TenderDekho Logo
Active GEM

Procurement Opportunity: Angle Cock SS,Bib Cock Short body SS,Pillar Cock SS,Bib Cock long body SS,Bib Cock Push Tap SS,CPVC in ANUPPUR, MADHYA PRADESH

Bid Publish Date

13-Oct-2026, 4:07 pm

Bid End Date

03-Nov-2026, 5:00 pm

EMD

₹20,000

Value

₹10,00,000

Progress

Issue13-Oct-2026, 4:07 pm
AwardPending

A tender has been published for Igntu Amarkantak Angle Cock SS, Bib Cock Short body SS, Pillar Cock SS, Bib Cock long body SS, Bib Cock Push Tap SS, CPVC in ANUPPUR, MADHYA PRADESH. Quantity: 8400 by. Submission Deadline: 03-11-2026 17: 00: 00. Check eligibility and apply.

Advertisement

Tender Data

Bid Details

Quantity

8400

Category

CPVC Pipe

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

5

Past Performance

40 %

Experience Required

1 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

6

Delivery Details

Max Delivery Days

21

Delivery Locations

1

Delivery Cities

Anuppur

Delivery Pincodes

484886

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Virendra Kumar Pandey484886,Indira Gandhi National Tribal University, Village LalpurAnuppurMadhya Pradesh4848866021-

Authority Records

MINISTRY OF EDUCATIONHIGHER EDUCATION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9965146.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Igntu Amarkantak

Office Name

Amarkantak

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 169 Items Sign in for GEM prices

#1

Angle Cock SS

Angle Cock SS

60 each Delivery: 21 days
#2

Bib Cock Short body SS

Bib Cock Short body SS

40 each Delivery: 21 days
#3

Pillar Cock SS

Pillar Cock SS

20 each Delivery: 21 days
#4

Bib Cock long body SS

Bib Cock long body SS

60 each Delivery: 21 days
#5

Bib Cock Push Tap SS

Bib Cock Push Tap SS

50 each Delivery: 21 days
#6

CPVC Pipe

CPVC Pipe 3/4 feet (10 feet)

15 each Delivery: 21 days
#7

CPVC Pipe

CPVC Pipe 1 feet

15 each Delivery: 21 days
#8

CPVC Pipe

CPVC Pipe 1 1/4 feet

10 each Delivery: 21 days
#9

CPVC Pipe

CPVC Pipe 1 1/2 feet

15 each Delivery: 21 days
#10

CPVC Pipe 2 feet

CPVC Pipe 2 feet

10 each Delivery: 21 days
#11

CPVC Socket

CPVC Socket 3/4 feet

25 each Delivery: 21 days
#12

CPVC Socket

CPVC Socket 1 feet

25 each Delivery: 21 days
#13

CPVC Socket

CPVC Socket 1 1/4 feet

20 each Delivery: 21 days
#14

CPVC Socket

CPVC Socket 1 1/2 feet

20 each Delivery: 21 days
#15

CPVC Socket

CPVC Socket 2 feet

10 each Delivery: 21 days
#16

CPVC Elbow

CPVC Elbow 3/4 feet

20 each Delivery: 21 days
#17

CPVC Elbow

CPVC Elbow 1 feet

20 each Delivery: 21 days
#18

CPVC Elbow

CPVC Elbow 1 1/4 feet

20 each Delivery: 21 days
#19

CPVC Elbow

CPVC Elbow 1 1/2 feet

20 each Delivery: 21 days
#20

CPVC Elbow

CPVC Elbow 2 feet

5 each Delivery: 21 days
#21

CPVC Tee

CPVC Tee 3/4 feet

20 each Delivery: 21 days
#22

CPVC Tee

CPVC Tee 1 feet

20 each Delivery: 21 days
#23

CPVC Tee

CPVC Tee 1 1/4 feet

20 each Delivery: 21 days
#24

CPVC Tee

CPVC Tee 1 1/2 feet

20 each Delivery: 21 days
#25

CPVC Tee

CPVC Tee 2 feet

5 each Delivery: 21 days
#26

CPVC End Cap

CPVC End Cap 1 feet

20 each Delivery: 21 days
#27

CPVC End Cap

CPVC End Cap 1 1/4 feet

20 each Delivery: 21 days
#28

CPVC End

CPVC End 3/4

50 each Delivery: 21 days
#29

CPVC Brass MTA

CPVC Brass MTA 1 feet

10 each Delivery: 21 days
#30

CPVC Brass MTA

CPVC Brass MTA 1 1/4 feet

10 each Delivery: 21 days
#31

CPVC Brass MTA

CPVC Brass MTA 1 1/2 feet

10 each Delivery: 21 days
#32

CPVC Brass MTA 2 feet

CPVC Brass MTA 2 feet

8 each Delivery: 21 days
#33

CPVC Brass FTA 1 feet

CPVC Brass FTA 1 feet

10 each Delivery: 21 days
#34

CPVC Brass FTA

CPVC Brass FTA 1 1/4 feet

10 each Delivery: 21 days
#35

CPVC Brass FTA

CPVC Brass FTA 1 1/2 feet

10 each Delivery: 21 days
#36

CPVC Brass FTA 2 feet

CPVC Brass FTA 2 feet

10 each Delivery: 21 days
#37

CPVC Union 1 feet

CPVC Union 1 feet

10 each Delivery: 21 days
#38

CPVC Union

CPVC Union 1 1/4 feet

10 each Delivery: 21 days
#39

CPVC Union

CPVC Union 1 1/2 feet

10 each Delivery: 21 days
#40

CPVC Union 2 feet

CPVC Union 2 feet

10 each Delivery: 21 days
#41

CPVC Bush 1 feet

CPVC Bush 1 feet

20 each Delivery: 21 days
#42

CPVC Bush

CPVC Bush 1 1/4 feet

20 each Delivery: 21 days
#43

CPVC Bush

CPVC Bush 1 1/2 feet

20 each Delivery: 21 days
#44

CPVC Bush 2 feet

CPVC Bush 2 feet

10 each Delivery: 21 days
#45

CPVC Gate Valve 1 feet

CPVC Gate Valve 1 feet

5 each Delivery: 21 days
#46

CPVC Gate Valve

CPVC Gate Valve 1 1/4 feet

5 each Delivery: 21 days
#47

CPVC Gate Valve

CPVC Gate Valve 1 1/2 feet

5 each Delivery: 21 days
#48

CPVC Gate Valve 2 feet

CPVC Gate Valve 2 feet

5 each Delivery: 21 days
#49

PVC Connection Pipe

PVC Connection Pipe1.5 feet Heavy Duty for hot water

100 each Delivery: 21 days
#50

PVC Connection Pipe 3 feet for cold water

PVC Connection Pipe 3 feet for cold water

80 each Delivery: 21 days
#51

Teflon Tape Roll

Teflon Tape (Roll)

300 each Delivery: 21 days
#52

Spendle Half Round

Spendle Half Round

30 each Delivery: 21 days
#53

Spendle Full Round

Spendle Full Round

30 each Delivery: 21 days
#54

M Seal

M Seal

2 kg Delivery: 21 days
#55

PVC Pipe 4 inch

PVC Pipe 4 inch (10 Feet)

20 each Delivery: 21 days
#56

PVC Elbow 4 feet

PVC Elbow 4 feet

10 each Delivery: 21 days
#57

PVC Socket 4 feet

PVC Socket 4 feet

10 each Delivery: 21 days
#58

Silicon Sealant 300Ml

Silicon Sealant 300Ml

10 each Delivery: 21 days
#59

G.I. Gate Valve 1 feet Heavy Duty

G.I. Gate Valve 1 feet Heavy Duty

5 each Delivery: 21 days
#60

G.I. Gate Valve Heavy Duty

G.I. Gate Valve 1 1/4 feet Heavy Duty

5 each Delivery: 21 days
#61

G.I. Gate Valve

G.I. Gate Valve 1 1/2 feet Heavy Duty

5 each Delivery: 21 days
#62

G.I. Nipple 4 feet size

G.I. Nipple 4 feet size 1 1/4 feet

5 each Delivery: 21 days
#63

Float valve for Water Tank 1 feet feet

Float valve for Water Tank 1 feet feet

10 each Delivery: 21 days
#64

Float valve for Cistern

Float valve for Cistern

24 each Delivery: 21 days
#65

Football for secetion pipe

Football for secetion pipe 2 1/2 feet

2 each Delivery: 21 days
#66

Waste Pipe

Waste Pipe

200 each Delivery: 21 days
#67

CPVC Solvent 250 ML

CPVC Solvent ( 250 ML)

