Invitation to Bid - Group-1 - Radiation Survey Meter-02 Nos, Personal digital dosimeter-04 Nos, Ultrasonic testing mach in GAUTAM BUDDHA NAGAR, UTTAR PRADESH

Bid Publish Date

02-Nov-2026, 4:53 pm

Bid End Date

27-Nov-2026, 5:00 pm

Generate Docs

Progress

Issue02-Nov-2026, 4:53 pm
Corrigendum20-Nov-2026
AwardPending

Bharat Heavy Electricals Limited (bhel) announces a tender for Group-1 - Radiation Survey Meter-02 Nos, Personal digital dosimeter-04 Nos, Ultrasonic testing mach in GAUTAM BUDDHA NAGAR, UTTAR PRADESH. Quantity: 86. Submission Deadline: 27-11-2026 17: 00: 00. Last date to apply is approaching fast!

Advertisement

Authority & Contact

Tender Data

Bid Details

Quantity

86

Category

Group-2- Digital Radiography-02 Nos along with all accessories

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Group wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

27

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

365

Delivery Locations

1

Delivery Cities

Gautam Buddha Nagar

Delivery Pincodes

201301

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Raeesul Azam201301,BHEL-PEM, PLOT NO- 25, SECTOR-16A, NOIDAGautam Buddha NagarUttar Pradesh2013011365-

Authority Records

MINISTRY OF HEAVY INDUSTRIESHEAVY INDUSTRY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-10112385.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 30 Items Sign in for GEM prices

#1

Group-1 - Radiation Survey Meter-02 Nos, Personal digital dosimeter-04 Nos, Ultrasonic testing machine-Conventional with Probes and calibration blocks-02 Nos with all accessories

Group-1 -Total lump sum price Radiation Survey Meter-02 Nos (01 in Talcher and 01 in Lara), Personal digital dosimeter-04 Nos (02 in Talcher and 02 in Lara), Ultrasonic testing machine-Conventional with Probes and calibration blocks-02 Nos (01 in Talcher and 01 in Lara) with all accessories

1 lot Delivery: 365 days
#2

Group-1- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

Group-1- Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

4 days Delivery: 365 days
#3

Group-1 - site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

Group-1 - Total lump sum Price for site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

2 visit Delivery: 365 days
#4

Group-2- Digital Radiography-02 Nos along with all accessories

Group-2-Total lump sum Price Digital Radiography-02 Nos (01 in Talcher and 01 in Lara) along with all accessories

1 lot Delivery: 365 days
#5

Group-2- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-04 Days in Talcher and 04 Days in Lara

Group-2- Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-04 Days in Talcher and 04 Days in Lara. Please refer Price Schedule

8 days Delivery: 365 days
#6

Group-2 - site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara

Group-2 - Total lump sum Price for site visit - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara.Please refer Price Schedule.

4 visit Delivery: 365 days
#10

Group-3- Computed Radiography-CR-Scanner-02 Nos-alongwith all accessories Please refer Price Schedule

Group-3- Total lump sum Price-Computed Radiography-CR-Scanner-02 Nos-(01 in Talcher and 01 in Lara) alongwith all accessories Please refer Price Schedule

1 lot Delivery: 365 days
#11

Group-3- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

Group-3- Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

4 days Delivery: 365 days
#12

Group-3- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

Group-3- Total lump sum Price for site visit - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

2 visit Delivery: 365 days
#40

Group-4- MCF_Magnetic Stauroscope_for assessment of quality of PWHT-02 Nos along with all accessories

Group-4-Total lump sum Price for MCF_Magnetic Stauroscope_for assessment of quality of PWHT-02 Nos (01 in Talcher and 01 in Lara) along with all accessories

1 lot Delivery: 365 days
#41

Group-4- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

Group-4- Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

4 days Delivery: 365 days
#42

Group-4- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

Group-4- site visit -should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

2 visit Delivery: 365 days
#40

Group-5- Argon Purity tester-02 Nos, Inspector Kit for Welding Inspection-02 Sets, Temperature Gun-02 Nos.,Binoculars-04 Nos.,Laser alignment Kit with target kit-02 Nos. along with all accessories

Group-5-Total lump sum Price for Argon Purity tester-02 Nos(01 in Talcher and 01 in Lara), Inspector Kit for Welding Inspection-02 Nos(01 in Talcher and 01 in Lara),Temperature Gun-02 Nos(01 in Talcher and 01 in Lara),Binoculars-04 Nos. (02 LARA and 02 Talcher),Laser alignment Kit with target kit-02 Nos. (01 LARA and 01 Talcher) along with all accessories

