The Indian Council Of Agricultural Research (ICAR) under the Department Of Agricultural Research And Education invites bids for a HOT AIR DRYER to be supplied, installed, tested, and commissioned at ICAR CIBA Muttukadu Experimental Station, Kovalam, Muttukadu, Chennai 603112. Bid includes the option to increase/decrease quantity by up to 25% at contracted rates, with delivery aligned to original and extended periods. The contract requires delivery, installation and commissioning by OEM or OEM-certified resources, ensuring end-to-end turn-key deployment at the specified site. The tender emphasizes bidder financial health and GST compliance, with the EMD ₹37,820 and turnover documentation mandated.
Key differentiators include on-site commissioning, strict adherence to the delivery schedule, and a clause enabling scope adjustment during the currency of the contract, all within the governance of ICAR CIBA procurement norms. Unique site installation requirements and end-user delivery at the MES address are highlighted to ensure site readiness and operational readiness of the hot air drying system.
Product/service: HOT AIR DRYER
EMD: ₹37,820
Delivery address: ICAR CIBA MES, Muttukadu, Chennai 603112
Scope: Supply, Installation, Testing and Commissioning
Installation: OEM / OEM-certified resource or OEM authorised reseller
Quantity variation: up to 25% during contract
GST: bidder to determine; reimbursement as actuals or quoted rate
Turnover: last 3 years audited statements or CA certificate
BoQ: No items listed; confirm via bid document
EMD amount and payment terms specified: ₹37,820
Delivery to ICAR CIBA MES Chennai; installation by OEM personnel
Quantity may vary by up to 25% with proportional delivery adjustments
GST will be reimbursed as actuals or at quoted rate, whichever is lower; EMD payable as per bid terms
Delivery period aligned to original order; extended delivery time calculated if option clause exercised
LD, penalties or other remedies not specified in data; bidders to align with standard ICAR CIBA terms
Not under liquidation or similar proceedings
Submit turnover evidence for last 3 years
OEM or OEM-certified reseller with installation capability
GST compliant bidder with valid GST registration
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
20 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
9
OEM Avg. Turnover
20
Past Performance
30 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
HOT AIR DRYER
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
24
Pre-Bid Date
13-08-2026 11:00:00
Pre-Bid Venue
ICAR-CIBA, Muttukadu Experimental Station, Kovalam Post, Muttukadu, Chennai-613112.
Max Delivery Days
22
Delivery Locations
1
Delivery Cities
Chengalpattu
Delivery Pincodes
603112
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Aravind R | 603112,Muttukadu Experimental Station, Kovalam Post, Muttukadu, Chennai- 613112 | Chengalpattu | Tamil Nadu | 603112 | 1 | 22 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
Permanent Account Number (PAN) card
Audited financial statements or CA certificate showing turnover (last 3 years)
Experience certificates for similar supply, installation and commissioning
OEM authorisation or OEM certified reseller authorization
End User Certificate (if requested by buyer)
Bid security/EMD payment proof of ₹37,820
Technical compliance certificates (if applicable)
GST calculation justification and rate considered
Any other documents specified in Terms and Conditions
Key insights about TAMIL NADU tender market
Bidders must submit GST registration, PAN, turnover certificates for the last 3 years, and EMD ₹37,820. Provide OEM authorization, installation capability proof, and end-user certificate if requested. The bid requires on-site installation by OEM personnel and adherence to the 25% quantity variation clause.
Required documents include GST registration, PAN card, audited turnover statements or CA certificate, experience certificates for similar projects, OEM authorization, EMD receipt, technical compliance certificates, and any End User Certificate if demanded by the buyer. Ensure on-time submission as per T&C.
Installation must be carried out by OEM or OEM-certified personnel at ICAR CIBA MES, Chennai. The scope includes supply, installation, testing and commissioning, with on-site support. Ensure contractor has established service capability and access to required tools for commissioning.
Delivery timeline aligns with the original delivery order and may extend if the option clause is exercised. The additional time formula is (Increased quantity / Original quantity) × Original delivery period, with a minimum of 30 days.
The bid requires an earnest money deposit of ₹37,820. Provide proof of payment with the bid; ensure that the EMD is valid during bid validity and contract award processes.
Scope includes Supply, Installation, Testing and Commissioning of the hot air dryer. The bid price should cover all cost components. On-site commissioning must be performed by OEM or authorized personnel with proper documentation.