TenderDekho Logo
Active GEM

South East Central Railway All in One PC (V2) Q2 Tender 2026 Rajasthan-like Procurement

Bid Publish Date

09-Oct-2026, 10:43 am

Bid End Date

19-Oct-2026, 9:00 am

Progress

Issue09-Oct-2026, 10:43 am
AwardPending

Key Highlights

  • • OEM Authorization required for All in One PC (V2) Q2 procurement per Railway Board guidelines
  • • Past performance: minimum 20% of bid quantity in last 3 years with CRAC/Receipt Note/CRN/Challan
  • • Inspection regime: post-receipt inspection at consignee site; pre-dispatch inspection NA if not selected
  • • Delivery: quantity may rise/fall by up to 25%; delivery period adjusts proportionally with minimum 30 days

Tender Overview

Organization: South East Central Railway (Indian Railways); Product category: All in One PC (V2) Q2; Location: location not disclosed in tender; Estimated value / EMD: not specified; Scope: supply of goods only (no installation). The tender includes quantity variation up to ±25% during contract tenure with extension rules tied to original delivery period. Pre- or post-dispatch inspection arrangement is via consignee or NA for pre-dispatch. OEM authorization and past performance documentation are mandatory under ATC; supplier must show CRAC/receipt notes for similar items.

  • Key differentiator: option clause enabling quantity adjustments; inspection by nominated agency at consignee site; GeM ATC compliance with OEM authorization from Railway Board guidelines.
  • Unique aspect: strict past performance evidence (minimum 20% of bid quantity in last 3 years) and six-month satisfactory performance certificate required.

Technical Specifications & Requirements

  • No formal technical specifications provided in the tender text; bidders must rely on product name “All in One PC (V2) Q2” and ensure compliance with OEM authorization requirements.
  • Certificates/Documentation: upload necessary certificates; ensure BIS/IS/ISO as applicable by OEM/ATC; ensure GST considerations noted by bidder; bid price to include all costs.
  • Inspection: post-receipt inspection at consignee site; pre-dispatch inspection via NA if applicable; bidder to adhere to inspection process as defined by ATC.
  • Compliance: OEM authorization from the OEM directly; past performance proof including CRAC/Receipt Note/CRN/Challan; minimum six-month performance certificate.

Terms, Conditions & Eligibility

  • EMD not specified in the extract; bidders must comply with ATC and GeM terms.
  • Delivery: extended delivery periods possible based on option clause; additional time formula tied to quantity/period; minimum 30 days.
  • Payment terms: GST handling to be borne by bidder; no explicit payment schedule provided in extract.
  • Documentation: mandatory certificates and performance evidence; GST status to be verified by bidder; ensure bidder eligibility per ATC.
  • Warranty/Penalties: not explicitly stated; ATC requires adequate OEM authorization and past performance proof.
  • Compliance: submit OEM authorization as per Railway Board guidelines; provide six-month performance certificate; paste performance proof for similar items.

Key Specifications

  • Product: All in One PC (V2) Q2

  • Quantity: ±25% variation permitted during contract; delivery timeline linked to original period with minimum 30 days

  • Inspection: Post-receipt inspection at consignee site; pre-dispatch inspection not applicable unless ATC specifies

  • Documentation: OEM authorization, past performance certificates, six-month performance certificate

  • Compliance: GeM ATC obligations; GST handling by bidder; supplier to upload all required certificates

Terms & Conditions

  • OD/Delivery: option to adjust quantity up to 25%; extended delivery time calculated by (increase/original) × original period

  • Performance: minimum 6 months satisfactory performance certificate required

  • Documentation: OEM authorization and past performance proof mandatory; post-delivery inspection at consignee site

Important Clauses

Payment Terms

GST is to be borne by bidder; reimbursement will be as per actuals or applicable rates, whichever is lower

Delivery Schedule

Delivery period governed by option clause; additional time formula with minimum 30 days; extended period may use original delivery period as base

Penalties/Liquidated Damages

Not explicitly stated in extract; penalties to be determined per ATC guidance and Railway Board norms

Bidder Eligibility

  • OEM authorization from the principal manufacturer as per Railway Board guidelines

  • Past performance: evidence covering at least 20% of bid quantity in last 3 years

  • Satisfactory performance certificate for minimum 6 months from previous customer/end user

Advertisement

Tender Data

Bid Details

Quantity

4

Bid Type

Single Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

20 %

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

All in One PC (V2) (Q2)

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Rajnandgaon

Delivery Pincodes

491445

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Shailendra Kumar Dhamde491445,Office of the Sr Section Engineer/RRD/DGG Near sleeper factory, Dongargarh, Rajnandgaon (CG) Pin:491445RajnandgaonChhattisgarh491445460-

Authority Records

MINISTRY OF RAILWAYS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9995900.pdf

Main Document

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Department

Indian Railways

Office Name

Hq New General Manager Secr

Grievance Contact

[email protected]

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates demonstrating past performance (minimum 20% of bid quantity in last 3 years)

4

Financial statements / solvency certificates

5

OEM authorisation / Bid Specific Authorization from OEM

6

CRAC/Receipt Note/CRN/Receipt Challan for similar GeM catalog items

7

Certificate of satisfactory performance for at least 6 months

8

Any other certificates requested in ATC/Corrigendum

Frequently Asked Questions

Key insights about CHHATTISGARH tender market

How to bid for All in One PC tender in SECR railway 2026

Bidders must submit GST, PAN, OEM authorization, and past performance certificates showing at least 20% of bid quantity in the last 3 years. Include six-month performance certificate and CRAC/CRN for similar items. Ensure GeM ATC compliance and post-receipt inspection readiness at consignee.

What documents are required for SECR All in One PC bid 2026

Required documents include GST registration, PAN, experience certificates, financial statements, OEM authorization, CRAC/Receipt Note/CRN/Challan for similar items, and six-month performance certificate; ensure these are uploaded with the bid as per ATC.

What are the delivery terms for SECR All in One PC tender

Delivery can be extended if the quantity changes by up to 25%; additional time is calculated as (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days. The base delivery period starts from the last date of the original delivery order.

Which OEM authorization is required for SECR PC tender 2026

Bidder must quote with Bid Specific Authorization from the OEM as per Railway Board guidelines; direct OEM authorization is mandatory to participate under ATC terms.

What inspection is required for SECR PC procurement

Post-receipt inspection is conducted at the consignee site before acceptance. Pre-dispatch inspection is not mandatory unless specified in ATC; ensure readiness to facilitate consignee inspection.

What are the GST implications for SECR PC tender

Bidder bears GST; reimbursement will be based on actuals or the lower applicable rate, up to the quoted GST percentage. Include GST details in bid for transparent pricing.

What past performance evidence is needed for SECR tender

Provide CRAC/Receipt Note/CRN/Challan showing quantity and date of supply for similar GeM catalog items; minimum 20% of bid quantity in last 3 years; include purchaser/signed certificates.

What is the scope of supply for the SECR PC tender

Scope is Limited to supply of goods only; no installation services mentioned; ensure OEM-certified hardware, warranty terms aligned with supplier capabilities, and compliance with ATC.