Bid Publish Date
14-Jul-2026, 10:04 am
Bid End Date
01-Aug-2026, 1:00 pm
Location
Progress
Quantity
2
Category
SPINDLE ASSLEMBLY, RG-7L, HRM
Bid Type
Two Packet Bid
Organization: Bokaro Steel Plant, under the Steel Authority of India Limited. Procurement involves SPINDLE ASSEMBLY RG-7L HRM and WHEEL FLANGE ASSEMBLY RG-7L, HRM with no BOQ items listed. Tender scope appears to be supply-focused, with document verification requirements including PAN, GSTIN, cancelled cheque, EFT mandate, and data sheets. Unique aspects include OEM authorization when bidding via distributors and GST invoice alignment to consignee GSTIN. Location is not explicitly stated in the data, but Bokaro is the key procurement hub, and the tender aligns with steel plant maintenance/upgrade activities. Emphasizes data-sheet alignment and supplier accountability for delivery and post-award obligations.
Product names: SPINDLE ASSEMBLY RG-7L HRM; WHEEL FLANGE ASSEMBLY RG-7L HRM
Data Sheet must match offered specifications
Invoices to be issued with consignee GSTIN
No explicit MOA/BOQ; emphasis on supply capability and OEM authorization
GST invoice to consignee; GST reimbursement rules
Data Sheet alignment mandatory; mismatch risks rejection
OEM authorization required for distributors
GST invoicing in consignee name; reimbursement as per actuals or lower applicable rate
Delivery within contract terms; replacement/rectification for rejected items
Buyer may terminate for non-delivery or misrepresentation; no explicit LD rate provided
Submit PAN and GSTIN; GST invoice in consignee name
Provide OEM authorization if using authorized distributors
Upload product data sheets with bid; ensure parameter matches
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
SPINDLE ASSLEMBLY, RG-7L, HRM , WHEEL FLANGE ASSEMBLY RG-7L, HRM
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
12
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
120
Delivery Locations
1
Delivery Cities
Bokaro
Delivery Pincodes
827001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Kunal Kumar | 827001,DGM(Stores), Stores Department, Steel Gate, Gate No.-9, Bokaro Steel Plant, Bokaro Steel City-827001, Jharkhand | Bokaro | Jharkhand | 827001 | 1 | 120 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque
EFT Mandate certified by Bank
Data Sheet of offered product(s)
OEM Manufacturer Authorization (if bidding via distributor)
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate; upload data sheets; provide OEM authorization if bidding via distributor; ensure GST invoice is in consignee name; delivery terms follow contract and GD requirements.
Required documents include PAN, GSTIN, cancelled cheque, EFT mandate, product data sheet, and OEM authorization if applicable; ensure data sheet matches offered spindle RG-7L HRM and wheel flange RG-7L HRM.
GST invoice must be raised in consignee name with consignee GSTIN; GST reimbursement will follow actuals or applicable rate, whichever is lower, subject to quoted GST percentage.
When bidding via an authorized distributor, provide Manufacturer Authorization with OEM details (name, designation, address, email, phone) to substantiate supply rights for RG-7L HRM parts.
Delivery must occur within contract terms; material must be replaced or Rectified if rejected; acceptance follows inspection per contract and data-sheet alignment.
Bidder must upload a data sheet and ensure technical parameters exactly match the offered product; any unexplained mismatch leads to bid rejection.
The buyer reserves rights to terminate the contract for material term breach, misrepresentation, or insolvency; no fixed liquidated damages rate is stated; termination rights are explicit.
Scope includes SPINDLE ASSEMBLY RG-7L HRM and WHEEL FLANGE ASSEMBLY RG-7L HRM; no BOQ given, emphasis on verified data sheets and OEM authorization.
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS