Progress
National Investigation Agency (nia) announces a tender for MCB Box, MINI MCB, Self Adhesive PVC electrical Insulation Tape, PVC Clip, 6-Moduler Box, 8-Moduler Box, 12- Moduler Box, Wire, Socket, Switch, Fan speed regulator, Capacitor for Fan, 3 Pin Top, PVC Band, PVC Casing, PVC Pipe, Flexible Pipe, Role Plug, Screw, Exaust Fan, Tube light, PC Light in JAIPUR, RAJASTHAN. Quantity: 377. Submission Deadline: 17-03-2025 09: 00: 00. Last date to apply is approaching fast!
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | HR ENTERPRISES Under PMA | - | 14-03-2025 14:49:09 | |
| 2 | Insight Saket Enterprises Under PMA | - | 16-03-2025 21:38:29 | |
| 3 | MODI ENTERPRISE Under PMA | - | 14-03-2025 13:22:28 | |
| 4 | NEEL ENTERPRISES Under PMA | - | 14-03-2025 11:24:57 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | NEEL ENTERPRISES Under PMA | Item Categories : MCB Box,MINI MCB,Self Adhesive PVC electrical Insulation Tape,PVC Clip,MCB Box,6-Moduler Box,8-Modu | |
| L2 | HR ENTERPRISES Under PMA | Item Categories : MCB Box,MINI MCB,Self Adhesive PVC electrical Insulation Tape,PVC Clip,MCB Box,6-Moduler Box,8-Modu | |
| L3 | MODI ENTERPRISE Under PMA | Item Categories : MCB Box,MINI MCB,Self Adhesive PVC electrical Insulation Tape,PVC Clip,MCB Box,6-Moduler Box,8-Modu | |
| L4 | Insight Saket Enterprises (MSE)( MSE Social Category:General ) Under PMA | Item Categories : MCB Box,MINI MCB,Self Adhesive PVC electrical Insulation Tape,PVC Clip,MCB Box,6-Moduler Box,8-Modu |
Quantity
377
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
Min. Avg. Annual Turnover
3
OEM Avg. Turnover
3
Past Performance
10 %
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
MCB Box , MINI MCB , Self Adhesive PVC electrical Insulation Tape , PVC Clip , 6-Moduler Box , 8-Moduler Box , 12- Moduler Box , Wire , Socket , Switch , Fan speed regulator , Capacitor for Fan , 3 Pin Top , PVC Band , PVC Casing , PVC Pipe , Flexible Pipe , Role Plug , Screw , Exaust Fan , Tube light , PC Light
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
Extended Deadline
17-Mar-2025, 3:30 am
Opening Date
17-Mar-2025, 4:00 am
Experience Criteria
Past Performance
Bidder Turnover
OEM Authorization Certificate
OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about RAJASTHAN tender market
The eligibility requirements include being a registered entity with a minimum average annual turnover of ₹3 Lakhs. Bidders must submit OEM Authorization Certificates and demonstrate past performance credentials. Supporting documents for exemptions from experience will also be assessed.
Bidders must provide certifications such as OEM Authorization Certificates, past performance records, and financial reports that validate their claims of annual turnover. These documents ensure that the bidder meets the minimum requisite standards set for participation.
Bidders need to register on the GeM portal to submit their bids. Documentation should be uploaded in the specified formats outlined in the tender details. After registration, entities can access the bidding section and submit their proposals electronically.
The accepted document formats generally include PDF for certification and financial documents along with other permissible formats as indicated within the tender documents. It is vital to ensure that all uploaded documents adhere to the specified guidelines to avoid disqualification.
Bids will be evaluated based on compliance with eligibility criteria, technical specifications, and financial offerings, emphasizing total value when comparing proposals. The results will be communicated through the GeM system to all participants once evaluations are finalized.