variant bearings (C3, 2RS, Zz, Insul, etc.)
  • • Option clause allows ±25% quantity change at contract/within currency

Tender Overview

Organization: Ramagundam Fertilizers And Chemicals Ltd, under the Department Of Fertilizers, invites bids for bearing assemblies and related components across 43 items. Location: Karimnagar, Telangana 505001. Product category: Deep groove ball bearings (various gauges) including 2RS, Zz, C3 variants and insulative types; numerous SKU derivatives listed (e.g., 6209 C3 Deep grv, 6312 Zz Deep grv). Estimated value and Start/End dates are not disclosed; however, 43 items indicate a sizable scope. A key differentiator is OEM-aligned quality control with certified bearings and explicit vendor conformity checks. The tender emphasizes brand control through preferred makes and serial-number documentation, signaling strict compatibility with OEM parts and performance criteria.

Technical Specifications & Requirements

  • Product scope: Bearings families including 6209 C3 Deep grv, 6313 Deep grv, 6202 Zz Deep grv, NU206 EC C3 Row Cyl, among others; 43 total items suggest a wide range of radial/axial configurations.
  • Preferred brands: SKF / FAG / NTN; OEM validation required for all serial numbers.
  • Conformity evidence: Bidders must submit Certificate of Conformity or documentary confirmation from the OEM for serial numbers during supply.
  • BOQ notes: Multiple sub-categories (Deep grv, Zz, C3, 2RS, Insul variants) imply variance in tolerance, shields, and cage types.
  • ATC terms: Buyer uploaded a dedicated ATC clause; non-specified delivery schedules require alignment with internal committee review.
  • Quality controls: Technical committee will evaluate performance and PTR (Past Track Record) for non-specified variants; bid may be rejected for non-compliance.
  • Delivery & installation: No explicit delivery timeline published; clause suggests adherence to option clauses and OEM-grade validation during supply.
  • Documentation: Certificates, OEM verifications, and serial-number compliance are mandatory at submission; SKF/FAG/NTN compatibility emphasized.

Terms, Conditions & Eligibility

  • EMD/Deposit: Not disclosed in data; bidders should verify EMD requirements in the final ATC.
  • Bid flexibility: Quantity may vary up to 25% of bid quantity at contract placement and during currency at contracted rates.
  • Delivery period adjustments: Additional time computed as (increased quantity / original quantity) × original delivery period, with a minimum of 30 days; extensions allowed within original delivery window.
  • OEM conformity: Mandatory certificate confirming compatibility of serial numbers with specified OEM brands; internal TEC committee review for non-specified makes.
  • ATC references: Preferred makes explicitly stated; alternative brands require committee evaluation.
  • Documentation submission: Include GST, PAN, experience, financials, supplier of OEM conformity certificates, and technical bid content as per terms.
  • Warranty & penalties: Not detailed; bidders should seek clarification on warranty and LD terms during bid submission.

Key Specifications

  • Bearing families include 6209 C3 Deep grv, 6313 Deep grv, 6202 Zz Deep grv, NU206 EC C3 Row Cyl

  • Total quantity scope implied by 43 items; exact quantities not disclosed

  • Preferred OEM brands: SKF / FAG / NTN; serial-number conformity required

  • Documentation: Certificate of Conformity for serial numbers during supply

  • Variation rights: ±25% quantity at contract and during currency

Terms & Conditions

  • Option quantity adjustments up to 25% at contract and during currency

  • OEM conformity with SKF/FAG/NTN required via certificates

  • Delivery period calculations with minimum 30 days extension rule

Important Clauses

Payment Terms

Not specified in data; bidders should consult ATC for payment schedule and milestones

Delivery Schedule

Delivery period begins after order; extensions possible per option clause with minimum 30 days

Penalties/Liquidated Damages

Not detailed; bidders should verify LD terms during bid submission

Bidder Eligibility

  • Experience in supplying automotive or industrial bearings to government or large-scale manufacturers

  • Financial capability to handle 43-item bearing scope

  • Compliance with OEM brand requirements and certificate submissions

Advertisement

Tender Data

Bid Details

Quantity

242

Category

6319 C3 Deep grv

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Item wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

