TenderDekho Logo
Closed GEM

Forest Department Maharashtra Pontoon Platform Tender Kolhapur 415101 25% Quantity Option 2026

Bid Publish Date

03-Oct-2026, 3:03 pm

Bid End Date

16-Oct-2026, 4:00 pm

EMD

₹25,000

Generate Docs

Progress

Issue03-Oct-2026, 3:03 pm
Corrigendum13-Oct-2026
AwardPending

Tender Overview

The Forest Department of Maharashtra invites bids for a Pontoon Platform procurement under the Revenue and Forest Department, Kolhapur (PIN 415101). The tender specifies an EMD of ₹25,000 and includes an option clause allowing a 25% quantity increase/decrease at contracted rates. Delivery timelines extend from the original delivery end date, with a minimum extension of 30 days for additional quantity. Bidders must satisfy bidder financial health checks and avoid liquidation or bankruptcy. The scope centers on an essential field equipment category withOEM installation involvement, and the award will depend on compliance with the option clause and integrity requirements. Unique aspects include a Malicious Code Certificate, End User Certificate handling, and OEM-certified installation requirements.

Technical Specifications & Requirements

  • Product: Pontoon Platform (Category: Q3) with installation, testing and commissioning as applicable
  • Delivery scope to be interpreted under the option clause; quantity changes up to 25% of bid quantity at contracted rates
  • Installation/commissioning must be performed by OEM or OEM-certified resource or an OEM-authorized reseller
  • Must include an End User Certificate via Buyer’s format and a Malicious Code Certificate asserting no embedded malware
  • Integrity Pact compliance and GST considerations per bidder responsibilities; GST payable per actuals or applicable rate up to quoted percentage
  • No BoQ items listed; emphasis on compliance with standard contracting terms and post-award delivery scheduling

Terms, Conditions & Eligibility

  • EMD: ₹25,000 (as per terms); payment conditions to be as per contract
  • Option Clause: quantity may vary by up to ±25% during contract with delivery calculations based on original and extended periods
  • Installation/Testing: performed by OEM-certified personnel; End User Certificate required as per buyer format
  • Security certificates: Malicious Code Certificate required; integrity pact to be signed and uploaded
  • GST: bidder bears GST responsibility; reimbursement at actuals or as per applicable rate, capped by quoted GST

Key Specifications

  • Pontoon Platform (Q3) to be supplied with OEM installation

  • Delivery quantity adjustments allowed up to 25% of bid quantity

  • Installation by OEM-certified resources or OEM-authorized reseller

  • End User Certificate in Buyer format; Malicious Code Certificate

  • Integrity Pact compliance and GST handling as per bidder responsibility

Terms & Conditions

  • Option to increase/decrease quantity by up to 25% during contract

  • EMD amount fixed at ₹25,000; payment terms per contract

  • OEM installation/commissioning must be performed by OEM-certified personnel

Important Clauses

Payment Terms

GST payable by bidder; reimbursement limited to actuals or quoted rate; payment terms aligned with contract

Delivery Schedule

Delivery period calculated from original delivery date; extended period uses the option clause formula with minimum 30 days

Penalties/Liquidated Damages

Not specified in data; standard contracting LDs may apply per purchaser terms

Bidder Eligibility

  • No current liquidation or bankruptcy proceedings

  • Demonstrated experience in supply/installation of pontoon platforms or marine platforms

  • Financial stability to cover performance and warranty obligations

Advertisement

Authority & Contact

Organization

Forest Department

Office Name

Wild Life Kolhapur 416212

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

5

OEM Avg. Turnover

20

Past Performance

30 %

Experience Required

1 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Pontoon Platform (Q3)

Advisory Bank

State Bank of India

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Kolhapur

Delivery Pincodes

416212

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Rajendra Dattatray Ghunkikar416212,SIMANTANI APPARTMENT C.S NO. 1, RAMANMALA KOLHAPUR 416212KolhapurMaharashtra416212115-

Authority Records

REVENUE AND FOREST DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9974256.pdf

Main Document

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Categories 2

Advertisement

Corrigendum Updates

1 Update
#1

Update

13-Oct-2026

Extended Deadline

16-Oct-2026, 10:30 am

Opening Date

17-Oct-2026, 10:30 am

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates (relevant to pontoon platforms or marine/workboat equipment)

4

Financial statements or solvency proof

5

EMD submission proof (₹25,000) through DD/online as applicable

6

Technical bid documents (compliance with OEM requirements, installation plan)

7

OEM authorization (where applicable) for OEM-certified installation

8

Integrity Pact signed and scanned

9

End User Certificate in Buyer format (if requested by bidder)

10

Malicious Code Certificate

11

Any other bidder-specific documents as per T&C

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid for pontoon platform tender in Kolhapur Maharashtra 2026

Bidders must meet eligibility criteria, submit ₹25,000 EMD, and provide GST, PAN, experience certificates, and OEM authorization. Include the End User Certificate and Malicious Code Certificate. Installations must be performed by OEM-certified personnel; comply with the 25% option quantity clause.

What documents are required for pontoon platform bid in Kolhapur

Required documents include GST certificate, PAN, experience certificates, financial statements, EMD proof for ₹25,000, OEM authorization, integrity pact, End User Certificate, and Malicious Code Certificate. Ensure submission aligns with T&C and bidder integrity requirements.

Which standards or certificates are mandated for installation

Installation must be performed by OEM-certified personnel or OEM-authorized resellers; submit Integrity Pact, End User Certificate, and Malicious Code Certificate. While no explicit IS/ISO numbers exist in data, OEM certification is mandatory for installation compliance.

What is the impact of the 25% quantity option on delivery

Contract allows a ±25% quantity variation; delivery dates shift according to calculated extended period using the formula (Extended quantity/original quantity) × original delivery period with a minimum 30 days extension.

How is GST handled for this pontoon platform tender

Bidders bear GST calculations; reimbursement is either at actuals or the applicable rate, whichever is lower, limited by the quoted GST percentage in the bid.

What is the EMD amount and its submission method

EMD is ₹25,000; submit via eligible online payment or demand draft as per tender terms, and attach proof of payment with the technical bid submission.

What is required regarding End User Certificate in this bid

If required, bidders must provide the End User Certificate in the buyer’s standard format; ensure it is included with the bid submission to avoid disqualification.

What happens if the OEM refuses installation responsibilities

Unmet OEM installation requirements can lead to non-compliance; ensure a valid OEM-certified installation plan or approved OEM-authorized reseller arrangement is included in the bid.

Advertisement