Fogging Machine (V2) as per IS 14855 (Part 1)
N/a
KANNAUJ, UTTAR PRADESH
Bid Publish Date
14-Nov-2025, 3:28 pm
Bid End Date
28-Nov-2025, 4:00 pm
Bid Opening Date
28-Nov-2025, 4:30 pm
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
Bhakra Beas Management Board seeks to procure a Fogging Machine (V2) aligned with IS 14855 (Part 1) under Q2, with no BOQ items listed. The tender indicates an option to adjust quantity by up to 25% and allows extension of delivery periods at contracted rates. The procurement aims to equip pest control or sanitation programs across BBMB operations. The absence of explicit start/end dates or estimated value necessitates bidders to prepare compliant proposals that address delivery flexibility and adherence to the IS standard. Acknowledging the option clause, bidders should factor possible volume variation and synchronized delivery planning into their logistical schedules.
25% quantity variation allowed at order/within contract at same rate
Delivery period calculated with minimum 30 days extension
Compliance with IS 14855 (Part 1) is mandatory
Delivery starts from the last date of the original delivery order; extended time calculated by (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
Purchaser may increase/decrease quantity by up to 25% at contract placement and during currency at contracted rates
Not specified in data; bidders should seek clarity during bid submission
Experience in supplying fogging equipment or IS-compliant devices
Evidence of financial stability and GST compliance
Ability to meet IS 14855 (Part 1) requirements and delivery Flexibilities
N/a
KANNAUJ, UTTAR PRADESH
N/a
BHOPAL, MADHYA PRADESH
Urban Development And Housing Department
E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh
FATEHPUR, UTTAR PRADESH
E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh
BIJNOR, UTTAR PRADESH
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar fogging equipment supply
Financial statements or solvency proof
EMD documentation (amount not specified in data; submit as per tender terms)
Technical bid documents demonstrating IS 14855 (Part 1) compatibility
OEM authorization or dealership certificate (if applicable)
Key insights about HARYANA tender market
Bidders should submit GST registration, PAN, experience certificates, financial statements, EMD, and technical compliance documents demonstrating IS 14855 (Part 1) compatibility. Prepare OEM authorizations if required, and show ability to absorb 25% quantity variations and delivery flexibility per contract terms.
Required documents include GST certificate, PAN, experience certificates for similar equipment supply, financial statements, EMD documentation, and technical bid showing IS 14855 (Part 1) compliance. OEM authorization may be needed; ensure bid pack includes delivery capability details.
The tender specifies Fogging Machine (V2) aligned to IS 14855 (Part 1) with Q2 quality level. Specific performance metrics are not listed; bidders must demonstrate standard conformity, build quality, safety compliance, and consistent operation per IS guidelines.
Quantity variations up to 25% are allowed at the time of contract placement and during the currency of the contract at contracted rates. The extension calculation uses (Increased quantity ÷ Original quantity) × Original delivery period with a minimum 30 days.
Delivery starts from the last date of the original delivery order. If the option clause is exercised, the additional time is calculated as described above, with a minimum extension of 30 days even for shorter original delivery periods.
Bidders must comply with IS 14855 (Part 1) for Fogging Machines. OEM authorizations or certifications proving conformity to the standard may be required, and bidders should provide evidence of IS compliance in the technical bid section.
Verify eligibility by presenting relevant industry experience in fogging equipment supply, financial stability proofs, and GST/PAN compliance. Ensure the bid package includes complete IS 14855 compliance evidence, delivery capability details, and adherence to the option clause for quantity changes.
The tender specifies Fogging Machine (V2) per IS 14855 (Part 1) with Q2 quality, and a flexible quantity clause of up to 25%. No BOQ items are listed; focus is on standard compliance, supplier capability, and delivery performance under contract terms.
National Institute Of Pharmaceutical Education And Research (niper) Guwahati
📍 KAMRUP, ASSAM
Access all tender documents at no cost
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS