TenderDekho Logo
GEM

Bharat Heavy Electricals Limited NDE BEARING & MOTOR ACCESSORIES Tender 2026 India - NS112M/NS132S Series & ND250MX

Bid Publish Date

27-Mar-2026, 3:10 pm

Bid End Date

06-Apr-2026, 4:00 pm

Progress

Issue27-Mar-2026, 3:10 pm
Technical04-Mar-2026, 4:07 pm
Financial
Award29-Apr-2026, 12:06 am
Explore all 4 tabs to view complete tender details

Quantity

32

Category

NDE BEARING CG6314 ND250MX

Bid Type

Two Packet Bid

Categories 11

Tender Overview

Bharat Heavy Electricals Limited invites bids for the NDE BEARING CG6314 ND250MX, MOTOR COOLING FAN ASSEMBLY NS112M/NS132S/ND160M, and MOTOR TERMINAL BLOCKS ASSEMBLY across multiple ND series. The scope is limited to the supply of goods (no services) with a 16-item BOQ that lists part numbers rather than quantities. Bidders must understand the option clause allowing up to 25% quantity variation at contracted rates, with delivery timelines anchored to the last delivery order date. Invoices must be GST-compliant and raised in the consignee’s name. This tender is hosted on the GeM platform and requires vendor code creation and standard financial disclosures. A nominated inspection agency will oversee material acceptance. The opportunity targets suppliers capable of meeting bulk procurement for BD/NDE bearing and motor components within India. The unique risk element includes price/quantity flexibility and the necessity to align with GeM invoice processes.

Technical Specifications & Requirements

  • Product categories: NDE BEARINGS (CG6314, CG6205, CG6206, CG6305, CG6309 ND160M/ND250MX), MOTOR COOLING FAN ASSY NS112M/NS132S/ND160M, MOTOR TERMINAL BLOCKS ASSEMBLY NS112M/NS132S/ND160M
  • Delivery terms: Scope limited to supply of goods; delivery periods linked to the last date of the original delivery order; option extension uses the (Increased quantity ÷ Original quantity) × Original delivery period formula with a minimum 30 days
  • Inspection: Nominated Inspection Agency (NIA) arranged by buyer; buying agency to specify inspection criteria
  • Invoicing & GST: GST invoice must be uploaded on GeM; payment terms aligned to GST portal confirmations
  • BOQ context: 16 items total; exact quantities not disclosed; emphasis on part-number based procurement
  • Documentation readiness: Vendor code creation required; PAN, GSTIN, cancelled cheque, EFT mandate to be submitted with bid
  • Quality/standards: No explicit standards listed in data; bidders should anticipate standard Indian bearing and motor assembly practices and ensure GST-compliant invoicing

Terms, Conditions & Eligibility

  • EMD/financials: Not disclosed in provided terms; bidders must meet standard GeM/organization financial due-diligence requirements
  • Delivery timeline: Delivery period commences from last delivery order; option extensions use calculated formula with minimum 30 days
  • Payment terms: GST-compliant invoicing via GeM; payment terms integrate with consignee GSTIN; detailed terms not specified
  • Eligibility criteria: Bidder must not be in liquidation or bankruptcy; must upload PAN, GST, cancelled cheque, EFT mandate
  • Contract risk & termination: Buyer may terminate for non-performance, non-delivery, or misrepresentation; rights preserved to price adjustment and contract termination under stated conditions
  • Scope clarity: Scope explicitly states “Only supply of Goods”; INS and warranty terms not detailed in data; bidders should verify post-bid terms with the buyer

Key Specifications

    • Product names: NDE BEARING CG6314 ND250MX, DE BEARING CG6206 NS112M, NDE BEARING CG6205 NS112M, DE BEARING CG6208 NS132S, NDE BEARING CG6305 NS132S, DE BEARING CG6309 ND160M, NDE BEARING CG6209 ND160M; MOTOR COOLING FAN ASSY NS112M/NS132S/ND160M; MOTOR TERMINAL BLOCKS ASSY NS112M/NS132S/ND160M
    • Volumes/quantities: 16 BOQ items listed; exact quantities not disclosed
    • EMD/Value: Not specified in data; tender notes option clause up to 25% quantity variation
    • Experience: No explicit years; bidders must demonstrate capability to supply multiple bearing/fan assemblies
    • Quality/Compliance: No explicit ISI/ISO/IS standards specified in data; expect standard Indian bearing and motor components

Terms & Conditions

  • Option Clause: up to 25% quantity variation at contracted rates

  • GST invoicing required; invoice to be raised in consignee name with consignee GSTIN

  • Delivery terms tied to last delivery order date; minimum 30 days for extended time

  • Vendor code creation and standard submission of PAN, GST, cancelled cheque, EFT mandate

  • Nominated Inspection Agency will conduct material inspection on buyer’s behalf

Important Clauses

Payment Terms

GST-compliant invoicing on GeM; payment terms aligned to GST portal confirmations; invoice to be raised in consignee name with consignee GSTIN

Delivery Schedule

Delivery period begins from last date of original delivery order; option extensions calculated by (increased quantity ÷ original quantity) × original delivery period with minimum 30 days

Penalties/Liquidated Damages

Contract termination rights exist for non-delivery, delay, misrepresentation or bankruptcy; penalties not numerically specified in available data

Bidder Eligibility

  • Not under liquidation, court receivership, or bankruptcy

  • Must have PAN and GST registration with valid documents

  • Must have EFT mandate and cancelled cheque; vendor code creation required

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

NDE BEARING CG6314 ND250MX , MOTOR COOLING FAN ASSY ND250MX , MOTOR TERMINAL BLOCKS ASSY ND250MX , DE BEARING CG 6206 NS112M , NDE BEARING CG 6205 NS112M , MOTOR COOLING FAN ASSY NS112M , MOTOR TERMINAL BLOCKS ASSY NS112M , DE BEARING CG 6208 NS132S , NDE BEARING CG 6305 NS132S , MOTOR COOLING FAN ASSY NS132S , MOTOR TERMINAL BLOCKS ASSY NS132S , DE BEARING CG 6309 ND160M , NDE BEARING CG 6209 ND160M , MOTOR COOLING FAN ASSY ND160M , MOTOR TERMINAL BLOCKS ASSY ND160M , DE BEARING CG 6314 ND250MX

Authority Records

MINISTRY OF HEAVY INDUSTRIESHEAVY INDUSTRY DEPARTMENTBHARAT HEAVY ELECTRICALS LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 10

GeM-Bidding-9147447.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 16 Items Sign in for GEM prices

#1

NDE BEARING CG6314 ND250MX

NDE BEARING CG 6314 ND250MX

2 no Delivery: 60 days
#2

MOTOR COOLING FAN ASSY ND250MX

MOTOR COOLING FAN ASSY ND250MX

2 no Delivery: 60 days
#3

MOTOR TERMINAL BLOCKS ASSY ND250MX

MOTOR TERMINAL BLOCKS ASSY ND250MX

2 set Delivery: 60 days
#4

DE BEARING CG 6206 NS112M

DE BEARING CG 6206 NS112M

2 no Delivery: 60 days
#5

NDE BEARING CG 6205 NS112M

NDE BEARING CG 6205 NS112M

2 no Delivery: 60 days
#6

MOTOR COOLING FAN ASSY NS112M

MOTOR COOLING FAN ASSY NS112M

2 no Delivery: 60 days
#7

MOTOR TERMINAL BLOCKS ASSY NS112M

MOTOR TERMINAL BLOCKS ASSY NS112M

2 set Delivery: 60 days
#8

DE BEARING CG 6208 NS132S

DE BEARING CG 6208 NS132S

2 no Delivery: 60 days
#9

NDE BEARING CG 6305 NS132S

NDE BEARING CG 6305 NS132S

2 no Delivery: 60 days
#10

MOTOR COOLING FAN ASSY NS132S

MOTOR COOLING FAN ASSY NS132S

2 no Delivery: 60 days
#11

MOTOR TERMINAL BLOCKS ASSY NS132S

MOTOR TERMINAL BLOCKS ASSY NS132S

2 set Delivery: 60 days
#12

DE BEARING CG 6309 ND160M

DE BEARING CG 6309 ND160M

2 no Delivery: 60 days
#13

NDE BEARING CG 6209 ND160M

NDE BEARING CG 6209 ND160M

2 no Delivery: 60 days
#14

MOTOR COOLING FAN ASSY ND160M

MOTOR COOLING FAN ASSY ND160M

2 no Delivery: 60 days
#15

MOTOR TERMINAL BLOCKS ASSY ND160M

MOTOR TERMINAL BLOCKS ASSY ND160M

2 set Delivery: 60 days
#16

DE BEARING CG 6314 ND250MX

DE BEARING CG 6314 ND250MX

2 no Delivery: 60 days

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled Cheque copy

4

EFT Mandate certified by Bank

5

Vendor Code Creation documents

6

GST invoice format approval for GeM

7

Any prior similar-supply certificates (if available)

Technical Results

S.No Seller Item Date Status
1
BASANT ENGINEERING COMPANY   Under PMA
-03-04-2026 16:07:30

Financial Results

Rank Seller Price Item
L1
BASANT ENGINEERING COMPANY(MII)   Under PMA
Item Categories : NDE BEARING CG6314 ND250MX,MOTOR COOLING FAN ASSY ND250MX,MOTOR TERMINAL BLOCKS ASSY ND250MX,DE BEA

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Frequently Asked Questions

Key insights about TAMIL NADU tender market

How to bid for NDE bearing and motor assemblies tender in India 2026?

Bidders must create a GeM vendor code, submit PAN, GSTIN, cancelled cheque, and EFT mandate. Ensure GST-compliant invoicing and align with the 25% option quantity clause. Provide evidence of capability to supply bearings and motor assemblies NS112M/NS132S/ND160M/ND250MX, with optional quantities per order.

What documents are required for GeM vendor code creation and tender participation?

Submit PAN, GSTIN, cancelled cheque, EFT mandate certified by bank, and vendor code creation documents. Also upload GST invoice sample and organization’s financial disclosures if requested, to verify financial standing and compliance with GeM submission rules.

What are the delivery terms and extension rules for this tender?

Delivery starts from the last date of the original delivery order. If quantity increases, extension is ((increased quantity ÷ original quantity) × original period) with a minimum of 30 days. The buyer may extend within the contracted rate framework.

Which products are covered under this Bharat Heavy Electricals Limited tender?

The scope includes NDE BEARINGS CG6314, CG6205/CG6206/CG6305/CG6309 ND series, DE bearings, MOTOR COOLING FAN ASSEMBLY NS112M/NS132S/ND160M, and MOTOR TERMINAL BLOCKS ASSEMBLY NS112M/NS132S/ND160M. All items are for supply of goods only via GeM.

What are the invoicing requirements for GeM portal payments?

Invoices must be GST-compliant and uploaded on the GeM portal, including a screenshot confirming GST payment. Invoices must be raised in the consignee’s name with the consignee GSTIN to ensure timely payment processing.

What is the scope and eligibility criteria for bidders on this procurement?

Eligible bidders must not be in liquidation or bankruptcy, provide PAN and GST, and demonstrate the ability to supply the specified bearing and motor components. The contract allows up to 25% quantity variation and requires compliance with delivery & inspection terms via a nominated agency.