10 each Delivery: 21 days
#68

Gaskit 100ML

Gaskit 100ML

5 each Delivery: 21 days
#69

Sintex Tank Cap 5000 Ltr

Sintex Tank Cap 5000 Ltr

10 each Delivery: 21 days
#70

M.S Reducer 3 inch x 2 inch

M.S Reducer 3 inch x 2 inch

1 each Delivery: 21 days
#71

M.S Gate Valve 2 inch

M.S Gate Valve 2 inch

1 each Delivery: 21 days
#72

M.S Gate Valve 3 inch

M.S Gate Valve 3 inch

1 each Delivery: 21 days
#73

M.S Union 2 inch

M.S Union 2 inch

2 each Delivery: 21 days
#74

M.S Union

M.S Union 2 1/2 inch

1 each Delivery: 21 days
#75

Dhaga for gaskit

Dhaga for gaskit

2 pkt Delivery: 21 days
#76

End cap for tap

End cap for tap

100 each Delivery: 21 days
#77

Sintex Tank Cap 3000 Ltr

Sintex Tank Cap 3000 Ltr

30 each Delivery: 21 days
#78

Hose Nipple SS 1 inch for submersible water pump

Hose Nipple SS 1 inch for submersible water pump

5 each Delivery: 21 days
#79

Hose Nipple SS 1

Hose Nipple SS 1 1/4 inch for submersible water pump

5 each Delivery: 21 days
#80

Hose Nipple SS

Hose Nipple SS 1 1/2 inch for submersible water pump

5 each Delivery: 21 days
#81

Hose Nipple SS 2 inch for submersible water pump

Hose Nipple SS 2 inch for submersible water pump

5 each Delivery: 21 days
#82

13 no Nut Bolt

13 no Nut Bolt

50 kg Delivery: 21 days
#83

HDPE Roll Pipe 1 inch for Submersible pump

HDPE Roll Pipe 1 inch for Submersible pump

300 feet Delivery: 21 days
#84

HDPE Roll Pipe

HDPE Roll Pipe 1 1/4 inch for Submersible pump

300 feet Delivery: 21 days
#85

HDPE Roll Pipe 1 1by2 inch for Submersible Pump

HDPE Roll Pipe 1 1/2 inch for Submersible Pump

300 feet Delivery: 21 days
#86

HDPE Roll Pipe 2 inch for Submersible Pump

HDPE Roll Pipe 2 inch for Submersible Pump

200 feet Delivery: 21 days
#87

Silver Supreme Chrome Healthfaucet With 1 M Ss Hose Pipe And Abs Hook Set Of 1 Health Faucet

Silver Supreme Chrome Healthfaucet With 1 M Ss Hose Pipe And Abs Hook Set Of 1 Health Faucet

15 each Delivery: 21 days
#88

Sink Stranierby coupling with opening 4 inch

Sink Stranier/ coupling with opening 4 inch

30 each Delivery: 21 days
#89

Basin SS thread waste coupling

Basin SS thread waste coupling

30 each Delivery: 21 days
#90

SS Floor Drain CoverbyJaliby grating Hole With Hole

SS Floor Drain Cover/Jali/ grating Hole With Hole

100 each Delivery: 21 days
#91

SS Floor Drain CoverbyJaliby grating Hole

SS Floor Drain Cover/Jali/ grating Hole

100 each Delivery: 21 days
#92

Extension Nipple SS 1 inch

Extension Nipple SS 1 inch

50 each Delivery: 21 days
#93

Extension Nipple SS 2 inch

Extension Nipple SS 2 inch

50 each Delivery: 21 days
#94

Toilet Cistern

Toilet Cistern

10 each Delivery: 21 days
#95

GI Nipple 1by2 inch

GI Nipple 1/2 inch

10 each Delivery: 21 days
#96

GI Nipple 1 inch

GI Nipple 1 inch

10 each Delivery: 21 days
#97

GI Nipple 1 1by4 inch

GI Nipple 1 1/4 inch

10 each Delivery: 21 days
#98

Rawal Grip 35 mm 100 Nos

Rawal Grip 35 mm (100 Nos)

30 pkt Delivery: 21 days
#99

Black Screw 25 mm

Black Screw 25 mm

20 pkt Delivery: 21 days
#100

Black Screw 50 mm

Black Screw 50 mm

20 pkt Delivery: 21 days
#101

Black Screw 35 mm

Black Screw 35 mm

20 pkt Delivery: 21 days
#102

Hexa Blade Single Side and Double side

Hexa Blade Single Side & Double side

100 each Delivery: 21 days
#103

Bosch Drill Bit 6mm

Bosch Drill Bit 6mm

10 each Delivery: 21 days
#104

Iron cutter blade 4 inch Bosch

Iron cutter blade 4 inch Bosch

50 each Delivery: 21 days
#105

G.I. Wire Binding Wire

G.I. Wire (Binding Wire)

5 kg Delivery: 21 days
#106

Support Nylon Rassa 8mm

Support Nylon Rassa (8mm)

16 kg Delivery: 21 days
#107

Paint Brush 2 feet

Paint Brush 2 feet

5 each Delivery: 21 days
#108

Paint Brush 4 feet

Paint Brush 4 feet

5 each Delivery: 21 days
#109

Roller Cloth 1 fit Size

Roller (Cloth) 1 fit Size

5 each Delivery: 21 days
#110

False ceiling

False ceiling ( Gypsum Board) channel Main Ceiling Channel (Primary/C-Channel)/ Cross / Furring Channel (Secondary/Hat Channel)/Perimeter Channel (Wall Angle / L-Channel)

200 feet Delivery: 21 days
#111

False ceiling channel

False ceiling channel (for 2x2 False ceiling Main Ceiling Channel (Primary/C-Channel)/ Cross / Furring Channel (Secondary/Hat Channel)/Perimeter Channel (Wall Angle / L-Channel)

200 feet Delivery: 21 days
#112

False Ceiling 2x 2

False Ceiling 2x 2

20 pkt Delivery: 21 days
#113

Screw Driver Big Size 2 in 1 Taparia

Screw Driver Big Size 2 in 1 Taparia

2 each Delivery: 21 days
#114

Plier 8 No. Taparia

Plier 8 No. Taparia

2 each Delivery: 21 days
#115

Nail 1 Inchi

Nail 1 Inchi

3 kg Delivery: 21 days
#116

Nail 2 Inchi

Nail 2 Inchi

3 kg Delivery: 21 days
#117

Nail 2 1by2 Inchi

Nail 2 1/2 Inchi

3 kg Delivery: 21 days
#118

Bombay Nail 2 1by2 Inchi

Bombay Nail 2 1/2 Inchi

5 kg Delivery: 21 days
#119

Bombay Nail 4 Inchi

Bombay Nail 4 Inchi

5 kg Delivery: 21 days
#120

Mosquito Jali Height 5 feet

Mosquito Jali Height 5 feet

100 sq feet Delivery: 21 days
#121

5mm Plain Glass

5mm Plain Glass

2,900 sq feet Delivery: 21 days
#122

Glass Putty

Glass Putty

200 kg Delivery: 21 days
#123

Emulsiun Paint Govt Yellow 20ltr Pack Tractor colour code 7898 Asian Paint

Emulsiun Paint Govt Yellow 20ltr Pack Tractor colour code 7898 Asian Paint

5 each Delivery: 21 days
#124

Damp Proof Emulsiun Paint 20 ltr Pack Asian Paint

Damp Proof Emulsiun Paint 20 ltr Pack Asian Paint

1 each Delivery: 21 days
#125

GP2 Grouting 20 Kg Pack Dr. Fixit

GP2 Grouting 20 Kg Pack Dr. Fixit

2 each Delivery: 21 days
#126

Hand Gloves full size

Hand Gloves full size

5 set Delivery: 21 days
#127

Marbal Cutter Blade Bosch

Marbal Cutter Blade Bosch

5 each Delivery: 21 days
#128

Wood Cutter Blade Bosch

Wood Cutter Blade Bosch

10 each Delivery: 21 days
#129

Ultratech PPC Cement 50 kg

Ultratech PPC Cement (50 kg)

5 bag Delivery: 21 days
#130

White Cement 50 Kg

White Cement (50 Kg)

2 bag Delivery: 21 days
#131

Wall Putty 50 Kg

Wall Putty (50 Kg)

2 bag Delivery: 21 days
#132

Putti Plate 4 inch

Putti Plate 4 inch

30 each Delivery: 21 days
#133

Tower Bolt 8 feet

Tower Bolt 8 feet

50 each Delivery: 21 days
#134

Tower Bolt 10 feet

Tower Bolt 10 feet

50 each Delivery: 21 days
#135

Door Kabjja

Door Kabjja

24 each Delivery: 21 days
#136

Door Stopper

Door Stopper

24 each Delivery: 21 days
#137

Sand paper 1 feet

Sand paper ( 1 feet )

50 each Delivery: 21 days
#138

Oil Paint Golden Brown Asian Paint

Oil Paint Golden Brown Asian Paint

5 ltr Delivery: 21 days
#139

Oil Paint Yellow Asian Paint

Oil Paint Yellow Asian Paint

5 ltr Delivery: 21 days
#140

Oil Paint Black Asian Paint

Oil Paint Black Asian Paint

5 ltr Delivery: 21 days
#141

Thinner

Thinner

10 ltr Delivery: 21 days
#142

Self Screw for tin shed 1 1by2 inch

Self Screw for tin shed 1 1/2 inch

100 each Delivery: 21 days
#143

L- Drop Aluminium 10 inch

L- Drop Aluminium 10 inch

50 each Delivery: 21 days
#144

Lock Normal 50 mm

Lock Normal ( 50 mm)

20 each Delivery: 21 days
#145

Kundi For Box Small

Kundi (For Box) Small

50 each Delivery: 21 days
#146

Key Chain with name tag

Key Chain with name tag

100 each Delivery: 21 days
#147

Welding Rod 10 No.

Welding Rod 10 No.

10 pkt Delivery: 21 days
#148

Grinder machine Bosch

Grinder machine Bosch

1 each Delivery: 21 days
#149

Marble cutter machine Bosch

Marble cutter machine Bosch

1 each Delivery: 21 days
#150

Glass Cutter Pen Bosch

Glass Cutter Pen Bosch

10 each Delivery: 21 days
#151

False Ceiling Gypsum Board 6 x 4

False Ceiling Gypsum Board 6 x 4

20 each Delivery: 21 days
#152

Profile Sheet 10 x 4 feet

Profile Sheet 10 x 4 feet

10 each Delivery: 21 days
#153

GI Square Pipe 1 x 1

GI Square Pipe 1 x 1

80 kg Delivery: 21 days
#154

Polycarbonate green sheet 2 mm

Polycarbonate green sheet 2 mm

200 sqfeet Delivery: 21 days
#155

Welding Goggle Black

Welding Goggle Black

5 each Delivery: 21 days
#156

PU Sealent

PU Sealent

5 each Delivery: 21 days
#157

Half Thread Screw 25 x 8 100pec

Half Thread Screw 25 x 8 (100pec)

5 pkt Delivery: 21 days
#158

Half Thread Screw 35 x 8

Half Thread Screw 35 x 8

5 pkt Delivery: 21 days
#159

Half Thread Screw 50 x 8

Half Thread Screw 50 x 8

5 pkt Delivery: 21 days
#160

Measuring Tape Steel 3Mtr

Measuring Tape Steel 3Mtr

2 each Delivery: 21 days
#161

1by2 LB Claw Hammer With Rubber Grip

1/2 LB Claw Hammer With Rubber Grip

2 each Delivery: 21 days
#162

Steel Hand Saw

Steel Hand Saw

2 each Delivery: 21 days
#163

Half round Metal File

Half round Metal File

5 each Delivery: 21 days
#164

Trowel Set for Cement Works

Trowel Set for Cement Works

2 each Delivery: 21 days
#165

Carpenter Tools Bag 2 Zipper Pockets Inside 19 inchx13 inchx9 inch Inches

Carpenter Tools Bag (2 Zipper Pockets Inside) 19 inchx13 inchx9 inch Inches

5 each Delivery: 21 days
#166

Pretail Garden SpadebyShovel Fawda with Wooden Handle

Pretail Garden Spade/Shovel (Fawda) with Wooden Handle

5 each Delivery: 21 days
#167

Solid Forged Iron Chiseland Digging Tamping Bar

Solid Forged Iron Chisel Bar, Digging Tamping Bar 5 Feet

2 each Delivery: 21 days
#168

Unbreakable Plastic Tasla 18 Inch 7 L Polypropylene Bucket

Unbreakable Plastic Tasla 18 Inch 7 L Polypropylene Bucket

10 each Delivery: 21 days
#169

N 95 charcoal mask

N 95 charcoal mask

10 each Delivery: 21 days

Categories 123

SPECTROSCOPIC EQUIPMENT PVC PIPE NATURAL FUELS PLASTIC STOOL WIND MILL ENERGY PROJECT PRINTING SERVICES SLUICE VALVE ANGLE INCLINED SHAFT ANIMAL WATERING MACHINES BATHROOM SET FERROUS ELECTRODE MISCELLANEOUS VALVE ROTARY DRILL INTERIOR ANGLE GLOBE VALVES STRUCTURE FABRICATION AIR CYLINDERS RETURN ROLLER TUBE AND FITTING GRATING DESERT COOLER WELDING FLUX WELDING ELECTRODE AGRICULTURAL MACHINERY OFFSET PRINTING AGRICULTURE EQUIPMENT STEEL FURNITURE CHANNEL ARC VALVE CANVASES AND FILMS AND BOARDS LOADER TONGUE WIRE BLADE FAULT ANALYSIS AGRICULTURAL PUMP FALSE CELING ELBOW HYDRAULIC SHOVEL GRINDER CHEQUERRED TILE GI WIRE DEEPWELL PUMPS IRRIGATION PUMPS MILITARY VEHICLE PUMPS SOCKET TILES AND FLAGSTONES DRILL BIT SEALING RING WATER TANK ELECTRIC ROPE SHOVEL BLANKING PLUGS MS WIRE PAPER AND PRINTING SERVICES WATER STORAGE AND SUPPLY SQUARE PIPE FLUID MECHANICS EQUIPMENT WELDING WIRE CEMENT SKILLED MANPOWER BUCKET BIDET UTG ROTATING PISTON PUMPS SKILLED PERSONNEL ARCHERY BOWS GL WIRE TILE FLOORING TRACK CONSTRUCTION VALVES WELDING ROD GATE VALVES SEED AND FEED EQUIPMENT RETURN ROLLER FLAT GROUTING PROVISION OF TILE BOX OIL PUMP VALVE WOODEN HANDLE WIRE FILTER RETAINERS CABLE STAYED FUEL PUMP POLYPROPYLENE ERECTION OF STRUCTURAL CUTTER ARC WELDING MISCELLANEOUS FINISHES SLIDER VALVES WELDING TIP ANGLE COCK TRANSITION METALS BOILER MOUNTING VALVE SOLID AND GEL FUELS AGRICULTURAL EQUIPMENT FABRICATOR WATER TRANSMISSION MACHINE HOSE PIPE PLASTIC SUBMERSIBLE PUMP VALVE PARTS AND ACCESSORIES FLOAT VALVES GYPSUM BOARD WATER COOLED ENGINE FR1 BAG CPVC PIPE BOILER VALVE FIRST AID BOX WATER PUMP MASTIC METAL PRODUCTS BAR POWER TOOLS TEE THINNERS BUSH POLYMERASE CHAIN REACTION PCR PEN MANUFACTURING SERVICES

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

Additional Doc 1 (Requested in ATC)

6

Additional Doc 2 (Requested in ATC)

7

Additional Doc 3 (Requested in ATC)

8

Additional Doc 4 (Requested in ATC)

9

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

10

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement