TenderDekho Logo
GEM

Contract Bidding Open For FLP, WP LED Hand Lamp, 15 W,FLP, WP Ltg. Transformer in GOLAGHAT, ASSAM

Bid Publish Date

16-Feb-2026, 12:26 pm

Bid End Date

09-Mar-2026, 1:00 pm

Latest Corrigendum Available

Progress

Issue16-Feb-2026, 12:26 pm
Corrigendum28-Feb-2026
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

340

Category

FLP, WP LED Hand Lamp, 15 W

Bid Type

Two Packet Bid

Categories 4

Numaligarh Refinery Limited invites bids for FLP, WP LED Hand Lamp, 15 W, FLP, WP Ltg. Transformer in GOLAGHAT, ASSAM. Quantity: 340. Submission Deadline: 09-03-2026 13: 00: 00. Submit your proposal before the deadline.

Documents 6

GeM-Bidding-8991480.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

9M Pole,200W LED Lights with FLP Enclosure,200W LED lights,120 W LED lights with FLP Enclosure,120

Hindustan Petroleum Corporation Ltd

Ajmer, RAJASTHAN

Posted: 30 August 2025
Closed: 12 September 2025
GEM

Supply 350W LEDlight,Supply150W FLP light

Hindustan Petroleum Corporation Ltd

INDORE, MADHYA PRADESH

Posted: 5 February 2025
Closed: 17 February 2025
GEM

FIXT LGHTG; FLP WELL GLS, 110V, 18W, LED

Western Coalfields Limited

BETUL, MADHYA PRADESH

Posted: 30 January 2026
Closed: 20 February 2026
GEM

LED FIXTURE 90W, T6, EXD, IIC, FLOOD LIGHT,FLP LED FLOOD LIGHT, 150W, WX-D, IP66,FLP LED FLOOD LIGH

Gail India Limited

Posted: 4 November 2024
Closed: 25 November 2024
GEM

60 W FLP LED BOTTOM LIGHT,120W LED STREET LIGHT,350W LED Flood Light,250W FLP LED FLOOD LIGHT,CAB 4

Bharat Petroleum Corporation Ltd

FARIDABAD, HARYANA

Posted: 3 September 2025
Closed: 13 September 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Certificate (Requested in ATC)

3

OEM Authorization Certificate

4

Additional Doc 1 (Requested in ATC)

5

Additional Doc 2 (Requested in ATC)

6

Additional Doc 3 (Requested in ATC)

7

Additional Doc 4 (Requested in ATC)

8

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

2 Updates
#1

Update

28-Feb-2026
#2

Update

28-Feb-2026

Extended Deadline

09-Mar-2026, 1:00 pm

Opening Date

09-Mar-2026, 1:30 pm