6209 C3 Deep grv , 6210 Deep grv , 6313 C3 Deep grv , 6314 Deep grv , 6317 Deep grv , 6201 Zz Deep grv , 6202 Zz Deep grv , 6202 Zz C3 Deep grv , 6203 Zz Deep grv , 6204 Zz C3 Deep grv , Deep grv 6205 Zz , 6205 ZZ C3 DEEP grv , 6206 ZZ DEEP grv , 6206 2Z C3 DEEP grv , 6207 ZZ DEEP grv , 6208 ZZ DEEP grv , 6208 ZZ C3 DEEP grv , 6209 2RS DEEP grv , 6209 C3 Single Deep grv , 6209 ZZ C3 DEEP grv , 6212 ZZ DEEP grv , 6222 M C3 Single Row , 6304 Zz Deep grv , 6308 Zz Deep grv , 6308 ZZ C3 DEEP grv , 6309 2rs Deep grv , 6209 C3 Single Row Dep , 6309 Z C3 Deep grv , 6309 zz deep grv , 6310 C3 Sing Row DEEP , 6310 Zz Deep grv , 6312 Z C3 Deep grv , 6312 Zz Deep grv , 6312 Zz C3 Deep grv , 6313 Zz Deep grv , 6316 C3 Deep grv , 6319 C3 Deep grv , 6319 C3 Insul Insocot , 7220 BE C BM Single , NU206 EC C3 Row Cyl , Nu222 E M C3 Sin Row , NU310 Cyl Roller , 6224 C3 S Deep grv

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Peddapalli

Delivery Pincodes

505210

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Ritesh Kumar Thakur505210,Ramagundam Fertilizers , RFCL Fertilizers City, RFCL Plant, Ramagundam, Peddapalli, TelanganaPeddapalliTelangana505210245-

Authority Records

MINISTRY OF CHEMICALS AND FERTILIZERSFERTILIZERS DEPARTMENTRAMAGUNDAM FERTILIZERS AND CHEMICALS LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-10017491.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Advertisement