1 lot Delivery: 365 days
#41

Group-5- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-04 Days in Talcher and 04 Days in Lara

Group-5- Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-04 Days in Talcher and 04 Days in Lara

8 days Delivery: 365 days
#42

Group-5- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara

Group-5- site visit -should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-02 Visit in Talcher and 02 Visit in Lara

4 visit Delivery: 365 days
#46

Group-6- Remote Field Eddy current testing_Advance Electro magnetic testing-02 Nos along with all accessories

Group-6-Total lump sum Price for Remote Field Eddy current testing_Advance Electro magnetic testing-02 Nos (01 in Talcher and 01 in Lara), along with all accessories

1 lot Delivery: 365 days
#47

Group-6- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

Group-6-Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

4 days Delivery: 365 days
#48

Group-6- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

Group-6-Total lump sum Price for site visit -should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

2 visit Delivery: 365 days
#49

Group-7- Helium Leak Detector-02 Nos along with all accessories

Group-7-Total lump sum Price for Helium Leak Detector-02 Nos(01 in Talcher and 01 in Lara) along with all accessories

1 lot Delivery: 365 days
#50

Group-7- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

Group-7-Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

4 days Delivery: 365 days
#51

Group-7- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

Group-7- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

2 visit Delivery: 365 days
#52

Group-8- Oxide Measurement for Boiler Tubes-02 Nos along with all accessories

Group-8-Total lump sum Price for Oxide Measurement for Boiler Tubes-02 Nos (01 in Talcher and 01 in Lara) along with all accessories

1 lot Delivery: 365 days
#53

Group-8- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

Group-8-Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

4 days Delivery: 365 days
#54

Group-8- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

Group-8-Total lump sum Price for site visit - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

2 visit Delivery: 365 days
#55

Group-9-Pls refer item discription_ UT Meter, Vernier, Outside _ Inside Micrometer 25_750 dial, Measuring Tape, Paint Thickness Meter, Paint Adhesion Kit

Group-9-Total lump sum Price for Ultrasonic Thickness meter_D-Meter-Digital-04 Nos (02 in Talcher and 02 in Lara), Vernier 300 mm Scale-04 Nos (02 in Talcher and 02 in Lara),Vernier 600 mm Scale-04 Nos (02 in Talcher and 02 in Lara), Outside Micrometre-04 Nos (02 in Talcher and 02 in Lara), Inside Micrometer 25-750_dial-04 Nos (02 in Talcher and 02 in Lara), Measuring Tape-04 Nos (02 in Talcher and 02 in Lara), Paint thickness Meter_Elcometer-Ultrasonic digital-02 Nos (01 in Talcher and 01 in Lara), Paint adhesion testing Kit-02 Nos(01 in Talcher and 01 in Lara) along with all accessories

1 lot Delivery: 365 days
#56

Group-9- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-04 Days in Talcher and 04 Days in Lara

Group-9- Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-04 Days in Talcher and 04 Days in Lara

8 days Delivery: 365 days
#57

Group-9- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

Group-9-Total lump sum Price for site visit- should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

2 visit Delivery: 365 days
#58

Group-10-Internal Oxide Scale System -02 Nos along with all accessories

Group-20-Total lump sum Price for Internal Oxide Scale System -02 Nos (01 in Talcher and 01 in Lara) along with all accessories

1 lot Delivery: 365 days
#59

Group-10- stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

Group-20-Total lump sum Price for stay at site including lodging, boarding, local conveyence etc for Supervision of Erection and Commissioning etc at site-02 Days in Talcher and 02 Days in Lara

4 days Delivery: 365 days
#60

Group-10- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

Group-20-Total lump sum Price for site visit -should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for Sup of E and C etc at site-01 Visit in Talcher and 01 Visit in Lara

2 visit Delivery: 365 days

Categories 85

Corrigendum Updates

2 Updates
#1

Update

20-Nov-2026

Extended Deadline

27-Nov-2026, 11:30 am

Opening Date

28-Nov-2026, 11:30 am

#2

Update

12-Nov-2026

Extended Deadline

20-Nov-2026, 11:30 am

Opening Date

21-Nov-2026, 11:30 am

Required Documents

1

Experience Criteria

2

Certificate (Requested in ATC)

3

OEM Authorization Certificate

4

Additional Doc 1 (Requested in ATC)

5

Additional Doc 2 (Requested in ATC)

6

Additional Doc 3 (Requested in ATC)

7

Additional Doc 4 (Requested in ATC)

8

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer