Bid Publish Date
14-Aug-2026, 1:19 pm
Bid End Date
05-Sep-2026, 9:00 am
Location
Progress
A tender has been published for Bharat Petroleum Corporation Ltd SITC OF RACK MONITORING UNIT RMU AS PER SOW, SITC TRUCK TESTER FOR OVERSPILL SENSOR AS PER SOW, ASSOCIATED ELECTRICAL AND CABLING WORK FOR INSTALLATION OF RMU WITH BCU AS PER SOW, INTEGRATION WORK FOR RMU WITH EXISTING BATCH CONTROL UNIT AS PER SOW, SITC OF 3 INCH VAPOUR LOADING ARM WITH 4 INCH CAM TYPE BREAKAWAY 3X4 INCH VAPOUR COUPLER AS PER SOW in NASHIK, MAHARASHTRA. Quantity: 24 by. Submission Deadline: 05-09-2026 09: 00: 00. Check eligibility and apply.
Quantity
24
Category
SITC OF RACK MONITORING UNIT RMU AS PER SOW
Bid Type
Two Packet Bid
Bid Validity
60 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
30
OEM Avg. Turnover
30
Past Performance
40 %
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
SITC OF RACK MONITORING UNIT RMU AS PER SOW , SITC TRUCK TESTER FOR OVERSPILL SENSOR AS PER SOW , ASSOCIATED ELECTRICAL AND CABLING WORK FOR INSTALLATION OF RMU WITH BCU AS PER SOW , INTEGRATION WORK FOR RMU WITH EXISTING BATCH CONTROL UNIT AS PER SOW , SITC OF 3 INCH VAPOUR LOADING ARM WITH 4 INCH CAM TYPE BREAKAWAY 3X4 INCH VAPOUR COUPLER AS PER SOW
Advisory Bank
ICICI
ePBG Percentage
5%
ePBG Duration (Months)
18
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
Nashik
Delivery Pincodes
423104
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Pradeep Singh | 423104,Manmad Installation, Manmad - Nandgaon Road, Manmad- 423104 | Nashik | Maharashtra | 423104 | 16 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
05-Sep-2026, 3:30 am
Opening Date
05-Sep-2026, 4:00 am
SITC OF RACK MONITORING UNIT RMU AS PER SOW
SITC OF RACK MONITORING UNIT (RMU) AS PER SOW
SITC TRUCK TESTER FOR OVERSPILL SENSOR AS PER SOW
SITC TRUCK TESTER FOR OVERSPILL SENSOR AS PER SOW
ASSOCIATED ELECTRICAL AND CABLING WORK FOR INSTALLATION OF RMU WITH BCU AS PER SOW
ASSOCIATED ELECTRICAL AND CABLING WORK FOR INSTALLATION OF RMU WITH BCU AS PER SOW
INTEGRATION WORK FOR RMU WITH EXISTING BATCH CONTROL UNIT AS PER SOW
INTEGRATION WORK FOR RMU WITH EXISTING -BATCH CONTROL UNIT AS PER SOW
SITC OF 3 INCH VAPOUR LOADING ARM WITH 4 INCH CAM TYPE BREAKAWAY 3X4 INCH VAPOUR COUPLER AS PER SOW
SITC OF 3 INCH VAPOUR LOADING ARM MOC CS PLUS AL WITH 4 INCH CAM TYPE BREAKAWAY AND 3X4 INCH VAPOUR COUPLER AS PER SOW
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | SITC OF RACK MONITORING UNIT RMU AS PER SOW | SITC OF RACK MONITORING UNIT (RMU) AS PER SOW | 16 | ea | engg_manmad | 60 | |
| 2 | SITC TRUCK TESTER FOR OVERSPILL SENSOR AS PER SOW | SITC TRUCK TESTER FOR OVERSPILL SENSOR AS PER SOW | 2 | ea | engg_manmad | 60 | |
| 3 | ASSOCIATED ELECTRICAL AND CABLING WORK FOR INSTALLATION OF RMU WITH BCU AS PER SOW | ASSOCIATED ELECTRICAL AND CABLING WORK FOR INSTALLATION OF RMU WITH BCU AS PER SOW | 1 | ls | engg_manmad | 60 | |
| 4 | INTEGRATION WORK FOR RMU WITH EXISTING BATCH CONTROL UNIT AS PER SOW | INTEGRATION WORK FOR RMU WITH EXISTING -BATCH CONTROL UNIT AS PER SOW | 1 | ls | engg_manmad | 60 | |
| 5 | SITC OF 3 INCH VAPOUR LOADING ARM WITH 4 INCH CAM TYPE BREAKAWAY 3X4 INCH VAPOUR COUPLER AS PER SOW | SITC OF 3 INCH VAPOUR LOADING ARM MOC CS PLUS AL WITH 4 INCH CAM TYPE BREAKAWAY AND 3X4 INCH VAPOUR COUPLER AS PER SOW | 4 | ea | engg_manmad | 60 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer