Progress
Hindustan Copper Limited, Jhunjhunu, Rajasthan invites bids for an ABT meter 3 phase 4 wire APEX100 type. The scope includes Supply, Installation, Testing and Commissioning (SITC) of the metering equipment. The bid allows quantity variation up to 25% during contract execution, with extended delivery time calculated as (increased quantity ÷ original quantity) × original delivery period, minimum 30 days. GST obligations are bidder’s responsibility, with reimbursement as actuals or as per applicable rates, whichever is lower. This tender emphasizes end-to-end SITC and adherence to terms specified in the ATC document. The project location is 331025, Jhunjhunu, Rajasthan, and the procurement focuses on reliable, standards-aligned ABT metering equipment.
Product/service: ABT meter 3 phase 4 wire APEX100 type
Quantity flexibility: ±25% variation during contract
Delivery: baseline as per original delivery order; extended delivery time formula
Scope: Supply, Installation, Testing & Commissioning (SITC)
GST: bidder responsible; reimbursement options per actuals or applicable rates
ATC: ATC document uploaded by buyer
Quantity variation allowed up to 25% with contracted rates unchanged
SITC scope: supply, installation, testing, commissioning of ABT meters
GST responsibility on bidder; reimbursement as actuals or lower applicable rate
GST to be borne by bidder; reimbursement rules as per actuals or lower applicable rate; no explicit EMD payment terms stated in data
Delivery period linked to original order; option clause allows up to 25% quantity variation with time extension calculated as (increased quantity ÷ original quantity) × original delivery period, minimum 30 days
Not specified in provided data; ATC may contain penalties; bidders should review ATC for LD terms
Experience in supplying ABT meters or similar electrical metering equipment
Demonstrated ability to perform SITC (Supply, Installation, Testing, Commissioning)
Financial capacity to handle contract value with GST compliance
Quantity
1
Bid Type
Single Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
3 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
ABT meter 3 phase 4 wire APEX100 type
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
90
Delivery Locations
1
Delivery Cities
Jhunjhunu
Delivery Pincodes
333504
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| RANJAN PRADHAN | 333504,Khetri Copper Complex, Khetrinagar, Dist- Jhunjhunu, Rajasthan-333504 | Jhunjhunu | Rajasthan | 333504 | 1 | 90 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar ABT meter supplies
Financial statements for last 2 fiscal years
EMD/Security deposit documents (as applicable by buyer ATC)
Technical bid documents and product specifications
OEM authorization or authorization letter (if applicable)
Key insights about RAJASTHAN tender market
Bidders must submit GST registration, PAN, experience certificates, financial statements, EMD documents as applicable, and technical bid with ABT meter specifications. Ensure SITC capability and compliance with ATC; verify quantity variation clause up to 25% and GST reimbursement terms. Review original and extended delivery periods per ATC.
Required documents include GST certificate, PAN card, last 2 years financial statements, experience certificates for ABT meters or similar, EMD security, technical bid detailing APEX100 type, and OEM authorizations if applicable. Prepare SITC deployment plan and delivery schedule as per ATC.
Delivery terms specify baseline delivery from original order with option to increase quantity by up to 25% at contracted rates. Extended delivery time is calculated as (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days; delivery period starts after the original delivery date.
Tender data mentions ABT meter 3 phase 4 wire APEX100 type; however, specific standards are not listed. Bidders should present technical compliance with APEX100 family expectations and OEM guidelines; verify ATC for any required certifications or ISI/IS/IEC standards in the final tender documents.
Bidders are responsible for GST calculations; reimbursement will be provided at actuals or the applicable rate, whichever is lower, subject to the quoted GST percentage. Ensure GSTIN validity and rate alignment with current tax rules in the final bid.
Scope covers Supply, Installation, Testing and Commissioning of ABT meters (APEX100 type). Include all associated wiring, mounting, calibration, verification tests, and commissioning at site; include installation support and documentation as per ATC guidance.
No BOQ items are listed in the provided data. Bidders should rely on ATC and supplier specifications to propose unit quantities, while preparing for potential 25% quantity variation under the option clause.
Eligibility includes proven experience in ABT metering or similar electrical equipment projects, the ability to perform SITC, valid GST and PAN documentation, financial stability, and compliance with ATC terms. Prepare OEM authorizations if required.