Progress
Gujarat State Electricity Corporation Limited (GSECL), Vadodara, under the Energy and Petro Chemicals Department, issues a repair, maintenance, and installation rate contract for complete servicing, overhauling, fault attending, repairing, and checking of various hoists and cranes associated with 500 MW Unit 6 Ukai TPS. The procurement includes a Rate Contract WT 5264 G with an EMD of ₹33,233. The scope focuses on onsite servicing and reactive maintenance for critical plant equipment, leveraging an ATC-driven framework that governs turnover, past experience, and price alignment. No BOQ items are listed, signaling a broad service envelope and bid price as the primary commercial input. The tender emphasizes adherence to ATC clauses and GeM terms when conflicts arise, and requires bidders to align with stated minimum average turnover and experience guidelines. This opportunity targets specialized civil/industrial service providers capable of crane and hoist maintenance in a high-capacity power generation setting, within Gujarat.
Product/Service: On-site repair, maintenance, and installation support for hoists and cranes at Ukai Thermal Power Station
Estimated value: Not disclosed; EMD ₹33,233 indicates moderate scope for specialized service
Standards/Certifications: Not specified in tender data; comply with ATC requirements
Warranty/Support: Not specified; refer to ATC for post-service support terms
Delivery/Service window: On-site servicing as per unit maintenance schedule; exact timelines defined by ATC
Quality/Testing: Not detailed; rely on ATC compliance and service performance metrics
OEM/Brand: Not specified; no explicit brand restrictions in tender data
EMD ₹33,233 must accompany bid as bid security
ATC governs turnover and experience; overrides GeM terms if conflict
Rate Contract WT 5264 G applies to hoists/cranes servicing at Ukai TPS
Payment terms to be defined in ATC; bid alignment with ATC is mandatory
On-site service schedule governed by Ukai Unit maintenance windows and ATC requirements
Penalties, if any, to be specified in ATC; standard L.D. norms may apply for delays
Must meet ATC minimum average annual turnover as defined in ATC
Must demonstrate years of past experience in hoist/crane maintenance
Must provide EMD ₹33,233 and comply with GeM/ATC terms
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Tech Clarification Time
4 Days
EMD Required
Yes
MSE Purchase Preference
Yes
MSE Preference Band
L1+20%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
4
Arbitration Clause
Yes (Arbitration clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts
Mediation Clause
No
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
No
Item Category
Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WT 5264 G Rate Contract for works of complete servicing overhauling attending fault repairing checking of various types of Hoists and Cranes of 500 MW Unit 6 Ukai TPS..
Advisory Bank
Bank Of Baroda
ePBG Percentage
5%
ePBG Duration (Months)
20
Delivery Locations
1
Delivery Cities
Tapi
Delivery Pincodes
394680
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Chaudhary Sandeep Navin | 394680,GSECL UKAI TPS, UKAI DAM, DIST: TAPI | Tapi | Gujarat | 394680 | Project / Lumpsum Based | - | Estimated Cost of Spare/Consumable s/Items on Reimbursement basis in Rs (please input 0 if not applicable) : 0 |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar hoist/crane maintenance projects
Financial statements demonstrating average annual turnover per ATC
EMD payment proof (₹33,233)
Technical bid/compliance documents
OEM authorizations or service capability certificates (if required by ATC)
ANY other documents specified in the ATC file
Key insights about GUJARAT tender market
Bidders must submit the EMD of ₹33,233, provide GST and PAN, attach experience certificates for similar crane maintenance, demonstrate adequate turnover as per ATC, and comply with the specific ATC terms; ensure quote aligns with WT 5264 G rate contract guidance and on-site service capability at Ukai TPS.
Required documents include GST registration, PAN, experience certificates for hoist/crane service, financial statements showing turnover, EMD receipt, technical compliance documents, and OEM authorizations if mandated by the ATC; ensure all documents match bidder profile and unit location in Vadodara.
Eligibility hinges on ATC-specified years of past experience in hoist/crane maintenance and minimum average annual turnover; bidders must meet these thresholds, provide relevant project experience, and comply with the ATC terms that prevail over GeM terms in case of conflict.
EMD is ₹33,233; it acts as bid security to protect against non-performance or withdrawal. Submitting the EMD demonstrates bidder seriousness and willingness to comply with contract terms; failure to secure may render bid invalid.
Delivery is on-site servicing at Ukai Thermal Power Station Unit 6; work window depends on plant schedule and ATC guidelines; bidders must coordinate with plant maintenance teams and meet turnaround times as per ATC terms.
ATC defines turnover and years of experience, potentially price preference; in case of conflict, ATC terms prevail over GeM. Bidders must align with ATC for eligibility, quoting strategy, and post-award conditions.
The tender requires compliance with ATC-specified standards; explicit IS or BIS certifications are not listed in the data; ensure alignment with project maintenance norms and OEM service capabilities as guided by ATC.
In any conflict between ATC and GeM terms, ATC terms prevail; bidders must follow the ATC document attached to this tender and quote accordingly, ensuring compliance with all stated turnover and experience prerequisites.