Bill of Quantities (BOQ) 43 Items Sign in for GEM prices

#1

6209 C3 Deep grv

6209 C3 Deep grv

2 pieces Delivery: 45 days
#2

6210 Deep grv

6210 Deep grv

2 pieces Delivery: 45 days
#3

6313 C3 Deep grv

6313 C3 Deep grv

2 pieces Delivery: 45 days
#4

6314 Deep grv

6314 Deep grv

6 pieces Delivery: 45 days
#5

6317 Deep grv

6317 Deep grv

6 pieces Delivery: 45 days
#6

6201 Zz Deep grv

6201 Zz Deep grv

2 pieces Delivery: 45 days
#7

6202 Zz Deep grv

6202 Zz Deep grv

2 pieces Delivery: 45 days
#8

6202 Zz C3 Deep grv

6202 Zz C3 Deep grv

10 pieces Delivery: 45 days
#9

6203 Zz Deep grv

6203 Zz Deep grv

2 pieces Delivery: 45 days
#10

6204 Zz C3 Deep grv

6204 Zz C3 Deep grv

6 pieces Delivery: 45 days
#11

Deep grv 6205 Zz

Deep grv 6205 Zz

8 pieces Delivery: 45 days
#12

6205 ZZ C3 DEEP grv

6205 ZZ C3 DEEP grv

10 pieces Delivery: 45 days
#13

6206 ZZ DEEP grv

6206 ZZ DEEP grv

10 pieces Delivery: 45 days
#14

6206 2Z C3 DEEP grv

6206 2Z C3 DEEP grv

10 pieces Delivery: 45 days
#15

6207 ZZ DEEP grv

6207 ZZ DEEP grv

2 pieces Delivery: 45 days
#16

6208 ZZ DEEP grv

6208 ZZ DEEP grv

10 pieces Delivery: 45 days
#17

6208 ZZ C3 DEEP grv

6208 ZZ C3 DEEP grv

6 pieces Delivery: 45 days
#18

6209 2RS DEEP grv

6209 2RS DEEP grv

6 pieces Delivery: 45 days
#19

6209 C3 Single Deep grv

6209 C3 Single Deep grv

6 pieces Delivery: 45 days
#20

6209 ZZ C3 DEEP grv

6209 ZZ C3 DEEP grv

4 pieces Delivery: 45 days
#21

6212 ZZ DEEP grv

6212 ZZ DEEP grv

2 pieces Delivery: 45 days
#22

6222 M C3 Single Row

6222 M C3 Single Row

1 pieces Delivery: 45 days
#23

6304 Zz Deep grv

6304 Zz Deep grv

16 pieces Delivery: 45 days
#24

6308 Zz Deep grv

6308 Zz Deep grv

16 pieces Delivery: 45 days
#25

6308 ZZ C3 DEEP grv

6308 ZZ C3 DEEP grv

6 pieces Delivery: 45 days
#26

6309 2rs Deep grv

6309 2rs Deep grv

6 pieces Delivery: 45 days
#27

6209 C3 Single Row Dep

6209 C3 Single Row De

2 pieces Delivery: 45 days
#28

6309 Z C3 Deep grv

6309 Z C3 Deep grv

6 pieces Delivery: 45 days
#29

6309 zz deep grv

6309 zz deep grv

18 pieces Delivery: 45 days
#30

6310 C3 Sing Row DEEP

6310 C3 Sin Row DEEP G

2 pieces Delivery: 45 days
#31

6310 Zz Deep grv

6310 Zz Deep grv

2 pieces Delivery: 45 days
#32

6312 Z C3 Deep grv

6312 Z C3 Deep grv

2 pieces Delivery: 45 days
#33

6312 Zz Deep grv

6312 Zz Deep grv

6 pieces Delivery: 45 days
#34

6312 Zz C3 Deep grv

6312 Zz C3 Deep grv

2 pieces Delivery: 45 days
#35

6313 Zz Deep grv

6313 Zz Deep grv

8 pieces Delivery: 45 days
#36

6316 C3 Deep grv

6316 C3 Deep grv

6 pieces Delivery: 45 days
#37

6319 C3 Deep grv

6319 C3 Deep grv

10 pieces Delivery: 45 days
#38

6319 C3 Insul Insocot

6319 C3 Insul Insocot

1 pieces Delivery: 45 days
#39

7220 BE C BM Single

7220 BE C BM Single

3 pieces Delivery: 45 days
#40

NU206 EC C3 Row Cyl

NU206 EC C3 Row Cyl

8 pieces Delivery: 45 days
#41

Nu222 E M C3 Sin Row

Nu222 E M C3 SingRow

1 pieces Delivery: 45 days
#42

NU310 Cyl Roller

NU310 Cyl Roller

3 pieces Delivery: 45 days
#43

6224 C3 S Deep grv

6224 C3 S Deep grv

3 pieces Delivery: 45 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar bearing supply

4

Financial statements or turnover proof

5

EMD/Security deposit documents (as applicable)

6

Technical bid documents demonstrating OEM conformity

7

OEM authorization letters or certificates for SKF / FAG / NTN

8

Certificate of Conformity or OEM documentary confirmation for serial numbers

Frequently Asked Questions

Key insights about TELANGANA tender market

How to bid for bearing tender in Karimnagar Telangana 2026

This tender requires OEM-conformity certificates for SKF, FAG or NTN bearings, plus Certificates of Conformity for serial numbers. Submit GST, PAN, experience, financials, and OEM authorizations; the scope covers 43 bearing items, including deep groove variants. Follow ATC guidelines and ensure 25% quantity flexibility is planned in your bid.

What documents are required for bearing tender in Telangana?

Bidders must provide GST registration, PAN card, experience certificates for similar supplies, financial statements, EMD documentation, technical bid content, OEM authorizations, and Certificates of Conformity confirming serial-number compatibility with SKF/FAG/NTN bearings.

What are the OEM brand requirements for the Ramagundam Bearings tender?

Only SKF, FAG, or NTN brands are preferred; alternative brands require internal TEC committee evaluation. Serial-number conformity must be backed by OEM certificates, and bidders must submit conformity documentation during supply.

When is the delivery timeline and quantity variation for this bearing tender?

Delivery timeline is governed by the option clause, with a minimum baselined delivery window of 30 days for extended periods. Quantity may vary by up to 25% of bid quantity at contract placement and during the currency at contracted rates.

What are the essential technical specifications for deep groove bearings in this tender?

The scope includes multiple deep groove variants: 6209 C3 Deep grv, 6312 Zz Deep grv, and related SKUs; ensure compatibility with OEM specifications, proper tolerances, and cage types as per serial-number documentation and technical committee guidance.

How to verify EMD and payment terms for the bearing procurement?

EMD details are not disclosed here; verify in the final ATC. Payment terms will be clarified in the tender’s payment clause; bidders should prepare for standard government terms and ensure submission of EMD documents with their bid.

What is the scope of 43 item BOQ for bearings in this tender?

BOQ specifies 43 bearing items, spanning deep groove, Zz and insul variants with multiple sizes; exact quantity per item is not disclosed publicly, so bidders must rely on supplier capacity and OEM certifications to plan stock and delivery.

What qualifies as acceptable evidence for past performance in this tender?

Bidders should provide PTR-like past track records, with prior supply experience for similar bearings to large plants or government procurement. The TEC committee will review past performance when evaluating non-specified makes.