Tender Overview
Hindustan Aeronautics Limited (HAL), specifically the Sukhoi Engine Division, Sunabeda, Odisha, seeks procurement for the upgradation of existing Siemens 840D CNC Controller & PCU 50. The scope encompasses Supply, Installation, Testing and Commissioning of the upgraded control systems. While the BOQ lists no itemized quantities, the terms authorize delivery and commissioning at the HAL facility in Sunabeda. The bid includes a flexible quantity clause up to 50% variance and requires GST-compliant invoicing to the consignee. This procurement targets modernizing critical CNC hardware to ensure operational readiness of the Sukhoi engine division.
Technical Specifications & Requirements
- Scope of supply: Supply, Installation, Testing and Commissioning of the upgraded Siemens 840D CNC Controller and PCU 50 as per stated scope.
- Delivery location: HAL Sukhoi Engine Division, Sunabeda-2, Koraput District, Odisha 763002.
- Demurrage/penalties: Demurrage at 0.5% of total contract value per day for 48 hours non-lift; items may be destroyed after one month if not lifted.
- Invoice & GST: Invoices raised in the consignee name with the consignee GSTIN; GST paid via GST portal with scanned GST invoice, per actuals or applicable rate.
- Option clause: Buyer may alter quantity by ±50% at contract placement or during currency with proportional delivery calculations.
- Scope notes: All price should include supply, installation, testing and commissioning. No BOQ items shown.
- Compliance: No explicit technical standards listed; bidders must align to HAL installation requirements at the Sukhoi facility.
Terms, Conditions & Eligibility
- Documents for Vendor Code: PAN Card, GSTIN, Cancelled Cheque, EFT Mandate certified by bank.
- GST treatment: GST applicability to be determined by bidder; reimbursement as actuals or applicable rates, whichever is lower, up to quoted GST.
- Delivery & commissioning: Delivery and commissioning at HAL Sunabeda; option clause governs quantity and delivery period calculations.
- Payment terms: Invoice processing aligned to GST compliance; no explicit advance terms stated.
- Risk & penalties: Demurrage; item destruction if unlifted after one month; 48-hour lift period critical for rejection handling.
- Additional notes: No BOQ; scope includes supply, installation, testing and commissioning; GST invoice requirements mandatory on GeM portal.