Bharatiya Nabhikiya Vidyut Nigam Limited ABB AC500 LCP Tender Kanchipuram Tamil Nadu 2026

Bid Publish Date

29-Aug-2026, 1:06 pm

Bid End Date

08-Sep-2026, 3:00 pm

EMD

₹1,60,118

Progress

Issue29-Aug-2026, 1:06 pm
AwardPending

Tender Overview

Bharatiya Nabhikiya Vidyut Nigam Limited (Department of Atomic Energy) invites bids for the supply and safe delivery of ABB AC500 PM5630-2ETH redundant CPU & IO Bus modules, accessories per BOM Annexure-I for OLTC LCP, plus installation, testing and commissioning at PFBR site, along with spares per Annexure-IV and DF LCP components per Annexure-II. The package also covers ** ABB PLC cum HMI software license with dongle** per Annexure-III. EMD fixed at ₹160,118. The contract includes estimated quantities across 6 items, with delivery and performance requirements spanning installation, testing, and commissioning activities. Additional terms include a performance security of 5% and an extended LI/defect liability period totaling 18 months. This procurement targets reliable, IS-rated ABB hardware compatibility for OLTC and DF LCP deployments in Tamil Nadu, with GeM terms applying. Tender scope emphasizes BOM adherence, warranty submission, and requisite test certificates.

Technical Specifications & Requirements

  • Product/Service: ABB AC500 PM5630-2ETH redundant CPU & IO Bus modules with accessories as per BOM Annexure-I for OLTC LCP; and Annexure-II for DF LCPs; installation, testing and commissioning at PFBR site; spares per Annexure-IV; PLC cum HMI software license with dongle per Annexure-III.
  • Quantities: 6 total items with multiple lines (1.0 set for OLTC LCP, 2.0 sets for DF LCPs, 1.0 set for spares, 1.0 software license).
  • Delivery/Installation: Complete delivery, installation, and commissioning within the scope defined; site at PFBR with OLTC LCP and DF LCPs.
  • Standards/Quality: Warranty certificate and test certificates to accompany material; storage cum erection all risk policy; workmen compensation policy.
  • EMD/Guarantee: EMD ₹160,118; performance security 5% of total contract value valid through 18 months.
  • Other: Special ATC clauses on quantity variation up to 25%; LD per GeM.

Terms, Conditions & Eligibility

  • EMD: ₹160,118 (DD/online as per ATC).
  • Performance security: 5% of total contract value, valid for 18 months (delivery period + defect liability + claim period).
  • Delivery/LD: Delivery as per GeM terms with LD penalties if delayed.
  • Documentation: Warranty certificates, test certificates, storage cum erection all risk policy, and workmen compensation policy to be submitted with material.
  • IP Address policy: Offers from same IP address excluded.
  • Eligibility: Adhere to GeM GT&C and ATC; BOM compliance required; OEM authorizations and GST/PAN as applicable.

Key Specifications

  • ABB AC500 PM5630-2ETH redundant CPU & IO Bus modules with accessories as per BOM Annexure-I

  • OLTC LCP installation, testing and commissioning at PFBR site

  • ABB PLC cum HMI application software license with dongle per Annexure-III

  • DF LCPs supply and safe delivery per Annexure-II; spares per Annexure-IV

  • EMD ₹160,118; performance security 5% for 18 months

  • Warranty certificate and test certificates to accompany material

  • Storage cum erection all risk policy; Workmen compensation policy

Terms & Conditions

  • EMD amount and mode of submission specified

  • Performance security 5% of total value; validity 18 months

  • Delivery terms per GeM with 25% quantity variation allowed

  • Warranty, test certificates, and insurance policies required with material

  • Exclusion of offers from same IP address

Important Clauses

Payment Terms

EMD ₹160,118; payment terms as per GeM GT&C and ATC; advance/progress payments not specified in data

Delivery Schedule

Delivery period linked to original delivery order; option to increase up to 25%; extended delivery calculations apply

Penalties/Liquidated Damages

LD applicable as per GeM terms; penalties for delays in delivery or performance as per ATC

Bidder Eligibility

  • Proven experience in supply and installation of ABB AC500 LCP/OLTC systems

  • Financial capacity to support 5% performance security and EMD

  • Authorized OEM for ABB PM5630-2ETH hardware and PLC/HMI licenses

  • Compliance with GeM GT&C, ATC, and insurance requirements

Tender Data

Bid Details

Quantity

7

Category

Supply and safe delivery of ABB AC500 PM5630 2ETH redundant

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

Yes (Arbitration clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Supply and safe delivery of ABB AC500 PM5630 2ETH redundant , Installation, testing and commissioning of OLTC LCP , Supply and safe delivery of mandatory and commissioning spares , Installation, testing and commissioning of DF LCPs , Supply and safe delivery of ABB PLC cum HMI application software license

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

18

Payment Timelines

Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

112

Delivery Locations

1

Delivery Cities

Chengalpattu

Delivery Pincodes

603102

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Viswanathan K603102,BHAVINI PFBR PLANT SITE KALPAKKAMChengalpattuTamil Nadu6031021112-

Authority Records

DEPARTMENT OF ATOMIC ENERGY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9820230.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Pfbr Kalpakkam

Ministry

PMO

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 6 Items Sign in for GEM prices

#1

Supply and safe delivery of ABB AC500 PM5630 2ETH redundant

Supply and safe delivery of ABB AC500 PM5630 2ETH redundant

1 set Delivery: 112 days
#2

Installation, testing and commissioning of OLTC LCP

Installation, testing and commissioning of OLTC LCP

1 ls Delivery: 112 days
#3

Supply and safe delivery of mandatory and commissioning spares

Supply and safe delivery of mandatory and commissioning spares

1 set Delivery: 112 days
#4

Supply and safe delivery of ABB AC500 PM5630 2ETH redundant

Supply and safe delivery of ABB AC500 PM5630 2ETH redundant

2 set Delivery: 112 days
#5

Installation, testing and commissioning of DF LCPs

Installation, testing and commissioning of DF LCPs

1 ls Delivery: 112 days
#6

Supply and safe delivery of ABB PLC cum HMI application software license

Supply and safe delivery of ABB PLC cum HMI application software license

1 piece Delivery: 112 days

Categories 11

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar ABB LCP/PLC installations

4

Financial statements and bank guarantee capacity

5

EMD payment receipt or online transfer proof

6

Technical bid documents and BOM compliance

7

OEM authorization letters for ABB products

8

Warranty certificates and test certificates

9

Storage cum erection all risk policy and Workmen Compensation policy

Frequently Asked Questions

Key insights about TAMIL NADU tender market

What documents are required for ABB AC500 tender in Tamil Nadu 2026?

Bidders must submit GST, PAN, experience certificates, financial statements, EMD ₹160,118, warranty certificates, test certificates, OEM authorizations, storage cum erection policy, and workmen compensation policy, along with BOM-compliant technical bids.

How to bid for ABB AC500 LCP supply at PFBR site in Tamil Nadu?

Prepare EMD ₹160,118, obtain OEM ABB authorization, ensure BOM Annexures I-IV compliance, carry warranty and test certificates, provide performance security of 5% for 18 months, and submit per GeM GT&C and ATC guidelines.

What are the delivery terms for 25% quantity variation in GeM tender?

The purchaser may increase quantity up to 25% during contract and extend delivery time using a calculation: (increased/ original) × original period, minimum 30 days; original period governs if shorter.

What standards or certificates are required for ABB PLC license bidding?

Submit PLC/HMI software license with dongle per Annexure-III, ensure BOM conformity, provide warranty and test certificates, and provide storage cum erection and Workmen Compensation policies as proof of compliance.

When is the EMD due for the Tamil Nadu ABB tender 2026?

EMD amount is ₹160,118, payable as specified in ATC. Ensure online or demand draft transfer with the bid submission; confirm payment mode per GeM terms.

What is the scope of supply for OLTC LCP in this tender?

Scope includes supply and safe delivery of ABB AC500 PM5630-2ETH redundant CPU & IO Bus modules with accessories per Annexure-I, plus installation, testing and commissioning at PFBR site.

What warranty and risk coverage are required with material?

Warranty certificate must accompany material; test certificates are required; storage cum erection all risk policy and Workmen Compensation policy must be provided per ATC.

What is the role of BOM Annexures in this procurement?

BOM Annexure-I to IV define hardware, spares, and software requirements; bids must align with these; deviations may be rejected; ensure exact kit and licensing per Annexures.