TenderDekho Logo
Active GEM

Bids are Invited For Complete EDWARD double stage rotary vane vacuum pump along with motor. Model E2M40,Clean and overha in CHITTORGARH, RAJASTHAN

Bid Publish Date

22-Sep-2026, 11:15 am

Bid End Date

21-Oct-2026, 9:00 am

EMD

₹54,485

Generate Docs

Progress

Issue22-Sep-2026, 11:15 am
Corrigendum14-Oct-2026
AwardPending

Nuclear Power Corporation Of India Limited announces a tender for Complete EDWARD double stage rotary vane vacuum pump along with motor. Model E2M40, Clean and overhaul Kit EM40 HC l F, Spare kit blade E2M40, Edward inlet catch pot model ITO100, Oil mist filters Model MF100 Filter, Filter Element MF100, Edward clean application oil return kit, NW40 clamping ring SS, NW40 l 40 centering viton SS Pk1, NW40 l 40 centering ring with screen Viton SS pk1, Edwards NW25 C clamp, NW25 centering ring, Edwards ISO40 Co seal, Cross piece ISO40 l ISO40 NW40, 1 l 2 inch, Special TEE NW25 NW25 1 l 2 inch BSP female, Special adaptor for fixing 1 l 4 BSP male PT100 sensor, ISO 40 to 21. 3mm OD adaptor for inlet port, Clean and Overhaul Kit EM40 HC l F in CHITTORGARH, RAJASTHAN. Quantity: 54. Submission Deadline: 21-10-2026 09: 00: 00. Last date to apply is approaching fast!

Advertisement

Tender Data

Bid Details

Quantity

54

Category

Complete EDWARD double stage rotary vane vacuum pump along with motor. Model E2M40

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

7 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Complete EDWARD double stage rotary vane vacuum pump along with motor. Model E2M40 , Clean and overhaul Kit EM40 HC l F , Spare kit blade E2M40 , Edward inlet catch pot model ITO100 , Oil mist filters Model MF100 Filter , Filter Element MF100 , Edward clean application oil return kit , NW40 clamping ring SS , NW40 l 40 centering viton SS Pk1 , NW40 l 40 centering ring with screen Viton SS pk1 , Edwards NW25 C clamp , NW25 centering ring , Edwards ISO40 Co seal , Cross piece ISO40 l ISO40 NW40, 1 l 2 inch , Special TEE NW25 NW25 1 l 2 inch BSP female , Special adaptor for fixing 1 l 4 BSP male PT100 sensor , ISO 40 to 21.3mm OD adaptor for inlet port , Clean and Overhaul Kit EM40 HC l F

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

11

Payment Timelines

Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

250

Delivery Locations

1

Delivery Cities

Chittorgarh

Delivery Pincodes

323303

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Vyankteshwar Hansraj Patekar323303,NPCIL, Rawatbhata Atomic Power Project 7 and 8, Contracts and Material Management Wing, Anushakti, Via-Kota Rajasthan Which is about 60 Kms. away from Kota.ChittorgarhRajasthan3233031250-

Authority Records

DEPARTMENT OF ATOMIC ENERGY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 8

GeM-Bidding-9831415.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Nuclear Power Corporation Of India Limited

Office Name

Rajasthan

Ministry

PMO

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

14-Oct-2026

Extended Deadline

21-Oct-2026, 3:30 am

Opening Date

22-Oct-2026, 3:30 am

Advertisement

Bill of Quantities (BOQ) 18 Items Sign in for GEM prices

#1

Complete EDWARD double stage rotary vane vacuum pump along with motor. Model E2M40

Complete EDWARD double stage rotary vane vacuum pump along with motor. Model E2M40, Refer Annexure A for full details of items and all supplied items must be follow Annexure A

1 nos Delivery: 250 days
#2

Clean and overhaul Kit EM40 HC l F

Clean and overhaul Kit EM40 HC l F, Refer Annexure A for full details of items and all supplied items must be follow Annexure A

2 set Delivery: 250 days
#3

Spare kit blade E2M40

Spare kit blade E2M40, Refer Annexure A for full details of items and all supplied items must be follow Annexure A

2 nos Delivery: 250 days
#4

Edward inlet catch pot model ITO100

Edward inlet catch pot model ITO100, Refer Annexure A for full details of items and all supplied items must be follow Annexure A

1 nos Delivery: 250 days
#5

Oil mist filters Model MF100 Filter

Oil mist filters Model MF100 Filter, Refer Annexure A for full details of items and all supplied items must be follow Annexure A

1 nos Delivery: 250 days
#6

Filter Element MF100

Filter Element MF100, Refer Annexure A for full details of items and all supplied items must be follow Annexure A

18 nos Delivery: 250 days
#7

Edward clean application oil return kit

Edward clean application oil return kit, Refer Annexure A for full details of items and all supplied items must be follow Annexure A

2 nos Delivery: 250 days
#8

NW40 clamping ring SS

NW40 clamping ring SS, Refer Annexure A for full details of items and all supplied items must be follow Annexure A

4 nos Delivery: 250 days
#9

NW40 l 40 centering viton SS Pk1

NW40 l 40 centering viton S l S Pk1, Refer Annexure A for full details of items and all supplied items must be follow Annexure A

4 nos Delivery: 250 days
#10

NW40 l 40 centering ring with screen Viton SS pk1

NW40 l 40 centering ring with screen Viton SS pk1, Refer Annexure A for full details of items and all supplied items must be follow Annexure A

4 nos Delivery: 250 days
#11

Edwards NW25 C clamp

Edwards NW25 C clamp, Refer Annexure A for full details of items and all supplied items must be follow Annexure A

2 nos Delivery: 250 days
#12

NW25 centering ring

NW25 centering ring, Refer Annexure A for full details of items and all supplied items must be follow Annexure A

2 nos Delivery: 250 days
#13

Edwards ISO40 Co seal

Edwards ISO40 Co seal, Refer Annexure A for full details of items and all supplied items must be follow Annexure A

2 nos Delivery: 250 days
#14

Cross piece ISO40 l ISO40 NW40, 1 l 2 inch

Cross piece ISO40 l ISO40 NW40, 1 l 2 inch, Refer Annexure A for full details of items and all supplied items must be follow Annexure A

2 nos Delivery: 250 days
#15

Special TEE NW25 NW25 1 l 2 inch BSP female

Special TEE NW25 NW25 1 l 2 BSP female, Refer Annexure A for full details of items and all supplied items must be follow Annexure A

2 nos Delivery: 250 days
#16

Special adaptor for fixing 1 l 4 BSP male PT100 sensor

Special adaptor for fixing 1 l 4 BSP male PT100 sensor, Refer Annexure A for full details of items and all supplied items must be follow Annexure A

2 nos Delivery: 250 days
#17

ISO 40 to 21.3mm OD adaptor for inlet port

ISO 40 to 21.3mm OD adaptor for inlet port, Refer Annexure A for full details of items and all supplied items must be follow Annexure A

2 nos Delivery: 250 days
#18

Clean and Overhaul Kit EM40 HC l F

Clean and Overhaul Kit EM40 HC l F, Refer Annexure A for full details of items and all supplied items must be follow Annexure A

1 set Delivery: 250 days

Categories 32

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

OEM Authorization Certificate

2

Additional Doc 1 (Requested in ATC)

3

Additional Doc 2 (Requested in ATC)

4

Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

5

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement