Customized AMC/CMC for Pre-owned Products - Providing Installing And Testing Off grid Solar Panel
Sangli District Panchayats
SANGLI, MAHARASHTRA
Bid Publish Date
20-Feb-2026, 12:33 pm
Bid End Date
02-Mar-2026, 1:00 pm
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
Sangli District Panchayats in Sangli, Maharashtra (415301) invites bids for a Customized AMC/CMC package covering the Supply, Installation, Testing and Commissioning of a 2 kW Off-Grid Solar Power System with Battery Backup and 1 Year Comprehensive Maintenance. This single-project scope targets pre-owned equipment in a government setting, with no BOQ items published. The tender emphasizes maintenance service post-installation and the ability to scale through the buyer’s quantity/duration adjustment clause up to 25%. The opportunity resides within the Department of Panchayati Raj, reflecting rural electrification support needs in the region.
2 kW Off-Grid Solar Power System with Battery Backup
1 Year Comprehensive Maintenance Service
Supply, Installation, Testing and Commissioning
Location: Sangli, Maharashtra
No published BOQ items; SINGLE-package scope
Quantity/duration may be adjusted up to 25% at contract issue or during execution
EMD amount is not disclosed in tender data; confirm exact amount
1 year comprehensive maintenance included with the solar system
Standards/certifications not specified; bidders must verify site-specific compliance
Delivery timeline and payment terms are to be defined in final contract
OEM authorization may be required for pre-owned equipment
Payment terms are not detailed; bidders should obtain final terms in RFP and ensure alignment with milestones and acceptance.
Delivery and installation timelines to be confirmed; bidders to propose project plan with site acceptance criteria.
No LD details published; verify in final contract and ensure alignment with schedule risk provisions.
Experience in supply and installation of off-grid solar systems with battery backup
Financial stability evidenced by 2-3 years of audited statements
Compliance with local procurement rules for Maharashtra government projects
Main Document
SCOPE_OF_WORK
PAYMENT
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Sangli District Panchayats
SANGLI, MAHARASHTRA
Sangli District Panchayats
SANGLI, MAHARASHTRA
Sangli District Panchayats
SANGLI, MAHARASHTRA
Bhabha Atomic Research Centre
MUMBAI, MAHARASHTRA
Ratnagiri District Panchayats
RATNAGIRI, MAHARASHTRA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent account number (PAN) card
Experience certificates for similar off-grid solar installations
Financial statements (last 2–3 years)
EMD submission document (if required by issuing authority)
Technical bid documents outlining system specs and integration plan
OEM/Manufacturer authorization letter for pre-owned solar equipment (if applicable)
Key insights about MAHARASHTRA tender market
Bidders must submit GST, PAN, experience certificates, financials, and EMD documents as per terms. The tender covers supply, installation, testing, commissioning of a 2 kW off-grid solar system with battery backup and 1 year maintenance. Confirm OEM authorization for pre-owned equipment and adhere to 25% quantity/duration adjustment option.
Required documents include GST registration, PAN, company profile and experience certificates on similar projects, financial statements for last 2-3 years, EMD proof, technical compliance plan, and OEM authorization for pre-owned equipment if applicable. Ensure submission in the specified format to avoid disqualification.
The tender specifies a 2 kW off-grid solar power system with battery backup and 1 year maintenance. No IS standards or brand requirements are published; bidders should confirm compatibility with existing infrastructure and confirm battery type, voltage, and charging controller specifications during bid.
Delivery schedule is not published; bidders must propose a detailed project plan with milestones, site access, installation sequencing, and acceptance criteria. Coordinate with Sangli District Panchayats to confirm expected completion within contractual windows.
Payment terms are not specified in the published data; bidders should seek clarity to define milestones, possible advance, interim payments, and final settlement after site acceptance, ensuring alignment with supply and commissioning activities.
Yes, OEM authorization is advisable for pre-owned equipment to validate compatibility and warranty coverage. Include the authorization letter in the technical bid and ensure the supplier can provide after-sales support for the 1-year maintenance period.
The 1-year comprehensive maintenance covers preventive and corrective maintenance for the installed 2 kW system, battery backup, and associated peripherals. Define service response times, on-site visit limits, spare parts availability, and maximum downtime in the maintenance agreement.
Yes, the buyer can adjust contract quantity or duration up to 25% at issuing or post-award, and bidders must accept revised scope. Prepare flexible pricing and schedule plans to accommodate potential changes without compromising delivery quality.
Sign up now to access all documents
Main Document
SCOPE_OF_WORK
PAYMENT
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS