Progress
Organization: Gail India Limited. Procurement of a Pressure reducing valve (Q3) intended for implementation in Faridabad, Haryana. Tender scope lacks BOQ items and an estimated value, with no start/end dates disclosed. An ATC document has been uploaded by the buyer, indicating vendor-specific terms to be followed. The tender’s uniqueness lies in its reliance on an accompanying ATC file rather than conventional spec sheets, requiring bidders to align with Gail India’s internal criteria and any supplementary ATC provisions. This creates a focused compliance path for manufacturers or distributors of PRV equipment seeking supply contracts in the Indian energy sector.
Keywords: tender in Faridabad, Gail India Limited procurement, pressure reducing valve bid, ATC based tender, Q3 valve supplier, IS/IS0 standard verification, government procurement in Haryana, energy sector valve supply
Product/service name: Pressure reducing valve (Q3)
Location: Faridabad, Haryana
ATC document uploaded by buyer (refer to terms)
BOQ: 0 items (no listed quantities)
Estimated value: Not disclosed
EMD: Not disclosed
Standards/Certification: Not specified in provided data; verify via ATC
Delivery/Installation: Not specified; verify via ATC
Brand/OEM: Not specified; verify via ATC
EMD: Amount and mode to be clarified in ATC; bidders must confirm before submission
Delivery terms and payment terms to be derived from ATC; ensure alignment with Gail India Limited
OEM/brand and installation requirements are to be confirmed via the uploaded ATC document
Payment terms to be defined in ATC; bidders should check for advance, milestone, or post-delivery payment conditions
Delivery timeline to be specified in ATC; verify lead times, installation windows, and site readiness
Penalty provisions, if any, will be stated in ATC; bidders must review for LD percentages and cap
Demonstrated experience in supplying pressure reducing valves or similar valve assemblies
Ability to meet ATC-specified terms including delivery timelines and warranty
Financial capacity evidenced by turnover and financial statements as per ATC requirements
Quantity
1
Bid Type
Single Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
3 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Pressure reducing valve (Q3)
Payment Timelines
Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Faridabad
Delivery Pincodes
121004
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Vijay Pargi | 121004,GAIL (India) Limited, Chhainsa Compressor Station, Chhainsa, Tehsil Ballabhgarh, Distt. Faridabad | Faridabad | Haryana | 121004 | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates (relevant PRV or valve supply)
Financial statements / turn over documents
EMD/Security deposit as per ATC
Technical bid documents aligned to ATC
OEM authorization if distributor/sub-agent
Any site clearance or installation capability proof as per ATC
Warranty/support commitments (as applicable per ATC)
Key insights about HARYANA tender market
Bidders must review the ATC uploaded by Gail India Limited, gather GST, PAN, and experience certificates, and ensure EMD is prepared as per ATC. The tender requires PRV (Q3) equipment, with delivery and warranty terms defined in the ATC. Ensure OEM authorizations are provided if acting as a distributor.
Required documents include GST registration, PAN, financial statements, experience certificates for valve supplies, EMD document, OEM authorizations if applicable, and technical bid aligned with the ATC. Prepare installation and warranty disclosures as per ATC guidelines.
Technical specifications are not listed in the public data; bidders must consult the uploaded ATC document from Gail India Limited for exact valve model, size, pressure ratings, installation requirements, and compatibility with IS/standards referenced therein.
EMD details are not disclosed in the public data; bidders should rely on the ATC document which will specify the exact EMD amount, payment mode (DD/online) and submission deadline aligned to the procurement process.
Delivery schedule is defined in the ATC; bidders must verify lead time from order date, installation windows, and any on-site commissioning requirements stated by Gail India Limited.
Standards are not listed publicly; the ATC will specify required certifications. Bidders should check for ISI, ISO, or other organization-specific compliance mentioned in the ATC.
Submit per ATC guidelines: include technical bid, financial bid, EMD, OEM authorizations if applicable, and all requested documents. Follow portal instructions, ensure data consistency with ATC, and confirm submission before the deadline.
Eligibility centers on prior experience with valve supplies, financial stability evidenced by statements, GST/PAN compliance, and adherence to ATC terms including delivery, warranty, and installation capabilities as specified by Gail India Limited.